The KM3NeT Project  Objectives  Current membership and funding  Preparatory Phase  The EMSO connection  Structural funds ESFRI Meeting, Brussels,

Slides:



Advertisements
Similar presentations
P. Sapienza, Laboratori Nazionali del Sud (INFN)NOW2004, sept A km 3 detector in the Mediterranean: status of NEMO Motivation for a km 3 detector.
Advertisements

Side 1 Mat.-nat. Fak. søndag, 20. juli 2014 Norwegian participation in EMSO - European Multidisciplinary Seafloor Observation UoT J. Mienert Det matematisk–
NMP-NCP meeting - Brussels, 27 Jan 2005 Towards FP 7: Preliminary principles and orientations… Nicholas Hartley European Commission DG Research DG Research.
Trigger issues for KM3NeT the large scale underwater neutrino telescope the project objectives design aspects from the KM3NeT TDR trigger issues outlook.
Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
Steven KrauwerCLARIN-NL Launch CLARIN-EU: Where do we stand? Steven Krauwer Utrecht institute of Linguistics UiL OTS CLARIN-EU Coordinator.
Concluding remarks The physics case is strong and it has large complementarity to other astroparticle detectors The way to a final design for the northern.
The Neutrino – Gamma Ray Connection
Neutrino Astronomy with KM3NeT  The KM3NeT physics case  What happened so far  The KM3NeT Conceptual Design Report  The Preparatory Phase: Towards.
Health systems and long-term care for older people in Europe. Modelling the interfaces between prevention, rehabilitation, quality of services and informal.
A. BELIAS, NESTOR Institute, Pylos, Greece TeVPA 2009, July 13-17, SLAC1 KM3NeT, a deep sea neutrino telescope in the Mediterranean Sea KM3NeT objectives.
ANTARES aims, status and prospects Susan Cartwright University of Sheffield.
Status of the KM3NeT Design Study  History and structure  Tasks and progress  The European context  Context of decisions to be taken  Conclusions.
Status of the KM3NeT Project  What happened so far  The KM3NeT Conceptual Design Report  The Preparatory Phase: Towards Implementation 3rd Workshop.
P. Sapienza, NOW 2010 The KM3NeT project  Introduction & Main objectives  The KM3NeT Technical Design Report  Telescope physics performance  New developments.
Antares/KM3NeT M. de Jong. neutrinos  p Scientific motivation: – origin cosmic rays – birth & composition relativistic jets – mechanism of cosmic particle.
KM3NeT ESFRI/PSE-WG meeting, 3 December 2013, Brussels Maarten de Jong & Paschal Coyle on behalf of KM3NeT 1 The next generation neutrino telescope in.
Introduction to future synergy options Uli Katz ECAP, Univ. Erlangen Deep Ocean Cabled Observatories Amsterdam, May 2012.
The KM3NeT Project: A km 3 -scale Mediterranean Neutrino Telescope Oleg Kalekin For the KM3NeT Consortium Locating PeV Cosmic-Ray Accelerators Adelaide,
Paolo Piattelli - KM3NeTIAPS - Golden, 6-8 may 2008 KM3NeT: a deep-sea neutrino telescope in the Mediterranean Sea Paolo Piattelli - INFN/LNS Catania (Italy)
KM3NeT The Birth of a Giant V. Popa, KM3NeT Collaboration Institute for Space Sciences, Magurele-Bucharest, Romania.
Oct 2009 – Hervé PERO, European Commission VLVvT 09 Athens meeting The EU and Global issues.
KM3NeT: Towards a km 3 Mediterranean Neutrino Telescope  Some Physics Arguments  Aiming at a km 3 Detector in the Mediterranean Sea  The KM3NeT Design.
Status and performance R. Coniglione for KM3NeT collaboration INFN- Laboratori Nazionali del Sud Catania - Italy R. Coniglione Marseille 4-6 April
C.DistefanoCRIS 2008 – Salina, September The KM3Net Consortium Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud Towards a km3-scale.
Status of KM3NeT (Detector Design Optimisations) Christopher Naumann, CEA Saclay – IRFU / SPP for the KM3NeT consortium 44 th Reconcontres de Moriond,
KM3NET 24 September 2004 Gerard van der Steenhoven (NIKHEF)
The KM3NeT Preparatory Phase Project  Objectives  Current membership and funding  The Preparatory Phase project KM3NeT Meeting, Pylos, April 16, 2007.
Neutrinos as Cosmic Messengers in the Era of IceCube, ANTARES and KM3NeT Uli Katz ECAP / Univ. Erlangen Vulcano Workshop 2012 Frontier Objects.
European Virtual Seminar on Sustainable Development.
