1 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste The X-band technology for FELs (XbFEL) Project G. D’Auria (Elettra.

Slides:



Advertisements
Similar presentations
FEL and linac plans at MAX IV laboratory
Advertisements

Tessa Charles Australian Synchrotron / Monash University 1 Bunch Compression Schemes for X-band FELs.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Thomson Scattering X-ray Source at Tsinghua University
The BESSY Soft X-Ray SASE FEL (Free Electron Laser)
1 CLIC Workshop 2015, 26 – 30 January 2015 Gerardo D’Auria_Elettra-Sincrotrone Trieste The XbFEL Project (X-band technology for FELs) G. D’Auria (Elettra.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
AS Diagnostic Collaboration Mark Boland
New Electron Beam Test Facility EBTF at Daresbury Laboratory B.L. Militsyn on behalf of the ASTeC team Accelerator Science and Technology Centre Science.
Low Emittance RF Gun Developments for PAL-XFEL
Free Electron Lasers (I)
F Project X Overview Dave McGinnis October 12, 2007.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
W.S. Graves ASAC Review Sept 18-19, 2003 R&D at Bates William S. Graves MIT-Bates Laboratory Presentation to MIT X-ray laser Accelerator Science Advisory.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
CLIC and High Gradient FEL Design D. Schulte for the CLIC collaboration and FEL friends D. Schulte, LSUM, Ankara, October
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
External Seeding Approaches: S2E studies for LCLS-II Gregg Penn, LBNL CBP Erik Hemsing, SLAC August 7, 2014.
1 GdA_CLIC meeting  Research & Innovation Action  INFRADEV : Design studies INFRADEV : Design studies Project: “X-band technology.
Which Logo? FELs with X-Band Technology D. Schulte for the X-band FEL and CLIC collaboration D. Schulte, CERN, September
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
Optimisation of single bunch linacs for possible FEL upgrades Alexej Grudiev, CERN 6/02/2014 CLIC14 workshop.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
WP8-HGA High Gradient Acceleration M. Biagini (INFN-LNF) WP8 coordinator Tiara Kickoff Meeting, CERN, Feb , 2011.
CLIC developments Xband FEL linac introduction W. Wuensch Xband technology.
Interface between TAC SR and SASE FEL Possibility for testing CLIC structure Avni AKSOY Ankara University.
Summary of XFEL uses for CALIFES Erik Adli (University of Oslo, Norway)
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
, Summary of Working Group 1 Linear Colliders and Light Sources C. Christou, M. Dehler.
X-band Based FEL proposal
E. Schneidmiller and M. Yurkov FEL Seminar, DESY April 26, 2016 Reverse undulator tapering for polarization control at X-ray FELs.
ELI PHOTOINJECTOR PARAMETERS: PRELIMINARY ANALYSIS AND SIMULATIONS C. RONSIVALLE.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Overview Turkish Projects TAC / TARLA Avni Aksoy Ankara University Institute of Accelerator Technologies.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
CALIFES A proposed electron beam test facility at CERN
CompactLight H2020 Design Study Proposal
CompactLight: H2020 Design Study Proposal +Feedback from TIARA
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
Beam dynamics for an X-band LINAC driving a 1 keV FEL
Abstract EuSPARC and EuPRAXIA projects
Sara Thorin, MAX IV Laboratory
Input to Strategy currently planned
An X-band system for phase space linearisation on CLARA
Status and Interest of the X-ray FEL SINAP
CompactLight H2020 Design Study Proposal
Status of the CLIC main beam injectors
Optimisation of single bunch linac for FERMI upgrade
X-band FEL beam dynamics issues
Accelerator Research and Innovation for European Science and Society
Collaboration New collaborators in 2016:
Kick-Off preparatory meeting
Gu Qiang For the project team
Paul Scherrer Institut
for the X-band FEL Collaboration
CLIC Klystron based. Updates 2017.
Measurements, ideas, curiosities
CompactLight WP6 – Kick-Off Meeting
Olivier Napoly, coordinator CEA/Irfu
Advanced Research Electron Accelerator Laboratory
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Status of DESY-PSI-CERN collaboration on development of X-band TDS with variable polarisation: PolariX-TDS Alexej Grudiev on behalf of Polarix-TDS collaboration.
Presentation transcript:

1 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste The X-band technology for FELs (XbFEL) Project G. D’Auria (Elettra – Sincrotrone Trieste) On behalf of the XbFEL collaboration

2 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste Outline  The X-band technology for FELs (XbFEL) project The XbFEL Collaboration Motivations for using X-band Objectives Concept and approach Work packages descriptions RF module and tests  The FERMI FEL project in Trieste FERMI linac upgrading  Outlook and conclusions

