Workshop on Machine Protection, focusing on Linear Accelerator complexes Summary of Fifth Session – Operational Aspects 1)RF Breakdown recovery 2)CLIC.

Slides:



Advertisements
Similar presentations
On the way to an effective regulatory framework of pipeline safety The WP-6 sectoral initiative on pipeline safety Prepared by Sergey Mokrousov.
Advertisements

André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Overview of IS Controls, Auditing, and Security Fall 2005.
Manchester University and the Cockcroft Institute Roger Barlow Technologies manchester.ac.uk Accelerators for ADSRs An account of the requirements.
4.1.5 System Management Background What is in System Management Resource control and scheduling Booting, reconfiguration, defining limits for resource.
K. Potter RADWG & RADMON Workshop 1 Dec WELCOME TO THE 4th RADWG & RADMON WORKSHOP 1 December 2004.
Documentation Testing
1 CSSE 377 – Intro to Availability & Reliability Part 2 Steve Chenoweth Tuesday, 9/13/11 Week 2, Day 2 Right – Pictorial view of how to achieve high availability.
1 Software Testing and Quality Assurance Lecture 38 – Software Quality Assurance.
1 Software Testing and Quality Assurance Lecture 37 – Software Quality Assurance.
Working Group 1: Microwave Acceleration Summary 10 July 2009.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Notion of a Project Notes from OOSE Slides - modified.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Stoimen Stoimenov QA Engineer QA Engineer SitefinityLeads,SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
Breakout Group 2: Software Quality Assurance Outcome 8/18/10 1.
Systems Engineering Approach to MPS Risk Management Kelly Mahoney Presented at the Workshop for Machine Protection in Linear Accelerators.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
Power Extraction Research Using a Full Fusion Nuclear Environment G. L. Yoder, Jr. Y. K. M. Peng Oak Ridge National Laboratory Oak Ridge, TN Presentation.
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS RISK ASSESSMENT Prepared by: Miss Hairul Nazirah Abdul Halim.
Nuclear Power as a High Risk System And the Accident at Three Mile Island Discussing Perrow Chapters 1 and 2 Presented by Gus Scheidt Friday the Thirteenth.
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety Believe it or.
Nuclear Power in the 21 st Century Crystal Ball or Rearview Mirror? David Lochbaum Director, Nuclear Safety Project March 26, 2008.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
1v1 Availability Tracking as a Means to Increase LHC Physics Production B. Todd 1, A. Apollonio 1 and L. Ponce 1 1 CERN – European Organisation for Nuclear.
Object-Oriented Software Engineering Practical Software Development using UML and Java Chapter 1: Software and Software Engineering.
Extreme/Agile Programming Prabhaker Mateti. ACK These slides are collected from many authors along with a few of mine. Many thanks to all these authors.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
Object-Oriented Software Engineering Practical Software Development using UML and Java Chapter 1: Software and Software Engineering.
Electrical Fire in Terminal Room at Collider-Accelerator Department Relay-Fire Investigation Committee
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Probabilistic Safety Analysis Technology (PSA) TACIS R3.1/91.
Luminosity expectations for the first years of CLIC operation CTC MJ.
PLC Workshop at ITER, 4-5 th of December 2014 A. Nordt, ESS, Lund/Sweden.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 21 Slide 1 Software evolution 1.
IT Controls Global Technology Auditing Guide 1.
Machine Protection at the 1MW CEBAF Electron Accelerator and Free Electron Laser Facility Kelly Mahoney Presented at the Workshop for.
OECD Nuclear Energy Agency (NEA): A Forum for sharing experience Mr. Luis E. Echávarri Director General NEA/IAEA/WANO, Cologne, May 2006.
University of Virginia Department of Computer Science Complex Systems and System Accidents presented by: Joel Winstead.
Legal challenges in reviewing application for final disposal of spent fuel Tomas Löfgren.
NERC Lessons Learned Summary LLs Published in September 2015.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
PETS TESTING ANALYSIS 4 th X-band Structure Collaboration Meeting 3 rd May 2010 Alessandro Cappelletti for CLIC collaboration.
Software Quality Assurance and Testing Fazal Rehman Shamil.
2010 Accelerator Safety Workshop August 18, 2010 Lessons Learned Breakout A. Ackerman.
John Carwardine, Ewan Paterson, Marc Ross 14/15 July 2009 Availability Task Force: Subgroup #2.
Eric Prebys/LARP 2/17/2016.  CERN has taken unprecedented steps to control information about this event, including altering the electronic LHC log to.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
CLIC Interlock System study: from Principle to Prototyping Patrice Nouvel TE-MPE-EP TE-MPE Technical Meeting : 22/03/2012.
Report on the Western Cape outages for the period November 2005 to February 2006.
LHC’s Modular Machine ITER – Machine ProtectionB. ToddJuly 2010 Thanks to : TE/MPE/MI, CERN Machine Protection Panel, et al 1v0 Protection System.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Using existing lifts in existing buildings to evacuate disabled persons Derek Smith Technical Director UK Lift and Escalator Industry Association.
Failure Modes, Effects and Criticality Analysis
Tailoring the ESS Reliability and Availability needs to satisfy the users Enric Bargalló WAO October 27, 2014.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
Safety in the Context of OSHA and DOE Expectations Betsy Dunn Manager, Worker Safety and Health April 23, 2015.
ADS reliability requirements
The European Strategy for Particle Physics
ATTRACT TWD Symposium, Barcelona, Spain, 1st July 2016
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
The Fermi National Accelerator Laboratory is a U. S
Failure Mode and Effect Analysis
Normal Accidents: Living with High-Risk Technologies Charles Perrow
Charge and Agenda of the 18th TAC meeting
DOE Review of the LCLS Project 7-9 February 2006
Presentation transcript:

