1 COROT Science Week, Marseille, 3-6 June 2003 COROT mission Agenda ðSystem progress report §Scenario of observations §Satellite engineering Confirmation.

Slides:



Advertisements
Similar presentations
ASTEROSEISMOLOGY and SEARCH for EXOPLANETS Vienna - September 18 th 2001 The mission objectives lead to the following requirements at optics level : MAIN.
Advertisements

Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Israeli Universal Spacecraft Bus Characteristics and Design Trade-Offs
1 SMOS IOCP Key-Point 0 09 Dec ESAC SMOS Commissioning activities In Orbit Commissioning Activities : System Reviews F.Bermudo / CNES.
More Satellite Orbits Introduction to Space Systems and Spacecraft Design Space Systems Design.
LightSail.
Orbital Operations – 2 Rendezvous & Proximity Operations
1 M. Auvergne. Natal October 2004 Instrument performances. Signal perturbations: Radiations. Scattered light. ACS. Temperature. Readout electronic. Calibrations.
07/07/2005 Coupling with PF2012: No existing PF “as is” able to accommodate Karin On going study in France to develop a new generation of PF product line.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
1 COROT Science Week, Paris, May 2002 COROT mission Orbit parameters ðTwo orbit models are used at system level §inertial polar circular orbit §right.
Attitude Estimation Thomas Bak Institute of Electronic Systems
Long Term Science working group status LSWT Venice, 30/03-01/04/2009.
SDW20051 Vincent Lapeyrère LESIA – Observatoire de Paris Calibration of flight model CCDs for CoRoT mission.
Simulating A Satellite CSGC Mission Operations Team Cameron HatcherJames Burkert Brandon BobianAleks Jarosz.
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
Constellation Orion Visible Light Constellation Orion Infrared Light.
TARANIS a CNES Scientific Mission – C. Bastien-Thiry Workshop on Coupling of Thunderstorms and Lightning Discharges to Near-Earth Space – Corte 2008 TARANIS.
“Galileo Galilei” (GG) GG Phase A-2 Study funded by ASI ongoing at TAS-I (TO) with support from GG/GGG scientists GG target: test the Equivalence Principle.
PLAnetary Transits and Oscillations of stars Thierry Appourchaux for the PLATO Consortium
SDW2005, juin, Taormina The Corot Space instrument.
1 COROT: Scientific comity Sept Calibrations during the commissioning and before the first run. Calibrations cover closed Calibrations cover open.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
Launching, Orbital Effects & Satellite Subsystems
Activities proposed for procurement (EGEP-1st Batch ) 1.RIMS V3 Prototype Development 2.Galileo 2G Phase A/B Satellite Studies 3.Electrical Propulsion.
DISTRIBUTION AMONG INDUSTRIES Space industry Power industry Rail transportation Different industries.
1 Formation Flying Shunsuke Hirayama Tsutomu Hasegawa Aziatun Burhan Masao Shimada Tomo Sugano Rachel Winters Matt Whitten Kyle Tholen Matt Mueller Shelby.
Bob G. Beaman June 28, 2001 Electrical Power System SuperNova / Acceleration Probe (SNAP)
Attitude Determination and Control System
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
Attitude Determination and Control System (ADCS)
Natal Workshop October 30th, Project Status.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