The HEAP-MM proposal P. Piattelli VLVnT The call  INFRA Research Infrastructures for astroparticle physics: High energy cosmic rays,
Sophie Sergent Ifremer European Affairs Department / MariFish WP7 ERANET MariFish COORDINATION OF EUROPEAN MARINE FISHERIES RESEARCH Presentation of MariFish.
EMSO – PP European Multidisciplinary Seafloor Observation Preparatory Phase PROJECT OVERVIEW.
1 Support for New Research Infrastructures in the EU 7 th Framework Programme for Research Elena Righi European Commission SKADS Workshop, Paris, 4 September.
IIIrd SeaSearch Full Group Meeting Limassol, Cyprus Tuesday May 25-27, 2004 SeaDataNet-Design Study proposal.
The NEMO Project: Toward a km 3 Neutrino Telescope in the Mediterranean Sea M. Circella, INFN Bari NUPPAC-05, Nov The NEMO Project (NEutrino Mediterranean.
Stabilisation & Association Process: the EU Policy for South East Europe Brussels December 2004.
FP7 – Nov Towards the EU Seventh Framework Programme (FP7) European Commission Research DG.
CEA DSM Dapnia - L. Moscoso - KM3NeT23/06/ KM3NeT L. Moscoso DAPNIA/SPP CEA/Saclay.
Time over Threshold electronics for an underwater neutrino telescope G. Bourlis, A.G.Tsirigotis, S.E.Tzamarias Physics Laboratory, School of Science and.
WG4: High-Energy Neutrinos – Mainly Neutrino Telescopes  Projects  Some background information  Project summaries & resources ASPERA Workshop, Amsterdam.
Arctic Connections Policy frameworks for regional co-operation TOWARDS AN EU POLICY and the ARCTIC INFORMATION CENTRE INITIATIVE Jaime Reynolds DG Environment.
Neutrino Astronomy with KM3NeT  The KM3NeT physics case  What happened so far  The KM3NeT Conceptual Design Report  The Preparatory Phase: Towards.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Introduction to the Meeting  Schedule  Recent developments  Objectives and issues KM3NeT Meeting, Pylos, April 16, 2007 Uli Katz Univ. Erlangen.
Astroparticle Physics for Europe Purpose of the meeting and EU funding status 1. Introduction: purpose of the meeting and EU-funding status Gerard van.
NESTOR-KM3NET Presented by Ion Siotis National Centre for Scientific Research DEMOKRITOS ECFA meeting, Athens, October 2008.
Richard Escritt, Director – Coordination of Community Actions DG Research, European Commission “The development of the ERA: Experiences from FP6 and reflections.
WPI / N: What remains to be done Uli Katz ECAP / Univ. Erlangen WPD+I+N Report, Catania,
Investment into smart growth! How we can help!. “…the EU and its Member States should adopt a strategic and integrated approach to innovation whereby.
Towards the TDR KM3NeT-DS WPx Meeting, Paris, Feb , 2009 Uli Katz ECAP / Univ. Erlangen  My private views  Basis for discussion  Decisions taken.
Alexander Kappes ECAP, Universität Erlangen-Nürnberg for the KM3NeT Consortium 2009 EPS HEP, Krakow, 16. July 2009 The KM3NeT project: Towards a km 3 -scale.
Top Management Programme 22 September 2005 Amanda Crowfoot Director UK Research Office Tel.:
IGST 12 – August 2007 – St Johns EURO-ARGO A new European Infrastructure for Research.
2012 a year of transition Paschal Coyle, Mauro Taiuti, E. de Wolf IB-meeting, 29 January 2013, CPPM.
Research & Innovation Preparatory Phase and Early Phase Support under the WP * of Horizon 2020 Harry Tuinder Research Infrastructure Unit DG Research,
KM3NeT P.Kooijman Universities of Amsterdam & Utrecht for the consortium.
Shebli Anvar – CEA Saclay, Irfu On behalf of the KM3Net Consortium
ANTARES Lessons learned from its completion
KM3NeT multi-km3 neutrino telescope: perspectives
Concluding remarks E. Migneco
Marine and Environmental Agencies
WP4: High-Energy Neutrinos
KM3NeT: where are we and where do we go
Cherenkov Telescope Array
First Call in 2008: Type of Proposals
WP4 Positioning European Astroparticle Physics in the world-wide context WP leader CNRS Partners: FOM, IFIN-HH, FRS-FNRS/FWO, FCT Total work: 22 months.
Strategic Steering Group
Experience of the implementation of FP6; preparations towards FP7
Toitototototoot Strengthening consistency, coordination & cooperation between nature, biodiversity, water & marine policy Some feedback from France.
Presentation transcript:

