CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, 2009 1 Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.

Slides:



Advertisements
Similar presentations
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Advertisements

Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004.
Large-acceptance superconducting dipole magnet GLAD Magnet parameters: Large vertical gap ± 80 mrad High integrated field of 4.5 Tm Fringe field at the.
UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Sergey Kozub Institute for High Energy Physics Protvino, Russia SIS300 meeting 19 March, 2009 Sergey.
Guenther Rosner FAIR Design Study, PANDA 3, GSI, 19/1/06 1 PANDA3: Magnet design and integration of detectors Tasks & participants Progress Milestones.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
-1- Wang, Li The 23rd MICE Collaboration Meeting to 17 HIT/CHINA WANG, Li Institute of Cryogenics and Superconductivity Technology.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
CBM Superconducting Dipole Magnet
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
ESS cavities interfaces
Magnet designs for Super-FRS and CR
FNAL Meeting, July 2006 Basti, Bedeschi, Raffaelli, INFN-Pisa 1 ILC cryomodule mechanical work at INFN-Pisa  Ongoing work  Near term future  Manpower.
IHEP participation in SIS300 production UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Institute for High Energy Physics Protvino, Russia FAIR meeting.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Stress and Cool-down Analysis Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
Compressor status AWAKE Technical Board meeting 19 August 2015.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
CEA DSM Irfu - F. KIRCHER - [Seoul Workshop, Feb 16-18, 2009] 1 ILD detector magnet: LoI version F. Kircher, O. Delferrière CEA Saclay, DSM/Irfu/SACM.
ILD Magnet & calorimeters integration meeting Questions to be addressed 01-02
CEA DSM Dapnia DIRAC-Phase-1 Annual Report meeting Status of the R3B-GLAD Magnet DIRAC-Phase-1 Annual Report Meeting 26 September 2006 Bernard Gastineau.
ILD solenoid magnet construction in Kitakami-site 17. December Tokusui Workshop KEK : Y.Makida, T.Okamura, Y. Sugimoto Toshiba : Nakamoto 、 Orikasa.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
LARP Collaboration Meeting Racetrack Coil Fabrication
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
CEA DSM Irfu WP 7.4 : Insert design and construction M. Devaux J-M Rey, M. Durante, P. Tixador, C. Pes 18/09/2012HFM collaboration meeting WP 7 - Milano.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
J. Polinski, B. Baudouy -The NED heat transfer program at CEA CEA Saclay, January 11th NED heat transfer program at CEA NED heat transfer program.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
The Super-FRS Multiplet, Magnetic and Cryogenic requirements
Teleconf ACS – FREIA 28th March 2017
Status of the PANDA Solenoid Magnet Production in BINP
Update on PANDA solenoid design
CBM magnet overview of the BINP work
11 T Dipole Integration & Plans M. Karppinen
Meeting for S1-Global module design Cryomodule and Cryogenics
HFM Test Station Main Cryostat
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
(Procurement, testing of magnets)
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
Design of Distribution Feedbox at LHC P7
Status of the PANDA Solenoid Magnet Production in BINP
BESIII Collaboration Meeting, June 5~6, 2002, Zian Zhu
Teleconference ACS – FREIA 20th February 2018
Updated concept of the CBM dipole magnet
UPPSALA UNIVERSITY_GERSEMI PROJECT
Presentation transcript:

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance Dipole R 3 B-Glad Status Bernard Gastineau DSM Irfu, CEA Saclay R3B Technical Board Meeting GSI April 27, 2009

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Magnet design : –Cold Mass new design –Cryostat new design Experimental area Fabrication of the magnet Schedule R3B - Large acceptance dipole magnet

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Last coil configuration – 5.2 tons Large acceptance dipole The six trapezoidal racetrack coils are tilted with respect to the beam direction. There are two main coils and four lateral coils which are connected in series in a butterfly-like shape.

