RHIC/AGS Polarimeter Study May 1, 2009 H. Huang, A. Zelesnki, B. Morozov.

Slides:



Advertisements
Similar presentations
AGS Status and Plans RHIC Spin Collaboration Meeting 2/4/11.
Advertisements

E.C. Aschenauer 2013/03/132 polarisation for Blue and Yellow t o -calibration underway minimal impact on polarization, makes A N more stable  should.
APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May
E.C. Aschenauer Phil Pile Meeting 2012/03/202 polarisation at injection Blue and Yellow Caveat: only first round of cleaning up noise in polarimeters.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
APEX Report: March 31 – April 1, 2009 Fulvia Pilat Time Meeting, April 7, 2009.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
Polarimetry of Proton Beams at RHIC A.Bazilevsky Summer Students Lectures June 17, 2010.
DIS 2006 Tsukuba, April 21, 2006 Alessandro Bravar Proton Polarimetry at RHIC Alekseev, A. Bravar, G. Bunce, S. Dhawan, R. Gill, W. Haeberli, H. Huang,
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
AGS pp Status Feb. 17, 2015 Time Meeting Haixin Huang.
Run 8 Polarization measurements from STAR BBC Andrew Gordon September 12, 2008.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Systematic Errors Studies in the RHIC/AGS Proton-Carbon CNI Polarimeters Andrei Poblaguev Brookhaven National Laboratory The RHIC/AGS Polarimetry Group:
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
Polarized beam in RHIC in Run Polarimetry at RHIC A.Zelenski, BNL PSTP 2011, September 13, St.Petersburg.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RHIC pp 500 GeV development M. Bai C-A Department.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Proton Polarimetry at RHIC K. Oleg Eyser for the CNI polarimeter group Newport News, VA, October 25, 2013.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
A. Zelenski a, G. Atoian a *, A. Bogdanov b, D.Raparia a, M.Runtso b, D. Steski a, V. Zajic a a Brookhaven National Laboratory, Upton, NY, 11973, USA b.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
The RHIC C-CNI polarimeter upgrade for 2009 Run. RSC Meeting, December 16, 2008 Anatoli Zelenski for polarimeter upgrade group. T.Russo, T.Curcio, D.Lehn,
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
Run6 CNI Analysis: Concluding Remarks and Summary of Systematic Uncertainties A.Bazilevsky For RHIC CNI group RHIC Spin Collaboration Meeting November.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
Beam intensity profile measurements with the RHIC (AGS) C-CNI polarimeters. Polarization profile measurements. Polarimeter target mechanisms upgrades.
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
Orbit related issues of the spin tune control at RHIC V.Ptitsyn, M.Bai, W.MacKay, T.Roser.
RHIC CNI Polarimeter status RHIC CNI Group February 26, 2008.
Update on the CNI polarimeter results for Run02 1.Bunch-by-bunch polarization study 2.Profiles of 0-pol bunches Osamu Jinnouchi.
P-Carbon CNI polarimeter upgrades. Vacuum system. Target drives. Targets. Polarimetry Workshop, July 31, 2009 A.Zelenski for polarimetry group.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
RHIC pC polarimeter what has been achieved and what needs to be done Osamu Jinnouchi RBRC 2/10/05 RSC meeting.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Haixin Huang AGS Cold Snake: Status and Plans.
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
E.C. Aschenauer RSC - Meeting 2012/03/232  Known complications:  100 GeV: o noise due to pickup especially at injection less significant at flat top.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
RHIC pC Polarimeters in Run9: Performance and Issues A.Bazilevsky for the RHIC CNI Group Polarimetry Worshop BNL, July 31, 2009.
CNI polarizations in Run09: Summary A.Bazilevsky For the RHIC CNI Group March 26, 2010 RSC meeting.
AGS Polarized Proton Status January 25, 2011 Vincent Schoefer.
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
Injector Status Feb. 9, 2016 Time Meeting Haixin Huang.
RHIC pC Polarimeter status A.Bazilevsky For RHIC CNI Group February 26, 2008.
APEX RUN-11 APEX Schedule Planned Feb. 23, pm ~ 3 ramps 8am 12x12 store Physics store Beta* unsqueeze +s* adjustment GRD+team 6x6 store AC dipole.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
LHC Wire Scanner Calibration
Beam-beam Effects in Hadron Colliders
Presentation transcript:

RHIC/AGS Polarimeter Study May 1, 2009 H. Huang, A. Zelesnki, B. Morozov

RHIC/AGS Polarimeter Study Fixed target polarization for two intensities (1.4 and 1.6*10^11) with 12 bunches in both rings with two polarimeters. AGS measurements were done with similar intensity. Polarization profile measurements were done with both rings and both planes with 56 bunches. AGS horizontal and vertical profiles were taken the same time. Sweep and fixed target measurements were done with 56 bunches for comparison. Note: Keith tuned emittance down for AGS before the study, we did not see much change on AGS IPM or CNI target scan, but the polarization profiles measured in AGS is flatter than before.

Yellow Vertical Polarization Profile

Yellow Horizontal Polarization Profile

Polarization Profiles of RHIC and AGS ring Horizontal P 0 sigma Vertical P 0 sigma AGS Blue Blue Yellow The profiles are consistent between AGS and RHIC with the statistics. The  actually is  P /  I. These numbers from last year at 100GeV are averaged 2.5, this year is about 3(average of many fills). Given the large error bars, I can’t say there is profiles developed in RHIC ramp.

Polarization Ratio of RHIC vs. AGS Intensity AGS blue1blue2yellow1yellow b1/ab2/ay1/ay2/a The expected ratio: Blue/AGS 0.978; Yellow/AGS (MacKay, Proc. EPAC06, p. 1795). All measurements were fixed target measurements. Due to low statistics, it is hard to draw concrete conclusion.

Polarization Measurements: Sweep vs. Fixed Target ring SweepFixed Target Blue Blue Blue Yellow Yellow Yellow Some measurements (blue1 and yellow1) are strange. But if you take all of them statistically, they show that the sweep measurements are ~1.2% out of 60%. Combined with the data taken at 12 bunches and fixed target, we expect that the RHIC sweep measurement at injection lower than AGS by only 2-4% out of 60%. This is different from 109 bunch injection measurements.