Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,

Slides:



Advertisements
Similar presentations
Field measurements of QEA magnets at KEK Mika Masuzawa May 30, 2006.
Advertisements

BROOKHAVEN SCIENCE ASSOCIATES Abstract Vibrating Wire R&D for Magnet Alignment Animesh Jain, NSLS-II Project The alignment tolerance for a string of magnets.
Alexander Temnykh Cornell University, Ithaca NY, USA
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Zack Wolf Quadrupole Fiducialization October 20, A Vibrating Wire System For Quadrupole Fiducialization Zack Wolf,
Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Wire Position System The Undulator.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Stability of Mechanical Systems S. Sharma and V. Ravindranath.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Mechanical Engineering Issues Sushil Sharma, NSLS-II Project The NSLS-II storage ring requires multipoles and.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
19 Nov 08,ILC08Cherrill Spencer Rotating Coil System Description 1 Short description of the SLAC rotating coil system used to measure the CIEMAT-made prototype.
1 ATF2 project: Investigation on the honeycomb table vibrations Benoit BOLZON 33rd ATF2 meeting, 24th January 2007 Laboratories in Annecy working on Vibration.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
Alignment and Beam Stability
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.
1 LHC IR Quadrupole Alignment Experience at Fermilab T. Beale, J. DiMarco, J. Nogiec, P. Schlabach, C. Sylvester, J. Tompkins, G. Velev 28 September 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES S.Sharma 10/11/2006 NSLS-II Mechanical Subsystems Accelerator Systems Advisory Committee Review October 10-11, 2006 Sushil.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
1 BROOKHAVEN SCIENCE ASSOCIATES S. Sharma ASAC July 17-18, 2008 Support System and Alignment Sushil Sharma ME Group Leader ASAC Review of NSLS-II July.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
Barrel Calorimeter Support Mechanism Two designs are proposed for review –Design1. Individual module (Segment) of the Barrel Calorimeter is placed inside.
1 BROOKHAVEN SCIENCE ASSOCIATES Issues on Closed Orbit Feedback for NSLSII NSLS-II Stability Workshop April 18-20, 2007 Li-Hua Yu.
1 BROOKHAVEN SCIENCE ASSOCIATES Stability Issues NSLS-II PAC Meeting May 24, 2007 S. Krinsky.
Engineering Division 1 M321/M331 Mirror Switchyard Design Review Tom Miller
LASER FRAME: Straightness monitor (Tentative results of resolution test) Third Mini-Workshop on Nano Project at ATF May 30-31,2005 KEK Nano BPM Group Y.Higashi,
1 ATF2 Project Meeting December 2006 Ground Stabilisation with the CERN STACIS 2000 Stable Active Control Isolation System LAViSta Laboratories in.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
CLIC module Experimental program for module array Module review, June 22 nd 2015Elena Daskalaki, BE-RF-MK.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
F James T Volk Arpil Permanent Magnets for Linear Colliders James T Volk Fermilab.
1 BROOKHAVEN SCIENCE ASSOCIATES 12th International Workshop on Accelerator Alignment September 10-14, 2012 Fermilab, Batavia, Illinois, U.S.A NSLS-II Girder.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
1 BROOKHAVEN SCIENCE ASSOCIATES Stability Issues NSLS-II ASAC Meeting April 23, 2007 S. Krinsky.
WU Lei,WANG Xiaolong, LI Chunhua, QU Huamin Mechanical Group, Accelerator Division Institute of High Energy Physics 13 th International Workshops on Accelerator.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
Super-B Vibration Tolerances
TEST MODULE WG Cradles for CLIC module supporting system
Workshop on Tau-Charm at High Luminosity
Experimental program for module array
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
LCLS Undulator System Status and Schedule
LCLS Undulator System Status and Schedule
Beam Finder Wire (BFW) Status
Fixed Support Design & Testing
Alignment Diagnostic System Status
Presentation transcript:

Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico, C. Longo, R. Meier Magnet Division: G. Ganetis, A. Jain, P. He, P. Kovach Cornell: A. Temnykh APS: H. Friedsam

Outline:  Alignment Technique and R&D  Reference Designs of the Magnets  Mechanical Stability of the Multipole Girders  Summary and Conclusions Multipole Girder with Stretched Wire

Magnet Alignment Technique Magnet alignment will be done with a vibrating wire alignment technique developed at the Cornell University by Prof. Alexander Temnykh. Alignment tolerances: Magnets: 30 μm, 0.2 mrad Girders: 100 μm, 0.5 mrad

Magnet Alignment Procedure  Accepted magnets and vacuum components shall be assembled (roughly aligned) on to the girder in an assembly station.  The girder assembly will be moved and installed into the temperature- controlled (± 0.1 ºC) alignment facility.  The girder will be aligned using a laser tracker. All electrical and water connections will be made to the magnets.  Magnet movers are installed beneath each magnet.  Magnet coils will be brought to their operating temperatures.

