11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

Cold Powering of the HL-LHC magnet system WP6 Motivation Work Package description Tasks Partners & resources Amalia Ballarino HL-LHC Design Study – 3 rd.
Eucard2-WP10 Reminder of engagement of each partner Lucio Rossi WP10 coordinator.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
Applied superconductivity group L. García-Tabarés, F. Toral, I. RodriguezCIEMAT, I/2008.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
Superconducting Large Bore Sextupole for ILC
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
Superconducting Magnet Division Ramesh Gupta High Field Magnet R&D with YBCO July 26, 2011Slide No. 1 EUCARD2 VIDEO CONFERENCE.
EuCARD’13, Progress--HFM, 11 th June 2013, GdR 1 Progress in EuCARD and plans for EuCARD2 Gijs de Rijk 11 th June 2013 CERN.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Kick-off meeting 07/07/2014.
October 30 th Advances in Heat Transfer in High Field Accelerator Magnet B. Baudouy CEA/Saclay - Dapnia/SACM Annual meeting CARE October.
EuCARD2 Magnet Status and action plan
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
CERN/CEA Collaboration agreement No. KE2275/TE WP4 – Nb 3 Sn technology development Pré-Kick-off meeting 03/07/2014.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
Technical agreement n 3 New SC Magnets activities P. Fessia (G. De Rijk), D. Reynet, J.M Rifflet.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
FCC kick-off meeting a summary for magnets L. Bottura
Superferric CEA. CEA is involved in the FAIR/GSI project: Responsible for the conceptual design preparation and technical follow-up of 24 superferric.
General Considerations for the Upgrade of the LHC Insertion Magnets
15 Th November 2006 CARE06 1 Nb 3 Sn conductor development in Europe for high field accelerator magnets L. Oberli Thierry Boutboul, Christian Scheuerlein,
HFM-WP7 Status, FK & GdR, April WP7 HFM Status F. Kircher (CEA Saclay) and Gijs de Rijk (CERN) EuCARD Annual meeting RAL, April 2010.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
LARP Magnet Progress Michael Lamm For the LARP Collaboration bnl - fnal - lbnl - slac US LHC Accelerator Research Program All Experimenters’ Meeting Monday,
HFM-EuCARD, GdR, 14 October EuCARD magnet development Gijs de Rijk CERN EUCARD - HE-LHC'10 ACCNET MINI-WORKSHOP ON A “HIGH-ENERGY LHC” Malta,
FET-OPEN proposal for a HTS fast cycled magnet for Energy Efficiency and Operational Flexibility Motivations SC magnets are the choice of reference to.
AccNet-HE, , Magnet R&D Eu, GdR Joint Snowmass-EuCARD/AccNet-HiLumi LHC meeting 'Frontier Capabilities for Hadron Colliders 2013’ February.
Joint IR Studies: Operating Margins Nikolai Mokhov Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program LARP Collaboration Meeting SLAC.
CERN Accelerator School Superconductivity for Accelerators Case study 3 Paolo Ferracin ( ) European Organization for Nuclear Research.
HI-LUMI-LARP, 18 Nov 2011: LB & GdR; HFM & HE-LHC High Field Magnet program and HE-LHC Luca Bottura & Gijs de Rijk CERN 1.
HE-LHC, 10/14/2010GianLuca SabbiUS LARP Magnet Development LHC Accelerator Research Program Magnet Development GianLuca Sabbi for the US LARP collaboration.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
Dipole review, January Dipole design review: outlines of talks Gijs de Rijk, Francois Kircher and Jean- Michel Rifflet.
A. BallarinoEucard, 8 th WP7 HFM Annual MeetingWarsaw,24/04/2012 High-Tc Superconducting Link Status of Task 7.5 Eucard 2012, 8 th WP7 HFM Collaboration.
Overview and Status of The CERN-INFN Collaboration Agreement for R&D Activities Relating to High- Luminosity LHC (HL-LHC) Superconducting Magnets Giovanni.
HTS for Upgrades: overview of test requirements Amalia Ballarino, CERN Review of superconductors and magnet laboratories, A. Ballarino.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
A. BallarinoEucard MeetingCERN,20/03/2013 High-Tc Superconducting Links for the LHC WP 7 – Task 5 A.Ballarino, TE-MSC, CERN Task 5 participants : A. Ballarino,
Fresca2 Technical meeting, 9 th june 2015, Gdr, relevance for FCC 1 Relevance of SMC/RMC/Fresca2/Inserts for FCC Gijs de Rijk 9 th June 2015 CEA Saclay.
CERN plans on high field magnet development ¤ Present situation of the LHC ¤ Sc magnet activities beyond LHC start ¤ R&D topics ¤ On going ¤ Conclusions.
FCC EuroCirCol kick-off,CERN, 3 rd June 2015.
HFM coll. meeting, Febr , G. de Rijk, Summary of WP 1 Summary of the work-package. HFM: Superconducting High Field Magnets for higher luminosities.
EuCARD WP 7 – High Field Magnets Task 7.2 Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2 Status report EuCARD HFM collaboration.
Report from Session 2 Main Dipoles. P. McIntyre 2005 – 24T ss Tripler, a lot of Bi-2212, Je = 800 A/mm2 E. Todesco T, 80% ss 30% NbTi 55 %NbSn.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
1 R&D Plan Proposal for CERN-KEK Collaboration Tatsushi NAKAMOTO KEK CERN-KEK collaboration: Magnet R&D Review at CERN, Dec. 13, 2011.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Aim and goals Mini Workshop of Accelerators Radiation Mini Workshop of Accelerators Radiation.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
CERN, 11th November 2011 Hi-lumi meeting
Task 5: High-Tc superconducting link Summary of work-package
SLHC –PP WP6 LHC IR Upgrade - Phase I.
The R&D programme on High Field Magnets (HFM)
Task T HTS Dipole Magnet Design and Construction
Task 10.3 : 5T HTS Dipole Magnet Design and Construction
CERN-INFN, 23 Febbraio 2017 Stato del programma 16 T Davide Tommasini.
To be presented at Nb3Al R&D Review,
EuCARD2 WP 10.2 HTS Conductor
Qingjin XU Institute of High Energy Physics (IHEP),
Presentation transcript:

