DISTRIBUTED POWER WIRELESS CONTROL SYSTEM

Slides:



Advertisements
Similar presentations
RAID (Redundant Arrays of Independent Disks). Disk organization technique that manages a large number of disks, providing a view of a single disk of High.
Advertisements

Slide 1 Copyright : Valiant Communications Limited Slide 1 VCL-SafeComm 8 E1 Links (24 E1 Ports) Orion Telecom Networks Inc Updated: April,
INPUT-OUTPUT ORGANIZATION
Slide 1 VCL-SafeComm 16 T1 Links (48 T1 Ports) Copyright : Valiant Communications Limited Slide 1 Updated: April, 2010 Telecom Transmission Solutions.
…performance audio networks. ABOUT RockNet => RockNet provides ultra low latency and very high audio quality. Genuine Audio Technology  RockNet is a.
Model W Wall Mount Static Transfer Switch. Why choose a model W static transfer switch? Increases power availability. Integrated maintenance bypass. True.
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
Valiant Communications Limited Slide 1 Updated : January, 2006 V aliant C ommunications L imited Telecom Transmission Solutions VCL-E3 OLTE 34Mbps.
ZXM10 EISU Training.
Load Management System
/// MELSEC Safety /// QS001CPU /// QS0J61BT12 /// QS0J65BTB2-12DT /// MELSEC Safety /// Mitsubishi Electric - MELSEC Safety - Training Documentation -
Lokotrack ST352 Presentation
Slide 1 Copyright : Valiant Communications Limited Slide 1 Orion Telecom Networks Inc Updated: April, 2010 V aliant C ommunications L imited.
Orion Telecom Networks Inc Slide 1 STM-1 63 E1 (Optical / Electrical) SDH Add-Drop Multiplexer Updated: Dec, 2010Orion Telecom Networks Inc
Slide 1 Copyright : Valiant Communications Limited Slide 1 Orion Telecom Networks Inc Updated: April, 2010 V aliant C ommunications L imited.
Multi Functional Digital Fault Recorder
Multi-DNC Data Collection/Monitoring
1 Rev /02 Modular Construction Dual/Redundant CPU/Power Supply Support TCP/IP Communication Protocol 4096 Camera by 512 Monitor Switching English.
1 Rev /02 Modular Construction Dual/Redundant CPU/Power Supply Support TCP/IP Communication Protocol 4096 Camera by 512 Monitor Switching English.
Enterprise Software Solution Lab Pvt Ltd
TCAS – Indian Railway Train Control System
Slide 1 Orion Telecom Networks Inc Slide 1 E1 Protection Fail-over Switch xcvcxv Updated: Aug, 2012Orion Telecom Networks Inc E1 Protection.
1 Engine Protector Safe Rider Vehicle Technologies (Pty) Ltd PO Box 11376, Rynfield South Africa Tel./ fax Cell:
EE 4272Spring, 2003 Chapter 9: Circuit Switching Switching Networks Circuit-Switching Networks Circuit-Switching Concept  Space-Division Switching  Time-Division.
DATALOGGER Welcome to the Presentation on DATALOGGER.
 A system consisting of a number of remote terminal units (or RTUs) collecting field data connected back to a master station via a communications system.
Copyright: Valiant Communications Limited Slide 1 1 x E1/T1 over Ethernet Multiplexer (TDMoIP) 1 x E1/T1 over Ethernet Multiplexer (TDMoIP) Product.
VCL-MX Version 6 DXC 80 E1, 160Mbps Digital Access Cross Connect Switch.
VCL-MX Version 6 DXC 80 E1, 160Mbps Digital Access Cross Connect Switch.
David Rogers, Stu Andrzejewski, Kelly Desmond, Brad Garrod.
1 SD Recorder OS-TM-V701A for Driving Security Surveillance.
SERIAL BUS COMMUNICATION PROTOCOLS
Unpack From Box and Inventory Technical Bulletin User’s Manual Assembly Procedure Direct or Strap Pole Mounting Kit Face to Southern Sky High Temperature.
SCADA and Telemetry Presented By:.
May 20, 2008 Train Detection 1 Train Detection Systems Mid-States Highway-Rail Grade Crossing Safety Conference Session 4 Use of New Technology for Highway-Rail.
DLP SYSTEM B-CDMA DIGITAL Wireless Conference SYSTEM.
POWER PLANT USED IN TELECOM
Smart transmitters.
DESIGN & IMPLEMENTATION OF SMALL SCALE WIRELESS SENSOR NETWORK
Single Loop Analogue addressable fire control Panel
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Presented BY:- S.KOTESWARA RAO 09511A0528. INTRODUCTION Bluetooth is wireless high speed data transfer technology over a short range ( meters).
A smart signalling system for Indian railways Smart signalling system – user’s view Full capacity realisation Flexibility of movements Easy to operate.
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
DEVICES AND COMMUNICATION BUSES FOR DEVICES NETWORK
Ver Ambara Software Technologies Pvt. Ltd. 302, 5B Cross HRBR Layout, 3 rd Block Bangalore Track tel DX100.
YASKAWA VS-606 V7 COMPACT VECTOR - CONTROLLED INVERTER FOR GENERAL USE 230V (Single-Phase).1Kw ~ 3.7Kw (.13HP ~ 5HP) 230V (Three-Phase).1Kw ~ 7.5Kw (.13HP.
Service Section Technical Training December 2005.
Overview of Fylde MPT1327 Trunking Equipment & Features OR
ECE 456 Computer Architecture Lecture #9 – Input/Output Instructor: Dr. Honggang Wang Fall 2013.
 Business Systems  Sales Presentation.  Euro ISDN & ISDN Feature Enhancements (CPC-EX V2) Euro ISDN Multiple ISDN pipes Sub-addressing 3.1Khz Audio.
Broadcasting devices. Broadcasting devices overview USB Power Monitor, type channel, 4-line display, USB, Digital out, Opto out WEB Power Monitor,
PROPRIETARY INFORMATION - © 2015 WOODWARD, INC. PAGE 1 HighPROTEC-2 MRI4-2 Feeder Relay Sales presentation 2015/08/10.
TRANSMISSION LINE MULTIPLE FAULT DETECTION AND INDICATION TO EB
An overview of I&C Systems in APR 1400 Parvaiz Ahmed Khand December 28, 2007.
INDUSTRIAL SEMINAR ON RDSO : TELECOMMUNICATION DEPARTMENT MADE BY: MAMTA CHAUDHARY
Chapter 8. Electrical Systems
Digital Access Cross Connect Switch
SCADA for Remote Industrial Plant
Haiwell PLC Modules Introduce
DS3 Fail-over Protection Switch
Programmable Logic Controllers (PLCs) An Overview.
Valiant Communications Limited
Chapter 2: Operating-System Structures
Valiant Communications Limited
Valiant Communications Limited
Series 5300 Lithium Cell Formation System
Chapter 2: Operating-System Structures
Field installable, upgradeable and scaleable
Presentation transcript:

DISTRIBUTED POWER WIRELESS CONTROL SYSTEM (DPWCS)

DISTRIBUTED POWER WIRELESS CONTROL SYSTEM (DPWCS) Provides coupling between locos through RF communication. Makes it possible to couple maximum of 4 locomotives to the Lead locomotives which can be connected in between or at the end of the train. It contains: “Control and Communication Unit” – One No. “Driver Interface Units” – Two Nos., one in each cab “Brake Interface Unit” – One No.

DPWCS IMPLEMENTATION BLOCK DIAGRAM CONTROL AND COMMUNICATION UNIT (CCU) DRIVER INTERFACE UNIT (DIU) CONTROL DESK 1 BRAKE INTERFACE UNIT (BIU) DRIVER INTERFACE UNIT (DIU) CONTROL DESK 2 TRAIN LINE

CONTROL & COMMUNICATION UNIT (CCU) SALIENT FEATURES CONTROL & COMMUNICATION UNIT (CCU) Processing Unit Powered with a redundant 32 Bit processor along with Interfacing unit for various kind of inputs. Redundant Processor 2 GB of solid-state memory to store events (logging). Real Time Clock (RTC) to enable recording of time tagged events External Watch Dog timer (WDT) for ensuring system health. A View of CCU

CONTROL & COMMUNICATION UNIT (CCU) SALIENT FEATURES CONTROL & COMMUNICATION UNIT (CCU) USB2.0 for Downloading and uploading 1500V isolation from Field Signals Data Logging for Event & Failure Operating Voltage 70 to 136V DC Operating temperature up to 75°C. CCU In the Machine room

SALIENT FEATURES RADIO (part of CCU) Frequency Range 405 to 407 MHz Channel Spacing 12.5/25kHz Carrier Power 10 W / 50 ohm   Data speed of radio 19200 bps @ 25 kHz, MTBF >60 years

DRIVER INTERFACE UNIT (DIU) SALIENT FEATURES DRIVER INTERFACE UNIT (DIU) 10.4” LCD with Touch Screen. Compact Design. Automatic Brightness control. User Friendly Interface. 10/100MBPS Ethernet Interface. Audio visual Indication for alert.

DPWCS DRIVER CONTROL PANEL

BRAKE INTERFACE UNIT (BIU) SALIENT FEATURES BRAKE INTERFACE UNIT (BIU) The BIU shall not interfere or cause any loss to the existing functionality of the IRAB system. System shall provide full control of the Automatic (Train) brakes, the Independent (Loco) brakes and emergency brakes. Capable to control the pressure with an accuracy of 0.05 kg cm2. During communication interruptions, BIU isolates itself from brake synchronization. Brake Interface unit

BRAKE INTERFACE UNIT (BIU) Brake Interface unit in Machine room SALIENT FEATURES BRAKE INTERFACE UNIT (BIU) Provision for Manual isolation Open/ Closed Feed back for BV out Valve Train Brake and Locomotive Independent Brake control available Scalable for Services Braking request application from TSS application Brake Interface unit in Machine room

CCU AND BIU IN THE MACHINE ROOM

FUNCTIONAL FEATURES OF DPWCS The system ensures authorized Login. The system considers BP continuity for Grouping Intelligent Neutral section negotiation is possible on all remote Loco. Pantograph lowering at trailing Locos corresponding to the Lead is possible. Train Parting is identified and the same is indicated on the DIU. Dynamic Brake is synchronised on the Trail Loco.