3 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste The “X-band technology for FELs (XbFEL)” is a project recently submitted for funding to H ORIZON Work Programme 2014 – 2015 Research & Innovation Action (RIA) INFRADEV Design Studies ………………………………… The specific challenge and the aim of this activity are to support the conceptual and technical design and preparatory actions for new research infrastructures, which are of a clear European dimension and interest. Major upgrades of existing infrastructures may also be considered if the end result is intended to be equivalent to, or capable of replacing, an existing infrastructure. X-band technology for FELs (XbFEL)

4 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste STElettra - Sincrotrone Trieste, Italy. CERNCERN Geneva, Switzerland. JUJagiellonian University, Krakow, Poland. STFCDaresbury Laboratory Cockcroft Institute, Daresbury, UK SINAPShangai Institute of Applied Physics, Shanghai, China. VDL VDL ETG T&D B.V., Eindhoven, Netherlands. OSLOUniversity of Oslo, Norway. IASANational Technical University of Athens, Greece. UUUppsala University, Uppsala, Sweden. ASLSAustralian Synchrotron, Clayton, Australia. UA-IATInstitute of Accelerator Technologies, Ankara, Turkey. ULANC Lancaster University, Lancaster, UK. XbFEL is a collaboration among several laboratories aimed at promoting the development of X-band technology for FEL based photon sources. XbFEL Collaboration

5 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste Motivation:  Increasing interest by the Scientific Community for very compact Normal Conducting Linacs for FELs (i.e. ~6 GeV, ~150m, for 1 Å wavelength). “Support for feasibility studies of new research infrastructures (i.e. Ankara University, Australian Synchrotron,….), or major upgrade of existing ones (i.e. FERMI FEL,….)”. Advantages:  Compactness, efficiency, possibility to go high repetition rate (kHz regime), costs reduction. Motivations for using X-band

6 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste With the XbFEL project we intend to validate the use of the X-band technology for the construction of the future FEL based photon sources. The objective is to design, assembly and test an X-band accelerating module that can be used as a baseline element for new or upgraded FEL photon facilities, supporting and strengthening the growing requests from the user community. XbFEL objectives

7 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste The X-band accelerator technology, has recently demonstrated acceleration of electron beams at gradients of more than 100 MV/m (CLIC collaboration). To reach the XbFEL objective, three different FELs facilities will be considered: 1. a green field hard X-ray FEL; 2. a green field soft X-ray FEL; 3. an upgrade of an existing FEL. The project will be carried out in close collaboration with industry, member of the consortium, for the technology development and dissemination of the results. XbFEL_Concept and approach

8 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste a.Develop CDRs for the three different scenarios already mentioned in order to fully understand the requirements for the linacs and identify common, standard specifications. b.Design a common RF unit for the linacs. c.Develop and test prototypes of the key components of this common solution. d.Analyze and develop plans for the integration of the X-band technology for new Research Infrastructures at European level and Worldwide. e.Promote the capability of industry to provide such components. XbFEL Specific goals

9 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste XBFEL Work Packages_I WP1:Project management and Technical Coordination It will be focused on management and coordination of all the WPs and deliverables, budget and implementation plans. WP2:FEL Science Requirements and Facility Design Starting from the FEL specifications provided by users (i.e. wavelength range, energy per pulse, pulse duration, structure, etc.), this WP will develop the accelerator requirements and the major hardware choices, based on the X-band technology, for the three different scenarios: a hard X-ray FEL facility, a soft X-ray FEL facility and the upgrade of an existing facility, FERMI. WP3:Linac Standard Solutions and Hardware Specifications The objective of WP3 is to elaborate the overall facility designs, developed in WP2, and produce detailed hardware specifications for the corresponding linacs.

10 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste WP4:Component Validation and Test Programme The specifications and relevant mechanical drawings developed in WP3 will be used for component fabrication, RF module assembly, high power tests and system validation. The objective of WP4 is to demonstrate the manufacturability and operation of one RF unit, representative of an X- band FEL. WP5:Global integration of X-band technology for new Research Infrastr. This WP will focus on gathering the user demands on FELs and accelerator upgrades in the near and mid-term future, services to be provided and will make preliminary estimation of construction/operation costs. WP6:Relation with industry It will cover the collaboration with industry and will be focused on dissemination of results, spreading of information, industry outreach and technology development. XBFEL Work Packages_II

11 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste  FERMI FEL Elettra – Sincrotrone Trieste Linac energy increase → FEL shorter wavelenghts (≤ 1 nm) Possibility to operate with two pulses  Ankara University (Turkish X-ray FEL) 6 GeV linac → FEL wavelengths nm Possibility to operate at high rep rate (up to 500 Hz)  Australian Synchrotron (AXXS–Australian X-band X-ray Source) Plans for a 6 GeV linac  SINAP Shangai Proposal for hard X-FEL (6.5GeV) submitted to Chinese government.  Jagiellonian University_Polish Synchrotron Light Source SOLARIS Solaris linac energy increase 600 MeV → 1.5 GeV, allowing full energy injection without any additional costly civil engineering. Long-term development of a compact VUV - Soft X-ray HGHG.  STFC CLARA FEL Test Facility (Ultra short pulse generation). An S-band linac module (Linac 4) will be replaced with an X-band module as test bed for this technology on FELs. Interest in the XbFEL project_I