11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages

11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)2 Future magnet needs 2 categories: max field <9 T : Nb-Ti technology Max field >9 T up to 15 T : Nb 3 Sn technology Common points: Radiation hardness, heat removal and temperature margin and The Low-beta quad, dispersion suppressor dipole and slim dipole need the Nb 3 Sn Jc at maximum coil fields >9 T and in some cases >13 T

11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)3 Work program To be seen in conjunction with the CERN program on HFMs   Support Studies Study thermal properties Study radiation resistance of components and coils   Model magnet Design build and tests short dipole model (1 m m)   Prototype magnet Design build and tests long prototype magnet (4 m - 8 m) Dipole or quadrupole: to be decided later depending on LHC needs

11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)4 NED history and future requirements   FP6 NED project for a 1 m long, 12 T bore field, 88 mm aperture model   reduced version was approved (25% funded): preparation of the technologies needed for the model Conductor development Design studies (i.e. magnet design, thermal studies) Component development (i.e insulators)   NED magnet was intended to upgrade the FRESCA facility to a 12T cable test station   The FRESCA facility upgrade is still strongly needed: key element for HFM conductor development and QA   Putting together the FRESCA needs and some common issues on the envisaged dipole needs:   Build a 1 m-1.5 m long, 13T bore field, 110 mm-130 mm aperture model magnet, to Upgrade FRESCA Constitute a test bed for the LHC and   dipole magnets   Conductor: Profit from NED development and CERN HFM program