Workshop on Machine Protection, focusing on Linear Accelerator complexes Summary of Fifth Session – Operational Aspects 1)RF Breakdown recovery 2)CLIC (LC) intensity ramping 3)AvailSim 4)BIS Reliability 5)Linac-4 Risk Assessment 6)Systems Engineering Approach MPS CERN Marc Ross, SLAC 1

Machine Protection in Linacs High Power linacs are planned or under construction Many – but not all – of the LHC MPS lessons can be directly applied –(All LHC experience is interesting and useful) Achievable performance will depend on implementation strategy and details 1.RF Breakdown ‘kicks’  Basic physical effect 2.Thermal stabilization  Technical systems effect 3.System modeling  Machine design 4.BIS reliability  real-life experience 5.Risk tabulation and evaluation  Criteria (specification) development 6.Systems Approach  Quality Assurance MPS CERN Marc Ross, SLAC 2

Machine Protection in Linacs (2) What should be the performance goal? –(Different issues than with LHC) What are the key questions? –Safety Culture –Sub-system boundaries –Understanding particular failures and rates and comparing to models  ‘benchmarking’ –Remaining risks Example: ‘Accelerator Driven Systems’ (ADS)  MPS CERN Marc Ross, SLAC 3

Linac Operation (ADS): MPS CERN Marc Ross, SLAC 4 “I was the chairman of the committee that recommended to the DOE that the Accelerator Driven Systems (ADS) approach to dealing with the long-lived component of spent nuclear fuel be terminated. It was, indeed, an accelerator issue but not the one implied in your article ("Taking the Heat out of Nuclear Waste," February 2012). Superconducting systems were already in use and everyone believed that they could be scaled up to the many-megawatt beam level required for ADS to work. At Los Alamos, the most difficult part, the low-energy front end, had been built and tested. The issue was reliability.” ---"Taking the Heat out of Nuclear Waste,"

Linac Operation (ADS 2) “There are still important safety issues. One of them is related to the frequency of accelerator trips. Frequent starting and stopping of a reactor, even a subcritical facility driven by an accelerator, stress the reactor. The standard fission reactors we use today trip very infrequently and each is investigated to find out why before permission to restart is given. I know of no analysis of allowable trip frequency versus down time that would be acceptable. There are a few early versions, but none has been through the kind of hardnosed peer review that our regulators would require. Clearly an outage of one second does not change temperature much and would not be a problem. Outages of minutes would begin to be.” Burton Richter, former SLAC Director, in letter to ‘Symmetry’, March 2012 (coloring mine) Marc Ross, SLAC 5

“Complex systems” What is a complex system? is Linear Collider MPS complex? –(probably yes) If yes, can it be made simpler? See references on reliability performance of complex systems: –e.g. “Normal Accidents: Living with high risk technology”, Charles Perrow, 1984 MPS CERN Marc Ross, SLAC 6

Relevant? Normal Accidents analyzes the social side of technological risk. Charles Perrow argues that the conventional engineering approach to ensuring safety--building in more warnings and safeguards--fails because systems complexity makes failures inevitable. He asserts that typical precautions, by adding to complexity, may help create new categories of accidents. (At Chernobyl, tests of a new safety system helped produce the meltdown and subsequent fire.) By recognizing two dimensions of risk--complex versus linear interactions, and tight versus loose coupling-- this book provides a powerful framework for analyzing risks and the organizations that insist we run them. MPS CERN Marc Ross, SLAC 7

CERN Linear Accelerator Machine Protection Workshop 2012 Lose availability with multiple failures (Murphy’s Law) Difficult to diagnose but Easy to fix 1. Software configured to read these power supplies 2. But the failure related to these power supplies 3. which were connected to the same 220V reglette! e.g. installation incorrect AND Software not correctly configured AND Something trivial failed = Hours to understand trivial event… 4. Loss of availability…