Midwest ISO Market Readiness Update October 27, 2004.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

Future of OASIS II Conference Presented by Karl Tammar – NYISO For the ISO/RTO Council March 29, 2005 ISO/RTO Activities and Initiatives.
Overview Seams Coordination Process. 2 Introduction Midwest ISO Non-profit organization that manages the reliable flow of electricity across much of the.
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
SIS Update on Eastern Seams Issues WECC SIS Meeting 2/1/12 Salt Lake City, UT.
Discussion of Inter-RTO Seams Issues Presented by: Midwest ISO and NYISO Independent Market Monitor David B. Patton, Ph.D. Potomac Economics October 7,
Highlights of the 2004 State of the Market Report New York Electricity Markets David B. Patton, Ph.D. Potomac Economics Independent Market Advisor May.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
1 MISO Business Plan: Enhanced Reliability, Customer Service & Market Implementation James P. Torgerson, President & CEO Midwest ISO December 17, 2003.
Topics The Midwest ISO The Midwest Market Market Design Process
Queue Reform at the Midwest ISO NARUC February, 2008.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
1 Presentation to the Wisconsin Industrial Energy Group (WIEG) T. Graham Edwards President & CEO August 9, 2007.
©2003 PJM FERC Technical Conference July 14, 2004 MISO-PJM-TVA Alain Steven Vice President and CTO PJM Interconnection.
Presentation to WECC Market Interface Committee March 24, 2015
NV Energy Energy Imbalance Market (EIM) Presentation to ISAS
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
Regional State Committees – The Midwest Approach Susan E. Wefald, President Organization of MISO States NARUC Summer Meeting – The Status of State Committees.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
EAEI Department  Electricity Markets and Policy Group Congestion Measures for Organized Electricity Markets in the U.S. Emily Fisher Lawrence Berkeley.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
© 2013 McNees Wallace & Nurick LLC October 17, 2013 Robert A. Weishaar, Jr. ON SITE ENERGY – INTERPLAY WITH PJM DEMAND RESPONSE PROGRAMS Harrisburg, PA.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
1 Demand Response in Midwest ISO Markets 09 February 2007.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Parallel Flow Visualization Project NERC ORS Meeting May 4, 2011.
A Strawman for Discussion by Dottie Stockstill & Greg Ramon Special ERCOT Board Meeting June 24, 2003.
1 October 2003 Electricity Markets Regional Evolution Randy Berry
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
Lead from the front Texas Nodal 1 Texas Nodal Congestion Revenue Rights (CRR) EDS 3 Release 7 - Overview EDS 3 Phase 2 MP Planning.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF - November 6 th, 2006.
Reconfiguring Nodal Stakeholder Participation Presentation to the ERCOT Technical Advisory Committee Texas Nodal Transition Planning Task Force February.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 1, 2007 Trip Doggett.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Update on Energy Imbalance Market Presentation to WECC Market Interface Committee October 15, 2015 Jim Price, Senior Advisor, Market Development & Analysis,
Texas Nodal Market Implementation Metric Sub Group Readiness Advisor January 30, 2006.
Congestion Hedging Process Transmission Planning Summit September 21-22, 2011.
Illinois Wholesale Market Update December 10, 2003.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
Texas Nodal Team Cost Benefit Group Background to Standard Market Design in New England March 2, 2004 Michael Taniwha Manager, Market Administration ISO.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
©2003 PJM North American Markets Status APEx Seoul, Korea October 29-31, 2006 Kenneth W. Laughlin.
1 Market Trials Update NATF May 4, 2010.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Retail Workshop ERCOT Nodal Update October 06, 2010.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
1 Market Trials Update NATF January 5, 2010.
Agenda Ej Lister – President & CEO – STOnavigator™ inc.
Market Trials Structured/Unstruc tured Test Overview December 14, 2012 Casey Cathey ·
CAISO Market Design Initiatives Update Donald Tretheway Senior Market Design and Policy Specialist CPUC Storage Proceeding January 14, 2013.
Alliance Update Illinois Commerce Commission Electric Policy Committee July 10, 2001.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
The Texas Nodal Market Trip Doggett ERCOT Interim President and Chief Executive Officer Mike Cleary ERCOT Chief Technology Officer Executive Briefing 28.
IMM Report on MISO South Integration Presented by: David B. Patton, Ph.D. Independent Market Monitor Presented to: Entergy Regional State Committee April.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
Page 1August 9, 2000Market Information Forum Market Information Forum ADS Phase 2 Update Presentation to Stakeholders Greg Ford and Kristen Kelley.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
IPC’s Energy Imbalance Market OATT Stakeholder Meeting
Wind Management at MISO
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
Briefing on 2017 CAISO Policy Initiatives Roadmap
PJM & Midwest ISO Market-to-Market Coordination (APEx Conference 2007)
Update on Energy Imbalance Market
Safe Harbor Statement The following is intended to outline our general product direction. It is intended for information purposes only, and may not be.
Presentation transcript:

Midwest ISO Market Readiness Update October 27, 2004

Page 2 Seams Agreements Created “Safe Operation Mode” with PJM –Response to lessons learned during AEP and DPL integration –Provides framework for efficient management of all seams Agreements with MAPP, SPP and TVA expected in December –MAPP, SPP and MISO working together to achieve a consistent congestion management process

Page 3 Parallel Operations I Parallel Operations Phase I is intended to simulate an end-to-end market experience –Internal capability testing in progress –Market Participant Interaction scheduled for November 8 through December 17 –Participants submit day-ahead and real- time bids/offers and schedules and reliability commitment offers

Page 4 Parallel Operations I, cont. –Clear day-ahead and real-time markets –Provide LMP data, unit commitment and schedules to participants –Bind constraints to relieve congestion –Produce daily settlement statements and weekly invoices

Page 5 System Operations and Parallel Operations II During System Operations, Midwest ISO will send target basepoints and Net Schedule Interchange to Market Participants and Control Areas –Generators will adjust generation levels in response –Tests are scheduled for December Parallel Operations Phase II, scheduled for January 3rd through 30 th, will test FERC GFA and JOA functionality Final system integration scheduled for February

Page 6 Participant Readiness 76% of eligible Market Participants participated in some aspect of Day in the Life Enhanced Market Trials 53% of Control Areas have completed open and closed loop tests –An additional 32% of Control Areas are expected to complete testing prior to the start Parallel Operations I –The remaining 15% are expected to complete testing during Parallel Operations I

Page 7 Stakeholder Participation Twelve items recently identified to increase stakeholder participation including –Reach out and create targeted training for smaller market participants –Include stakeholder personnel in MISO control room during Parallel Operations –Involve stakeholders in simulator training –Provide forum for additional interaction with Readiness Advisor on metrics

Page 8 Regional Operating Model Footprint Oversight Team will be responsible for –Centralized system-wide dispatch –Seams management –Overall control of the MISO footprint Remaining reliability coordinators and generation dispatchers assigned in teams to one of three discrete regions in order to –Increase in-depth knowledge of footprint –Provide better customer service