11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)5 Prototype magnet   An important step towards an accelerator magnet is a full length prototype   For the LHC the choice is still open to what is the most relevant type: 4 m - 8 m long, 200 T/m gradient, 130 mm aperture quadrupole or 4 m - 8 m long, 13 T bore field, 130 mm aperture dipole   To test the scale-up of Long conductor length of Nb 3 Sn cable Coil manufacturing technology, winding, reacting (650  C), handling of long coils Support structure scale up

11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)6 WP list

11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)7 WP1 Management and Coordination   Task Manage the package   Deliverables Follow -up of the progress in the technical WPs Regular reporting to EU and participants’ management (yearly report) Planning Financial follow up (quarterly report)   Budget: Material, travel 0.16 M€, Personnel 0.12 M€

11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)8 WP2 Support Studies   Tasks Radiation resistance studies on materials for SC magnets Nb3Sn Insulation Thermal stability studies Heat deposition models Heat removal models Heat removal measurements   Deliverables and milestones start M1 radiation resistance of Nb3Sn certifiedM36 radiation resistent insulation certifiedM36 rediation resistent impregnation certifiedM36 Heat deposition and heat removal model M12 with experimental validation. Thermal coil design parameters for M24 dipole and quad design   Budget: Material 0.8 M€ Personnel 1.7 M€

11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)9 WP3 High Field Dipole Model   1 m-1.5 m long, 13 T, 110 mm-130 mm aperture dipole model magnet Conductor selection and characterization Coil geometry Insulation type Coil manufacturing technology Mechanical support/pre-stress structure   Tasks Conductor qualification Make a design for the model Tooling construction and installation Produce the coils Produce the cold mass Test the model   Deliverables and milestones start M1 Tooling installed 6M Conductor qualified8M Design report12M Coils18M Cold mass24M Cold test27M   Budget: Material 1.0 M€ Personnel 1.2 M€

11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)10 WP4 High Field prototype   4 m - 8 m long, 130 mm aperture prototype magnet 13 T Dipole or 200 T/m quadrupole, to be studied depending on LHC relevance Coil manufacturing technology scale-up (shrinkage, expansion during reaction) Mechanical support/pre-stress structure scale-up   Tasks Make a design for the prototype Tooling construction and installation Produce the coils Produce the cold mass Test the model   Deliverables and milestones start M18 Tooling M30 Design report30M Coils39M Cold mass45M Cold test48M   Budget: Material 1.9 M€ Personnel 1.1 M€

11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)11 Planning

11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)12 Partners   Partners have been contacted recently with a request to form a collaboration CEA-Saclay Already expressed interest before, waiting for official answer STFC-RAL Already expressed interest before, waiting for official answer CIEMAT waiting for answer Univ. Twente Positive answer, details to be worked out Univ. Wroclaw waiting for answer INFN Milano waiting for answer INFN Genova Declined Univ. Genève Discussion ongoing   We will ask for more partners e.g. : Univ. Berlin KFA Karlsruhe

11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)13 WP opt1 Very High Field Dipole Insert   1 m long, 25 mm aperture HTS dipole insert to approach 20 T  B = 5 T-7 T in a 12 T-13 T background field Bi-2212 round wire (Rutherford cable ) or YBCO 2nd generation tape Technology demonstrator of possibilities to use HTS conductor in an accelerator magnet environment To regain Europe’s place on this technology   Tasks Conductor qualification Make a design for the insert Produce the coils Assemble the insert Test the insert   Planning M18 - M48   Budget: Material 1.0 M€ Personnel 1.0 M€

11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)14 WP opt2 Two-in-one high field dipole model   1 m long, 12 T bore field, 60 mm aperture two-in-one dipole model Intended to show the way for the LHC dispersion suppressor upgrade   Tasks Conductor qualification Make a design for the model Produce the coils Produce the cold mass Test the model   Planning M18 - M48   Budget: Material 0.7 M€ Personnel 0.9 M€