Corotweek n°9 - ESTEC December 6th, 2005 COROT PROJECT STATUS 1 COROT PROJECT STATUS Thien LAM TRONG.
PLATO Main Electronics Units (MEU) based on inputs from P. Plasson and the system team J. Miguel Mas-Hesse Centro de Astrobiología (CSIC-INTA)
1 WP4 – System Testbed Trial 2 preparation Barcelona 3/03/05 Marco Bobbio Pallavicini - Carlo Gavazzi Space SpA.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Chapter 1 Predicting the Motions of the Stars, Sun, and Moon.
ASTEROSEISMOLOGY and SEARCH for EXOPLANETS Vienna - September 18 th 2001 Optical performance characterization Point Spread Function (PSF) : Telescope +
1 Leonardo Pinheiro da Silva Corot-Brazil Workshop – October 31, 2004 Corot Instrument Characterization based on in-flight collected data Leonardo Pinheiro.
1 COROT Science Week, Berlin, December 2003 Agenda Corotweeks' progress reports Operational orbit & its environment (I) Mission constraints Reference.
Page 1 ENVISAT Validation Workshop - ESRIN – 9-13-Dec-2002 ENVISAT Spacecraft and Flight Operations Segment Status Andreas Rudolph Mission Operations Department.
1Corot Science Week, Berlin, December 2003 Inside the COROT machine Overview of global loop for COROT operations Description of COROT Subsystems.
GE+ PL INTERFACES, RESSOURCES PLATO PPLC/ESA meeting, Feb 27th 2009.
GIST-24 Meeting December MSG PROGRAMME STATUS Presentation to the GIST-24 meeting.
1 Weekly Summary Weekly Summary Formation Flight AEM4332 Spring Semester March 7,2007 Masao SHIMADA.
PPLC – ESA FEB 27th 2009 CCD thermal specs G Epstein CCD thermal specifications Divers for Telescope thermal architecture.
© ИАЦ КВНО ЦНИИмаш Собственность ИАЦ. All rights reserved GLONASS Status and Progress Sergey Revnivykh CGSIC Meeting , Savannah, GA, US.
1 Transiting Exoplanet Survey Satellite Daryl Swade Archive Team Meeting June 16, 2014.
Corot:Ubatuba Nov The Ground Segment: Data Processing. Software development in laboratories. Brazilian contribution. Michel Auvergne Réza Samadi.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
1 COROT Science Week, Berlin, December 2003 COROT Week 5 Corotweeks' progress reports Operational orbit & its environment (I) Mission constraints.
Characteristics of remote sensing satellites. Satellites generally vary in their architecture Usually remote sensing satellites are having two plateforms.
EXTP Accomodation Study Hong Bin, Zhang Long Institute of Spacecraft System Engineering. CAST Oct 27th, 2015.
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
Eric Weber (1/14)1 Configuration and Structural Design Eric Weber Tasks –Preliminary hardware research –Preliminary transmission research –Materials Research.
Spacecraft Technology Structure
Preliminary Platform Design for KuaFu-A
Summary Single Object & Time Series Spectroscopy Jeff Valenti JWST Mission Scientist Space Telescope Science Institute.
Image Stabilization System (ISS)
SDO Flight Dynamics Subsystem
Fabio de Oliveira Fialho Michel Auvergne
Launch and On-orbit Checkout
Lunar Observation Data for GIRO Landsat–8 Operational Land Imager
CubeSat vs. Science Instrument Complexity
AGENDA 1 - THE INSTRUMENT Architecture of the instrument
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