12 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste  CERN CERN has no direct interest in Synchrotron Light Sources and FELs, but the activities on XbFEL will also have strong return value for the CERN CLIC project: accelerator and RF components optimization further technical developments with industry costs reduction………  A long-term interest in the technology also exists for University of Oslo University of Uppsala National Technical University of Athens Lancaster University  Industry (VDL) for technology development. Interest in the XbFEL project_II

13 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste RF phase advance 2π/33π/4 a/lambda0.145 d/h Pt401 MW Ls1 m # klystrons10 # structures10 x 4 = 40 a3.62 mm d1.09 mm0.937 mm vg/c3.75 %3.29% tp90 ns102 ns Qe Constant Impedance Accelerating Structure with input power coupler only A. Grudiev, HG2013 workshop X-band module layout P C RF load Klystron Pulse compressor Hybrid HV Modulator

14 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste 430 kV modulator 50 MW Klystron RF Pulse compressor LLRF Vacuum controller s I.Syratchev_CERN CERN X-band test station_XBOX#2

15 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste XbFEL Time schedule

16 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste FERMI FEL FEL-1 FEL-2 FERMI is a fourth generation light source user facility in operation at the ELETTRA-ST laboratory producing photons in the ultraviolet and soft X-ray regions. In the current configuration, FERMI is a seeded Free Electron Laser, based on a normal conducting S-band linac (3 GHz) operated up to 1.5 GeV, with two different FEL lines: a.FEL-1, based on a single stage High Gain Harmonic Generation (HGHG), with a UV Seeding Laser, that covers the spectral range nm. b.FEL-2 based on a two stages HGHG scheme, with the “fresh bunch technique”, that covers the wavelength range 10-4 nm.

17 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste FEL scaling laws ε n = 0.5  rad ε n = 1.5  rad Und = 35 mm, K=1 Und = 20 mm, K=1 Und = 10 mm, K=1 Resonance condition Emittance condition ε n /  ≤ L / 4  * FEL * An extension of FERMI capabilities in terms of wavelength (i.e. down to 1 nm or lower), is very attractive for the all the Users Community. ε n = 1.0  rad

18 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste To reach the above mentioned wavelength region, it is necessary to bring the electron beam energy up to 3 GeV or more. Considering the limited space available in the present machine tunnel, this would require the use of very high gradient structures. The main idea is to install an X-band linac segment, in parallel with the existing linac, downstream the second bunch compressor, using the bunch already compressed. This layout could be implemented with a modular approach, leaving unchanged the present linac, minimizing costs, impact and interference with the existing plants. In addition the scheme would provide two electron beams, with different energies, at linac output. FERMI linac energy upgrading

19 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste FERMI current layout and performance: E beam up to 1.5 GeV FEL-1 at nm and FEL-2 at 10-4 nm Seeded schemes Long e-beam pulse (up to 700 fs), with “fresh bunch technique” for FEL-2 ~ 50 m available 40 m (80%) available for acceleration FEL-1 & FEL-2 beamlines Beam input energy ≥ 750 MeV X-band energy upgrade Space available for acceleration 40 m Accelerating GHz 70 MV/m X-band linac energy gain 2.8 GeV Injection energy.75 GeV Linac output energy3.5 GeV Present layout and proposed energy upgrade X-band linac extension e-beam for a new FEL beamline ≤ 1 nm Operation: short bunch (< 100 fs) low charge (< 100pC)

20 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste FERMI Linac upgrade Normalized RMS projected emittance at the entrance of BC2 (left) and linac exit, as function of the linac-to-beam RMS misalignment and the horizontal betatron function in the BC1 (left) and BC2. The left plot assumes an initial emittance of 0.15  m, the right 0.5  m. Expected FEL performance S. Di Mitri Elettra-ST

21 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste Longitudinal phase space (top) and current profile (bottom) at the exit of BC1 (left) and linac end. The RMS energy spread is, respectively, 1.8% and 0.05%. 6 GeV Linac layout New hard X-ray FEL source

22 LCWS14 Belgrade, Serbia, 06 – 10 October 2014 Gerardo D’Auria_Elettra-Sincrotrone Trieste  The XbFEL project strongly promote the use of the X-band technology for the future FEL based photon sources.  This would allow the construction of these facilities with a technological solution that is more efficient in terms of costs, space and power than the conventional ones.  If approved, the XbFEL grant agreements with EC should be signed in May-June 2015, with an expected starting date at July-2015 and a duration of three years. Outlook and conclusions !!!!!!!