 A clean wire will be inserted through the vacuum chamber.  The wire will be secured to wire movers located at either end of the girder assembly and a controlled constant tension will be applied.  A Laser tracker will used to locate the two ends of the wire at the correct height relative to survey targets on the girder to within +/- 100 microns. Magnet Alignment Procedure – contd.

 The magnets and the stretched wire shall be systematically powered.  Resultant wire vibration shall be monitored and analyzed.  The wire height can be adjusted vertically by the wire mover to correct for wire sag at each magnet location along the girder and can be reproducible to +/- 1 micron.  The magnet movers shall be used to locate the magnetic center of each quadrupole and sextupole to the wire to <25 microns Magnetic Alignment Procedure – contd.

Vibrating Wire Technique - R&D Wire Mover Magnet Mover Experimental Setup (Magnet Division)  Magnets will be setup will be on an existing 15 ft. granite surface plate.  The wire movers will be mounted on two small separate granite surface plates on either side of the magnet setup.  The wire movers will be 22 ft. apart.  SLS magnets are on site. Design work to mount them on magnet positioners will begin soon.

Vibrating Wire Alignment R&D Wire Mover Targets Insulated V-notch Wire Mirror Camera Lens Small Dovetail Stages Wire Finder Photo Interrupters  Detailed design of major components are well under way.  Wire movers, magnet positioners and 3 Motorized X/Y Stages on order.  One set of 4 indicators with 1 um resolution is available.  Cornell data acquisition system has been duplicated.

weight pulley X-Y Stage Digital indicator RHIC spare Quadrupole Other end of wire on a table ~6m away Fixed end of wire Photo Detectors Digital indicator Lasers Vibrating Wire Alignment R&D – contd.

Girder Alignment Approach: (1) Use precise alignment mechanisms that are removable. (2) Simple hardware to lock the components in place   stiff system with high natural frequencies.  lower and predictable thermal deformations.

Storage Ring Multipole Magnets Magnet designs must be robust. Field quality (harmonic contents) should remain within specified tolerances after repeated disassembly and reassembly. Several different designs (SPEAR, SLS, APS) are being evaluated. A 2-segment sextupole design is being developed. Quadrupole Magnet

Storage Ring Multipole Magnets A 2-segment sextupole design is being developed. Sextupole Magnet

Tolerance LimitsΔX RMS QuadsΔY RMS Quads Random magnet motion< 0.15 μm< μm Random girder motion<0.6 μm< 0.07 μm Tolerances on Magnets’ Motion  Thermal: relative thermal displacement between magnets on the same girder: < μm.  Vibration: no magnification of ambient floor motion up to 50 Hz. Below 4 Hz girder motions are highly correlated Above 50 Hz the rms floor motion is < μm Mechanical Stability of the Multipole Girders

Thermal Deformations Magnets: Relative displacement on a girder: 0.01 μm Vacuum Chamber: Near fixed and flexible supports (SS plates): ~0.3 μm Chamber deformations near the supports are ~ 0.17 μm with Invar plates. BPMs need to be located near the fixed or flexible supports.

Displacement PSDs at locations near the NSLS-II site (Source: N. Simos) RMS Displacements at CFN ( 0.5-4) Hz : 200 nm (4-50) Hz : 20 nm (50-100) Hz : 0.4 nm Ambient Floor Motion

Natural modes of vibration for the girder-magnets assembly: (a) rolling mode = 63 Hz, (b) twisting mode = 79 Hz RMS (2-50) Hz Displacements: Floor: 20 nm Magnets: 21 nm (b) (a) Mode Shapes of the Girder-Magnets Assembly

Summary and Conclusions  The magnets on the girder will be aligned with a vibrating wire technique.  Girders will be aligned with precise but removable alignment mechanisms.  Reference designs for the SR magnets are being developed that are consistent with the vibrating wire alignment technique.  The multipole magnets-girder assembly (with removable alignment mechanism) will meet the stability specifications.