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Aluminium 20 tons 3.1 m (length) x 4.6 m (width) x 2.8 m (height) Large acceptance dipole Cold mass Previous design

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Magnet Cryostat Previous design Large acceptance dipole Overall size : Length4 m Width6 m Height4 m Mass45 t

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Helium tank Linking plate Cooling pipes Cold Mass New design Total weight 22 tons 3.5 m (length) x 4.8 m (width) x 2.5 m (height) Large acceptance dipole

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Helium tank Fixed support Mobile support Cold Mass New design Large acceptance dipole

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Cryostat study Many parts of reinforcements

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Large acceptance dipole Global thickness = 15 mm Magnet Cryostat New design 50 mm 30 mm

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, External vacuum vessel Total strain < 4.5 mm Loads: Cryostat weight Cold mass weight ~ 25 tons Pressure = 0.1 MPa Buckling analysis Large acceptance dipole

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, External vacuum vessel Total strain ~ 1.5 mm Internal vacuum vessel Total strain ~ 1.2 mm max Handling of the whole Magnet Total weight : Cold mass + Cryostat Large acceptance dipole

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, CryostatPrevious designNew designWith satellite Length4 m with exit flange 4.4 m with exit flange Width6 m5.5 m7 m Height4 m3.6 m Mass45 t Large acceptance dipole

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Experimental area (not final) Geb #6a (Betriebsgebäude) Geb #6b (Low-Energy cave) Geb #6 (High-Energy cave) CR/NESR Source GSI-FAIR Janvier 2009

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, To install the magnet in the hall, we need in particular : - Precise location of power lines, control and power cabinets, this should be define now to prepare the order of the power supply. - Precise location of cryogenic lines and feed-box, the same lines could be used for the tests at Saclay. - System of rotation of the magnet on air-pads (~ 50 tons), Bertin company give the advice to install a fixed axis linked to the magnet, coupled with a mirror resin floor. Large acceptance dipole Experimental area

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, R3B-GLAD Control room - Power supply - Magnet Control System Large acceptance dipole This location must be approved permanently - on the right side - Power supply : lines < 50 m - Local MCS < 10 m to the magnet

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Large acceptance dipole Fabrication of the magnet Cold mass (coil winding + coil casings + integration of coils in their casings) : - the thermo-mechanical study is completed at the nominal level of forces - consequences of default values of coil positions have been studied - the cold mass has been ordered in January and is now under construction - The cold mass cooling calculations are underway in 3D, being updated with new parameters. Due to the presence of eddy currents, the time necessary to establish the nominal current (~4000 A) could be longer than expected. Cryostat (Vacuum vessel + thermal screens + satellite + supports) The Cryostat study is under progress, and a PRR review will be organised next month. The interfaces with the hall and the experiments are now defined by some features recently decided : - for ex., the satellite position will be changed and placed on the right side. For this, we have already modify the joints in the cold mass drawings. - The entrance and the exit flanges of the of the vacuum vessel windows are now fixed.

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Schedule Answers to the Cold Mass call for tender are waited this week Large acceptance dipole Station d’essai

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, The R3B-GLAD magnet construction 1) Superconducting cable definition: June ) Reception of the first cable from the manufacture: June ) Complete delivery & test of the cable: April ) Cold mass design study (thermal, magnetic & mechanical): June ) R3B-GLAD set-up interface definition: Quarter 4, ) First coil winding: 2nd quarter ) First integration of the six coils in the cold mass: 1st quarter ) Cold-mass tests in Saclay: 2nd quarter ) Second integration of the complete magnet: end of ) End of full test in Saclay: 3rd quarter ) Installation at GSI/FAIR: end of 2011 Large acceptance dipole

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, As previously decided : - Power lines and power supply. - Cryogenic lines and Feed-box to connect GLAD to FAIR - System of rotation of the magnet on air-pads, and Specific floor - Vacuum pumping system Moreover CEA Irfu is asking for the funding of : - Magnetic measurements, and tests at Saclay, If they are required because of the FAIR delay. Large acceptance dipole R3B Collaboration Funding

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4,

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4,

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4,

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Tests of the delivered SC cable lengths - OK After cold mass complete design, finalisation of cryostat study Engineering design review Call for tender and ordering to the industry of : – the winding & impregnation of the coils, – the coil casing fabrication, – and the integration in the cold boxes Ordering of the cryostat Assembly and local test of the MSS