The KM3NeT Project  Objectives  Current membership and funding  Preparatory Phase  The EMSO connection  Structural funds ESFRI Meeting, Brussels, Uli Katz Univ. Erlangen

ESFRI Meeting, Brussels, U. Katz: The KM3NeT Project 2 KM3NeT Objectives  Observe high-energy cosmic neutrinos - Opens new window to the most violent processes in the universe - Key objective of astroparticle physics - Convergence towards two major neutrino telescopes covering the full sky: Mediterranean Sea: Lake Baikal: KM3NeT ANTARES NEMO NESTOR Antarctica: AMANDA IceCube Baikal experiment ?  Provide infrastructure for long-term deep-sea measurements - Highly interesting for marine biologists, geologists and geophysicists, environmental scientists, oceanographers, …. - Strong links to the EMSO project.

ESFRI Meeting, Brussels, U. Katz: The KM3NeT Project 3 How Neutrino Telescopes Work  Earth: screening against other particles  Neutrino telescopes look downward (at high energies: also upward sensitivity!)  Neutrinos interact weakly  ~1 km 3 (1 billion tons) target material  Light signals are weak  need environment shielded against daylight KM3NeT IceCube ESFRI Meeting, Brussels, U. Katz: The KM3NeT Project 3 3 Galactic Centre

ESFRI Meeting, Brussels, U. Katz: The KM3NeT Project 4  3-year FP6 Design Study, Feb – Jan. 2009, 9 M€ from EU, overall budget ~20 M€  Participants: 30 Particle/Astroparticle institutes + 7 Sea science/technology institutes  Main Deliverables - Conceptual Design Report (fall 2007) - Technical Design Report (early 2009) The KM3NeT Design Study } from 9 EU countries:

ESFRI Meeting, Brussels, U. Katz: The KM3NeT Project 5  Pilot projects: - ANTARES (cap. investment only)20.1 M€ FR, GER, IT, NL, ES funding agencies14.5 M€ France: Regional sources 1.9 M€ FEDER/France 3.7 M€ - NEMO ( IT, cap. investment only) 17.0 M€ IT funding agencies10.9 M€ FEDER/Italy 6.1 M€ - NESTOR (GR, cap. investment only) 8.0 M€ Greek government 6.5 M€ FEDER/Peloponnese 1.5 M€ _______ 45.1 M€  KM3NeT (cap. + pers.) ca.11.0 M€ CY, FR, GER, GR, IRL, IT, NL, ES, UK funding agencies and other sources Current National/Regional Funding

ESFRI Meeting, Brussels, U. Katz: The KM3NeT Project 6  Application in preparation (time very tight due to overlap with 1st-year Design Study report)  Major objectives to be addressed: - Path to convergence on funding decisions (KM3NeT cost estimate: roughly 250 M€) - Legal and governance aspects - Site decision (including assessment of multi-site options) - Production preparation - Data dissemination, data formats, computing - Coordination with marine sciences  Major goal: - Go ahead with construction in 2010/11! The KM3NeT Preparatory Phase Proposal

ESFRI Meeting, Brussels, U. Katz: The KM3NeT Project 7  Large overlap in participating institutes - IFREMER, INGV, HCMR, Oceanlab/Aberdeen, … - Marine sciences represented in all KM3NeT management and steering bodies - Regular informal exchanges  Funding agencies are aware - INFN requests cross-coordination of KM3NeT and EMSO PP proposals - …  KM3NeT site(s) likely to become part of EMSO The EMSO Connection

ESFRI Meeting, Brussels, U. Katz: The KM3NeT Project 8  ERDF funds may be a major source of KM3NeT construction money - ERDF and FP7 run concurrently ( ) - KM3NeT candidate sites are target-1/target-2 regions  Political coordination needed - Cross-coordination between ESFRI, EU DG Research (FP7), EU DG Regio (ERDF) and national authorities to promote research infrastructures - Avoid conflicting boundary conditions in both programs - Support for the concept of spending regional funds locally, but in the framework of pan-European projects  The situation must be clarified very soon! Structural Funds