RCWG Update to WMS April 9, 2014. VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section 5.6.4. regarding Cancellation.

Slides:



Advertisements
Similar presentations
Automation and Improvements to Default Uplift Methodology (summary/white paper of a draft NPRR)
Advertisements

1 Appeal to ERCOT Board Regarding Use of Fuel Oil Index Price (FOIP) Larry Gurley TXU Wholesale June 19, 2007.
RCWG Update to WMS July 8, VCMRR008 - Alignment with NPRR700, Utilizing Actual Fuel Cost in Startup Offer Caps NPRR700 approved at May 2015 WMS.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
Real Time Mitigation During Exceptional Fuel Cost Events.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
NPRR 511 and QSGR MOC ERCOT Settlements Meeting Title: WMS Date: March 13, 2013.
1 How does ERCOT Review, Verify and Approve RMR Costs? (In response to questions that were asked during PRR 632 discussions) Prepared for the
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
Guidelines for Verification of Resource Specific Fuel Adders RCWG Paul Vinson.
January 14, New logic and invoices used in January 2015 when closing out December 2014 New Bill Determinants: CRRBAFA- CRR Balancing Account Fund.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
Mitigated Offer Cap Presented to: NATF Date: September 29, 2009 By: Mark Patterson, Manager Market Operations Support (ERCOT) 1September 29 NATF Meeting.
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
RCWG Update to WMS July 10, General Update Agenda Items for Today: Fuel Adder NPRR 485-(no vote) Variable O&M for Technology Types (vote) Seasonal.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process TPTF Meeting Nov 28, 2007 Ino Gonzalez.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee August 7, 2008.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
STANDARD & GENERIC COSTS FOR WOOD FIRED BIOMASS PLANTS H.BASARAN/B.CHAKKA AUSTIN ENERGY RCWG MEETING SEPTEMBER 21,
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
Photovoltaic and Storage Integration Workshop “Operational Issues” Kenneth Ragsdale October 15, 2012 ERCOT.
Market Credit Working Group update to the Wholesale Market Subcommittee 04/06/
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
Resource Cost Working Group October 7, 2015 WMS Update.
Resource Cost Working Group December 2, 2015 WMS Update.
Unit-Specific Bid Limits based on Modified Generic Cost.
QMWG Update to WMS S. Looney December 3, Assignments from WMS ERCOT Market Operations Report – Two SASMs in October, no AS insufficiency – Two unique.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
CMWG Update to WMS Report of CMWG Meetings of &
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
9/17/2012 CSWG CSWG – ERCOT Update ERCOT. 2 Settlements Project & Operational Updates February 27, 2012 NPRR 347: Combined Daily Invoice –Still on track.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
TPTF Verifiable Cost Sub-group Summary Final Report 3/xx/2008 Jim Galvin- TPTF VC Sub-group Chair.
TPTF Verifiable Cost Sub-group Summary Report to TPTF 1/21/2008 Jim Galvin- TPTF VC Sub-group Chair.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
1 WMS Report TO TAC April 2007 (which is in March)
Market Credit Working Group update to the Wholesale Market Subcommittee 03/04/
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
Utilization of Fuel Costs in Ercot Markets Ino González RCWG Meeting 2/24/2016.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Real Time Voltage Support Settlements Business Requirements.
May 28, 2015 and June 30, 2015 Information Session TAC Meeting Update to COPS Michelle Trenary, July 15, 2015.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
2017 Seasonal Adjustment Factors
Exceptional Fuel Costs in LMP
Resource Cost Working Group
Verifiable Cost Working Group (VCWG) Update
General Overview Of Resource Costs
Resource Cost Working Group
NPRR 816 / Vendor Index Definitions
Presentation transcript:

RCWG Update to WMS April 9, 2014

VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation of a RUC Commitment states: (3) The process for determining the verifiable actual costs for a RUC cancellation must be developed by ERCOT, approved by the appropriate TAC subcommittee, and posted to the MIS Secure Area within one Business Day after initial approval and after each approved change. The purpose of the proposed VCMRR is to document ERCOT’s process for calculating payments for RUC- Committed Resources that have received a RUC Cancellation, as required above. Vote?

Real-Time Mitigation during Exceptional Fuel Cost Events Some Resources were mitigated in real-time to below their actual cost due to large differences between FIP and the actual spot gas price during February and March 2014 – The actual spot price on certain days was significantly different than the previous day price used for FIP – West Texas spot gas prices were much higher than the Houston Ship Channel price used for FIP

Real-Time Mitigation during Exceptional Fuel Cost Events Discussed Possible Solutions – Settlement dispute process Concerns with uplift and who pays Limit to exceptional events and infrequent use – Changes to FIP Higher of HSC or Waha, or Resource specific Concerns with FIP timing May require significant system changes

Real-Time Mitigation during Exceptional Fuel Cost Events RCWG discussion narrowed to the following: Settlement solution – Use Emergency Energy Settlement approach – Requires dispute and ERCOT capability to calculate (ERCOT does something similar today for LDL overrides) – Establish threshold to limit to exceptional events and infrequent use Changes to FIP – Provides a more market-based solution – Need to address FIP timing issues – Higher of HSC or Waha may better reflect ERCOT-wide marginal gas cost under current gas market – Same-day/intraday gas purchases still an issue

General Update Handy Whitman Index – continue using average of Steam Production Plant and Other Production Plant indices to escalate VC O&M Mitigated Offer Caps for QSGRs and CCGR Power Augmentation– ERCOT working on analysis of QSGRs Verifiable Costs for New Technologies – investigate verifiable costs for CAES upon resolution of NPRR560

Appendix - Real-Time Mitigation during Exceptional Fuel Cost Events Emergency Energy Settlement Approach Emergency Energy Volume- – Min (BP, RTMG) (minimum of Base Point or metered output) Current Settlement Price- – MAX (0, EMREPR – RTSPP) (maximum of 0 or Emergency Energy Price minus Real Time Settlement Point Price) – Manual solution would replace EMREPR with the appropriate MOC price recalculated at verified FIP (spot price paid for fuel during event) Requires dispute and ERCOT capability to calculate (ERCOT does something similar today for LDL overrides)