MERIT beam optics I.Efthymiopoulos – CERN, AB Dept. MERIT, VRVS Meeting July 16, 2008.

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

MERIT Pump/Probe Data Analysis Outline  The pump/probe program  Particle detector response correction  Pump/probe analysis results NFMCC Collaboration.
5/3/2015J-PARC1 Transverse Matching Using Transverse Profiles and Longitudinal Beam arrival Times.
J. Rudolph, Helmholtz-Zentrum Berlin EuCARD 2nd ANNUAL MEETING Slice emittance measurements at the ELBE superconducting RF photoinjector.
Cryomodule Quad Doublet Solutions – M Church 9/12/07 1 NML Cryomodule Quad Doublet Lattice Solutions  Question  Are quadrupoles required as part of the.
MERIT beam spot size Goran Skoro 15 July How to extract a beam size? z(x,y) distribution is in a saturation here 1 st approach: To fit projections*
Low beam intensity (MERIT beam spot size – part II) Goran Skoro 30 June 2008.
Harold G. Kirk Brookhaven National Laboratory MERIT Experiment Status NFMCC Collaboration Meeting FNAL March 17-20, 2008.
Pion capture and transport system for PRISM M. Yoshida Osaka Univ. 2005/8/28 NuFACT06 at UCI.
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
Wayne R. Meier Lawrence Livermore National Lab Heavy Ion Fusion Modeling Update - Spot Size Model Changes* ARIES Meeting April 22-23, 2002 * This work.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
Collaboration meeting, Ocotober 2005A.Fabich, CERN AB-ATBResponse from the APC, 1 MERIT beam request A.Fabich CERN AB-ATB
MERIT beam spot from optics (update of July 16,2008 talk) I.Efthymiopoulos – CERN, AB Dept. MERIT, VRVS Meeting September 25, 2008.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
Energy deposition of 24 GeV/c protons in gravity affected mercury jet Sergei Striganov Fermilab April 1, 2009.
Particle flux simulations Sergei Striganov Fermilab June 11, 2008.
Mon 03 July 06Laserwire Mini-Workshop1 Using Laserwires to Measure Emittance at the ILC Leo Jenner, Daresbury Labs.
Harold G. Kirk Brookhaven National Laboratory Proton Beam Spot Size MERIT EVO Meeting September 10, 2008.
Mark Rayner, Analysis workshop 4 September ‘08: Use of TOFs for Beam measurement & RF phasing, slide 1 Use of TOFs for Beam measurement & RF phasing Analysis.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
MERIT analysis - Beam spot size Goran Skoro More details: UKNF Meeting, Oxford, 16 September 2008.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
Fifth ATF2 Project Meeting, dec. 2007, KEK, Japan Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault,
After last meeting Matt, Riad and I discussed January energy choice…  Focus on Physics paper measurements  Focus on 5 MeV systematics  Pick “final”
Update of 3.2 km ILC DR design (DMC3) Dou Wang, Jie Gao, Gang Xu, Yiwei Wang (IHEP) IWLC2010 Monday 18 October - Friday 22 October 2010 Geneva, Switzerland.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
E. Karantzoulis - BESSY, June Elettra2.0-The next generation Emanuel Karantzoulis Circumference m 12 fold symmetry Energy 2 (& 2.4 GeV.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
Page 1 Overview and Issues of the MEIC Interaction Region M. Sullivan MEIC Accelerator Design Review September 15-16, 2010.
July 19-22, 2006, Vancouver KIRTI RANJAN1 ILC Curved Linac Simulation Kirti Ranjan, Francois Ostiguy, Nikolay Solyak Fermilab + Peter Tenenbaum (PT) SLAC.
A. Leveling - Fermilab Recent Operating Experience at the Antiproton Source Target Hall 3 rd High Power Targetry Workshop September 12, 2007 Fermilab Accelerator.
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault, Brossard, P. Bambade (LAL) Main goal : - Try to improve.
PSB-PS TRANSFER AT 2 GEV - CONCEPTS AND OPTICS W. Bartmann, J. Abelleira et al. ABT LIU Review, 20-Nov-15.
SL/BI 16/05/1999DIPAC’99 -- JJ Gras -- CERN SL/BI -- Adaptive Optics for the LEP 2 SR Monitors G. Burtin, R.J. Colchester, G. Ferioli, J.J. Gras, R. Jung,
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
1 NFMCC Friday Meeting January 4, 2008 Optical Diagnostic Results of MERIT Experiment at CERN HeeJin Park.
A.Saini, K.Ranjan, N.Solyak, S.Mishra, V.Yakovlev on the behalf of our team Feb. 8, 2011 Study of failure effects of elements in beam transport line &
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
Choppers Comparison of three schemes of choppers is made 2.5 MeV and 2.1 MeV beam energies are considered Presented by Boris Shteynas May,
B. Marchetti R. Assmann, U. Dorda, J. Grebenyuk, Y. Nie, J. Zhu Acknowledgements: C. Behrens, R. Brinkmann, K. Flöttmann, M. Hüning,
Stopped K beam at J-PARC Designed by J.Doornbos 1)Optics design of a K0.8 branch 2)Performance 3)Pion contamination 4)Comments on K1.1 Nov. 4, 2005 Korea.
Primary Beam Lines for the Project at CERN
Measurements and analysis of beam parameters at post-IP wire-scanner
Visit to IHEP September 2015: recommendations for CEPC
M. Sullivan for the SLAC SuperB Workshop Jan , 2009
Large Booster and Collider Ring
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
SBS Magnet, Optics, and Spin Transport
LHC Emittance Measurements and Preservation
Jeffrey Eldred, Sasha Valishev
CNGS Proton Beam: Introduction