1 COROT Science Week, Marseille, 3-6 June 2003 COROT mission Agenda ðSystem progress report §Scenario of observations §Satellite engineering Confirmation of the flight domain §System engineering Satellite-to-ground link Telemetry budget §Launch of COROT Picture of SOYUZ in Kourou

2 COROT Science Week, Marseille, 3-6 June 2003 Instrument progress report COROTCASE COROTEL COROTLOG COROTCAM PROTEUS

3 COROT Science Week, Marseille, 3-6 June 2003 System progress report Satellite engineering overview ðMany activities §Spacecraft mathematical model for coupled load analysis with the launcher §SED-16 star tracker accommodation §AOCS specific command & control §Mechanical and electrical interfaces ðAOCS performances §To be estimated after coupled simulation with payload ecartometry §Results available for the next Corotweek (Marseille, spring 2003) ðSpacecraft roll domain §Power budget improved by Li-Ion battery §Beginning of life : simulations show that the ± 20° requirement will be met §End of Life (low electrical efficiency, broken cells) : performance TBC ðLast step of the contract negotiation with Alcatel §Contract to be signed in the first quarter of 2003

4 COROT Science Week, Marseille, 3-6 June 2003 COROT mission Orbit parameters ðThe orbit will not be kept phased after commissioning §risk of sun glare in case of semi-major axis correction maneuver §semi-major axis drift over 5 years : - 7 km (atmospheric drag) §orbit period stability over 6 months : better than 1 s Eclipse Xs+ Thruster along Xs Sun direction

5 COROT Science Week, Marseille, 3-6 June 2003 COROT mission Orientation of the satellite - flight domain Sun

6 COROT Science Week, Marseille, 3-6 June 2003 COROT mission The sky observed by COROT

7 COROT Science Week, Marseille, 3-6 June 2003 COROT mission Satellite design / axes Zs+ Xs+ Ys+ Equipment bay Upper compartment with sensitive equipment Fine thermal regulation subsystem

8 COROT Science Week, Marseille, 3-6 June 2003 COROT mission Platform design ð“PROTEUS Evolution” family §series of 5 platforms §upgraded electrical and AOCS chains ðLi-Ion battery §higher capacity (80 A h) no more problem of power supply in Safe Hold Mode §lower thermal dissipation the battery sidewall can withstand any solar incidence no need to rotate on the boresight axis after 5 months ðNew Magneto Torquer Bars §higher capacity (180 A m 2 ) better convergence of the Safe Hold Mode §equipment driven by a proportional control law no more pointing disturbances due to MTB activations ðOther features : new star trackers (SODERN), 2-antenna GPS

9 COROT Science Week, Marseille, 3-6 June 2003 COROT mission New mission schedule ðThermal constraints shrunk to payload constraints §the Ys+ satellite wall (focal unit radiator) must be in the shade as much as possible ðNo more 180° rotation on Xs between CP and EP ðNo more EP2 critical thermal configuration for payload design ðSeveral possibilities for the scheduling §Exploratory Programs can be carried out either at the beginning or at the end of a 6-month period §an alternate schedule CP1, EP1, CP2, EP2 is operationally recommended ðFocal unit radiator temperature worst cases in 1b and 2b §1b and 2b zones crossed by the Line of Equinoxes §temperature depending on direction of observation and roll angle

10 COROT Science Week, Marseille, 3-6 June 2003 COROT mission Straylight Thermal constraints ðpolar caps ðlightened under small angles ðsee the Corotweek n°3 (Liège) - presentation by Annie Baglin « scattered light from Earth » §the maximum is reached when the satellite flies over the day part of the Earth

11 COROT Science Week, Marseille, 3-6 June 2003 COROT mission Eclipses (over the year) ðmax : 0.34 T orb

12 COROT Science Week, Marseille, 3-6 June 2003 COROT mission Previous schedule “Peace and Love” Line of nodes Summer Winter Autumn Solar declination up to +23° Ys+ Solar declination down to –23° Central Program 2 Exploratory Programs 1 & 2 180° rotation on Zs 180° rotation on Xs 180° rotation on Zs Satellite axes in a fixed orbital reference frame R OF X J2000 Y J2000 X OF Z OF Equatorial plane 12.5° Earth orbit Central Program 1 Line of Equinoxes Spring S Xs+ Zs- Xs+ Zs- Ys+ Xs+ Zs- Ys+ Zs- Xs+ Ys+ Anticenter (6h50)Center (18h50)

13 COROT Science Week, Marseille, 3-6 June 2003 COROT mission Updated schedule “Piece of cake” Line of nodes Summer Winter Autumn Solar declination up to +23° Solar declination down to –23° Central Program 2 Exploratory Programs 1 & 2 180° rotation on Zs Satellite axes in a fixed orbital reference frame R OF X J2000 Y J2000 X OF Z OF Equatorial plane 12.5° Earth orbit Central Program 1 Line of Equinoxes Spring S Xs+ Zs- Ys+ Zs- Xs+ Ys+ 1b 1a2b 2a Center (18h50)Anticenter (6h50)