FUNCTIONAL FEATURES OF DPWCS On communication Failure the trailing Loco should come to zero notch. On resumption the self test shall be performed to ensure the identity and of trail loco and indication to be provided at DIU. If the Lead loco fails it is possible to work the train from the Lead at a restricted speed through DIU. It is possible to shutdown/energies remote locos from the lead locomotive through Driver interface unit.

FUNCTIONAL FEATURES OF DPWCS Possible to control traction notches or Braking notches from Lead locomotive through Driver interface unit. System is capable of identifying fault during the operation and displaying on DIU. Complete synchronizing of Remote Locomotive with the Lead Locomotive. BP Continuity check before grouping two locomotives.

FUNCTIONAL FEATURES OF DPWCS Automatic Neutral Section Negotiation in remote locos. Manual Traction Control for remote locos. Sensing of Train Partings. Fail Safe Logics. All parameters of Remote Locomotive available at Lead Locomotive screen. User Friendly operation

DIFFERENCE BETWEEN CONVENTIONAL AND DPWCS ENABLED TRAIN CONVENTIONAL TRAIN With Conventional Train the Tractive Force is applied from the front DPWCS ENABLED TRAIN Locomotives can be anywhere in the train consist as all the Locomotives are synchronized over the Radio Link.

CONVENTIONAL CONFIGURATION 1 Conventionally following configurations were used: Advantages : Higher tractive effort available. Single driver can operate train. Dis advantages: Higher coupler forces. Train length limited to 58 wagons in case of UIC braking. Localized force acting on the Track

CONVENTIONAL CONFIGURATION 2 In this configuration the locomotive at the rear provides a pushing force which is very useful in hilly terrains but implemented without DP(Manually synchronized over walkie talkie). ADVANTAGES : Higher tractive effort available. Lower coupler forces DIS ADVANTAGES: High risk of error as no automatic safety interlocks available. Synchronization of locomotives is done via walkie talkie voice communication between drivers .

POSSIBLE OPTIMAL CONFIGURATION WITH DPWCS The above is an optimal configuration to increase hauling capacity and can be implemented with DPWCS. ADVANTAGES : Higher tractive effort available. Lower coupler forces Faster braking. Brake pipe charging time reduced upto 50%.

APPLICATION OF THE DISTRIBUTED POWER WIRELESS CONTROL SYSTEM In the above DPWCS enabled configuration: The remote loco can duplicate all actions of the driver in the lead. The locomotive at the head/leading position would be manned, all other locomotives would be unmanned. The system can monitor train braking at remotes and provide feedback to the lead. It is possible to isolate the system in case of fault.

APPLICATION OF THE DISTRIBUTED POWER WIRELESS CONTROL SYSTEM Train parting can be detected and if occurs all remote locomotives to come to idle. The system is capable of simultaneously handling multiple trains equipped with the DPWCS in a radius of 3 kms efficiently and without loss of communication loss. The system operates in the 406 to 407 MHz UHF licensed band for Indian Railways.

STATUS OF PROVISION OF DPWCS 1. Details of RSP (i) Year of sanction 2010-11 (ii) Title of RSP Supply , fitment & commissioning of Locotrol (iii) RSP No. 1126/10-11,324/11-12 & 298/12-13 (iv) Qty & sanctioned cost- 10 sets (20 Nos), Rs.6.587 Crores 2. P.O Details P.O. No. 47.11.9002.1.70417dt -31.03.2012, M/s. Lotus Wireless Technologies India Pvt Ltd, VSKP , Qty-08 sets(16 Nos),Cost-Rs.3.116 Crores 3. Original DD 16.08.2012 4. Inspecting agency RDSO 5. Distribution Sr.DEE(TRS) AQ/CR =03 sets, Sr.DEE(TRS) LGD/SCR=03 sets, Sr.DEE(TRS)TATA/SER=01 set, Sr.DEE(TRS) BIA/ SECR=01 set.

STATUS OF PROVISION OF DPWCS 6. Inspection call to RDSO by firm - 25.07.2012 7. RDSO clearance after inspection - 21.03.2013 8. Allotment of frequency (WPC) - 02.05.2013 9. Present Status Material received at ELS/AQ & ELS/LGD. Under commissioning. DP extension received up to 30.6.2013 10.Date of field trials After receipt of network operating license from WPC wing, Ministry of Communications & IT ( Expected by the end of May’2013) 11. Provision of leaky cables in CR HQ ,S & T branch has awarded the tunnel no.1AB(KM-124, work to M/s.TVM signaling & NE Ghat, Kasara-IGP) Transportation Ltd, Bangalore on dt 29.04.2013