TT20 MD for the NA61/SHINE fragmented beam experiment
TT20 MDs for the NA61/SHINE fragmented beam experiment
ELENA Extra Low ENergy Antiproton Ring
MERIT beam request A.Fabich CERN AB-ATB
Present and Future test facilities for High-intensity Targetry CERN
MEBT1&2 design study for C-ADS
Injector Setup for G0 and HAPPEX & Lessons Learned
Optics Measurements in the PSB
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
He Zhang, David Douglas, Yuhong Zhang MEIC R&D Meeting, 09/04/2014
Presentation transcript:

MERIT beam optics I.Efthymiopoulos – CERN, AB Dept. MERIT, VRVS Meeting July 16, 2008

September 11, 2007I.Efthymiopoulos - CERN2 MERIT Elements – Layout QFO.415s (focusing) quads 3 elements in series QDE.430s (de-focusing) quads 3 elements in series

Survey data after the MERIT run – September 11, 2007I.Efthymiopoulos - CERN3 Upstream face: -72.3cm

Beam optics Fit parameters: QFO, QDO strengths and locations (within limits) September 11, 2007I.Efthymiopoulos - CERN4

Beam envelope (1-sigma) -  =0.25 (mm.mrad), Dp=0.1% September 11, 2007I.Efthymiopoulos - CERN5 Without dispersion term With dispersion term  x) = 2.2mm,  y) = 0.86 mm, 164

Beam optics – summary Optics solution found within the overall constrains Lack of survey before the data-taken introduced an error to the beam focus position Beam waist advanced by ~1m upstream of solenoid Beam spot estimate depends on emittance measurement We did not insist of having systematic measurement of the beam emittance during the run Only five measurements done September 11, 2007I.Efthymiopoulos - CERN6

June 3, 2015I. Efthymiopoulos - CERNMERIT - VRVS Meeting - 7 Beam Emittance measurement – 14 GeV/c Friday Beam intensity: h16, 1E13

June 3, 2015I. Efthymiopoulos - CERNMERIT - VRVS Meeting - 8 Beam Emittance measurement – 14 GeV/c Friday Beam intensity: 2.5E11/bunch 2 extracted bunches, DT=1.7us

June 3, 2015I. Efthymiopoulos - CERNMERIT - VRVS Meeting - 9 Beam Emittance measurement – 14 GeV/c Friday Beam intensity: 1.3E12/bunch 2 extracted bunches, DT=1.7us

June 3, 2015I. Efthymiopoulos - CERNMERIT - VRVS Meeting - 10 Beam Emittance measurement – 24 GeV/c Friday Beam intensity: 2.5E11/bunch 16 bunches

June 3, 2015I. Efthymiopoulos - CERNMERIT - VRVS Meeting - 11 Beam Emittance measurement – 24 GeV/c Friday Beam intensity: 16 bunches, 6E12 protons

Emittance measurement Use the data to extrapolate at higher intensities September 11, 2007I.Efthymiopoulos - CERN12

Estimated beam spot and density Use the extrapolated emittances to estimate the beam spot and energy density at target Example : 24 GeV, 30 TP September 11, 2007I.Efthymiopoulos - CERN13