14 COROT Science Week, Marseille, 3-6 June 2003 COROT mission Line of nodes Summer Autumn Solar declination up to +23° EP 1 180° rotation on Zs Satellite axes in a fixed orbital reference frame R OF X J2000 Y J2000 Equatorial plane 12.5° Earth orbit CP 1 Line of Equinoxes Spring Zs- Xs+ Ys+ 1b 1a 18h50 Favorable direction in the observation cone RA + S

15 COROT Science Week, Marseille, 3-6 June 2003 COROT mission Line of nodes Winter Autumn Solar declination down to –23° CP 2 EP 2 180° rotation on Zs Satellite axes in a fixed orbital reference frame R OF X J2000 Y J2000 Equatorial plane 12.5° Earth orbit Line of Equinoxes Spring Xs+ Zs- Ys+ 2b 2a 6h50 Favorable direction in the observation cone RA + S

16 COROT Science Week, Marseille, 3-6 June 2003 COROT mission Straylight ðmaximum level (on the orbit) as a function of time §case of winter -12° RA +12° RA -12° dec +12° dec

17 COROT Science Week, Marseille, 3-6 June 2003 COROT mission Performance management ðPerformance management consists in choosing the most favorable edge for each observing run §a slight drop in periodic performances (compatible with the requirements) can be tolerated for the EP observing runs §white noise b phot = f(1/  T obs ) in Fourier space  spectrum analysis less sensitive to periodic perturbations (hidden lines) in EP runs  i 2 Ai / (  b phot (T)) 1 / Qi < 100  Hz ðTo define a scenario, the users shall have a series of criteria §direction of observation §roll angle to optimize the projection of the targets onto the CCD §criticity of the thermal regulation (level, variability) function of the roll angle §criticity of the straylight intensity if any

18 COROT Science Week, Marseille, 3-6 June 2003 Spacecraft overview Spacecraft overview (-Z s sidewall ) Antenne patch GPS -X s Antenne patch GPS -Zs ProteusCorotcase Corotel

19 COROT Science Week, Marseille, 3-6 June 2003 Spacecraft overview Spacecraft overview (+Z s sidewall) Corotel Corotcase Proteus

20 COROT Science Week, Marseille, 3-6 June 2003 Spacecraft overview Spacecraft overview (+Z s sidewall)

21 COROT Science Week, Marseille, 3-6 June 2003 Spacecraft overview Ys+ Xs+ Zs+ S RSF cover dec < 0 Sidewall in the shade WINTER - Sun in the back of the satellite

22 COROT Science Week, Marseille, 3-6 June 2003 Spacecraft overview Ys+ Xs+ Zs+ S RSF cover dec < 0 Sidewall lightened if roll < 0 WINTER - First days roll < 0

23 COROT Science Week, Marseille, 3-6 June 2003 Spacecraft overview Ys+ Xs+ Zs+ S RSF cover dec > 0 Sidewall lightened even if roll = 0 increasing flux when roll > 0 WINTER - Last days (round J91) roll > 0

24 COROT Science Week, Marseille, 3-6 June 2003 Spacecraft overview Spacecraft overview (+Z s sidewall)

25 COROT Science Week, Marseille, 3-6 June 2003 Spacecraft overview ðEquipment bay (COROTCASE) §scientific data processing electronics BCC camera control BEX extraction units DPU processor §instrument housekeeping electronics BCV power distribution BS1 analogical payload telemetry BS2 synchronization and thermal regulation ðOn-board software (COROTLOG) §aperture photometry algorithms §angle error measurements for AOCS §satellite-to-ground link : 900 Mbits/jour

26 COROT Science Week, Marseille, 3-6 June 2003 System progress report Spacecraft roll domainwinter Ys+ Zs+ S E CP and EP n°2 Objective : ± 20° angle for optimum power budget :  = arctan (-tan  sin  ) = 5.25° Confirmed for Beginning of Life

27 COROT Science Week, Marseille, 3-6 June 2003 Spacecraft roll domain summer Ys+ Zs+ CP and EP n°1 E S Objective : ± 20° angle for optimum power budget :  = arctan (-tan  sin  ) = 5.25° System progress report Confirmed for Beginning of Life

28 COROT Science Week, Marseille, 3-6 June 2003 System progress report System engineering overview ðSystem engineering activity currently focused on §instrument modes and in-flight operations §all command & control interfaces §ground segment architecture §use of ground stations §system tools for Corotsky §light curve corrections §level 0/1 products CCC PLTM HKTM Network CMC TC TTCET CDC

29 COROT Science Week, Marseille, 3-6 June 2003 System progress report Instrument modes VEILLE SAFE OFF VALIDATION ECARTOMETRIE GROSSIERE VALIDATION ECARTOMETRIE FINE VALIDATION IMAGE EXOPLANETES VALIDATION IMAGE ASTERO VALIDATION PLAN DE MASQUES  OBSERVATION      Phase de Mise en station CALIBRATION PERIODIQUE Modes dédiés aux CALIBRATIONS DEBUT DE VIE

30 COROT Science Week, Marseille, 3-6 June 2003 System progress report Satellite-to-ground link capacity ðStation Acquisition Phase Preparation of an observing run (7 days) §VFA + NTL + KRN for many TC/TM operations §useful scientific telemetry up to 2.2 Gbits / day

31 COROT Science Week, Marseille, 3-6 June 2003 System progress report Satellite-to-ground link capacity ðObservation Phase Observing run (20, 150 days) §VFA + NTL §useful scientific telemetry up to 1.4 Gbits / day

32 COROT Science Week, Marseille, 3-6 June 2003 Satellite-to-ground link capacity ðThe nominal scientific mission is performed with VFA station §Seismology 12 windows by CCD –5 star windows, with 2 mask images (over 32 s) –5 background windows –2 offset windows §Exoplanets 6000 windows by CCD –4 964 chromatic star windows –36 oversampled chromatic star windows –949 monochromatic star windows –42 oversampled monochromatic windows (including offset) –9 imagettes §Total for 2 photometric chains : kbits / day System progress report

33 COROT Science Week, Marseille, 3-6 June 2003 System progress report Satellite-to-ground link capacity ðHow the additional telemetry with NTL station can be used ? §More seismology mask images 1 mask image over 32 s --> 45.6 Mbits / day 1 mask image over 16 s --> 91.6 Mbits / day 1 mask image over 8 s -->182.4 Mbits / day (mask size = 25 x 25) §More exoplanet imagettes 1 imagette over 32 s --> 6.5 Mbits / day ðExamples of scenario §Spreadsheet program §5 seismology mask images (over 32 s) + 25 exoplanet imagettes x 2 §3 seismology mask images (over 16 s) + 15 exoplanet imagettes x 2 §2 seimology mask images (over 8 s) + 20 exoplanet imagettes + 2 seismology mask images (over 32 s) + 20 exoplanet imagettes §Total for 2 photometric chains : < kbits / day

34 COROT Science Week, Marseille, 3-6 June 2003 Project status Launch of COROT in June 2006 ðLaunch of COROT by SOYUZ/ST from the Guiana Space Center §Choice made by CNES headquarters in July 2002 §Maiden flight from Kourou §Contract to be signed with Arianespace before end of 2003, after next ESA Council §Civil engineering in Malmanury River expected before July 2003 §If any inacceptable delay on the launch pad work, back-up by ROCKOT from Plesetsk

35 COROT Science Week, Marseille, 3-6 June 2003 System progress report