BPT2423 – STATISTICAL PROCESS CONTROL

Slides:



Advertisements
Similar presentations
a form of inspection applied to lots or batches of items before or after a process to judge conformance to predetermined standards Lesson 15 Acceptance.
Advertisements

Sampling Inspection.
Introduction to Statistical Quality Control, 4th Edition Chapter 14 Lot-by-Lot Acceptance Sampling for Attributes.
Implement sampling procedures
Chapter 9A Process Capability and Statistical Quality Control
Chapter 9A. Process Capability & Statistical Quality Control
ISQA 572/ 449 Models for Quality Control/ Process Control and Improvement Dr. David Raffo Tel: , Fax:
13–1. 13–2 Chapter Thirteen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Acceptance Sampling for Attributes Statistical Quality Control
Quality Control Chapter 9- Lot-by-Lot Acceptance Sampling
Section 7 Acceptance Sampling
Acceptance Sampling Acceptance sampling is a method used to accept or reject product based on a random sample of the product. The purpose of acceptance.
1 IES 331 Quality Control Chapter 14 Acceptance Sampling for Attributes – Single Sampling Plan and Military Standard Week 13 August 30 – September 1, 2005.
G – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Acceptance Sampling Plans G For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management Chapter 3 Supplement Roberta Russell &
Acceptance Sampling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
15 Lot-by-Lot Acceptance Sampling for Attributes Chapter 15
OC curve for the single sampling plan N = 3000, n=89, c= 2
Myth: “Acceptance sampling assures good quality.” Truth: Acceptance sampling provides confidence that p (the population fraction.
J0444 OPERATION MANAGEMENT SPC Pert 11 Universitas Bina Nusantara.
1 © The McGraw-Hill Companies, Inc., 2004 Technical Note 7 Process Capability and Statistical Quality Control.
CHAPTER 8TN Process Capability and Statistical Quality Control
TM 720: Statistical Process Control Acceptance Sampling Plans
Lot-by-Lot Acceptance Sampling for Attributes
Acceptance Sampling Lot-by-lot Acceptance Sampling by AttributesLot-by-lot Acceptance Sampling by Attributes Acceptance Sampling SystemsAcceptance Sampling.
1 1 Slide | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | UCL CL LCL Chapter 13 Statistical Methods for Quality Control n Statistical.
An AQL System For Lot-By-Lot Acceptance Sampling By Attributes
Statistical Quality Control/Statistical Process Control
1 Dr. Jerrell T. Stracener EMIS 7370 STAT 5340 Probability and Statistics for Scientists and Engineers Department of Engineering Management, Information.
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 8 Process Capability and Statistical Quality Control.
Steps in Using the and R Chart
9/17/2015IENG 486 Statistical Quality & Process Control 1 IENG Lecture 18 Introduction to Acceptance Sampling, Mil Std 105E.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10S Acceptance Sampling.
Statistical Process Control
Acceptance Sampling Plans Supplement G
Acceptance Sampling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Statistical Quality Control/Statistical Process Control
© 2007 Pearson Education   AQL LTPD Acceptance Sampling Plans Supplement I.
Acceptance Sampling Outline Sampling Some sampling plans
Operations Fall 2015 Bruce Duggan Providence University College.
 What type of Inspection procedures are in use  Where in the process should inspection take place  How are variations in the process detected before.
Chapter 15Introduction to Statistical Quality Control, 6 th Edition by Douglas C. Montgomery. Copyright (c) 2009 John Wiley & Sons, Inc. 1 Chapter 15-
1 © The McGraw-Hill Companies, Inc., Technical Note 7 Process Capability and Statistical Quality Control.
© 2007 Pearson Education   AQL LTPD Acceptance Sampling Plans Supplement I.
Besterfield: Quality Control, 8 th ed..© 2009 Pearson Education, Upper Saddle River, NJ All rights reserved Quality Control Chapter 10- Acceptance.
1 SMU EMIS 7364 NTU TO-570-N Acceptance Sampling Basic Concepts and Mathematical Basis Updated: Statistical Quality Control Dr. Jerrell T. Stracener,
Acceptance Sampling Terminology
Acceptance Sampling Systems For Continuous Production and Variables
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 10S Acceptance Sampling.
STATISTICAL QUALITY CONTROL (S.Q.C.) PRESENTED BY-: NIKHIL GARG ROLL NO
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Process Capability and Statistical Quality Control.
Acceptance Sampling Webinar Knowing What to Do Knowing How to Do It Getting Better Every Day.
Assignable variation Deviations with a specific cause or source. Click here for Hint assignable variation or SPC or LTPD?
Acceptable quality level (AQL) Proportion of defects a consumer considers acceptable. Click here for Hint AQL or producer’s risk or assignable variation?
Chapter 15Introduction to Statistical Quality Control, 7th Edition by Douglas C. Montgomery. Copyright (c) 2012 John Wiley & Sons, Inc. 1.
Lot-by-Lot Acceptance Sampling for Attributes
TM 720: Statistical Process Control Acceptance Sampling Plans
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Acceptance sampling Process of evaluating a portion of the product/material in a lot for the purpose of accepting or rejecting the lot as either conforming.
Introduction to Variability
What will be covered? What is acceptance sampling?
The Certified Quality Process Handbook Chapter 18: Sampling
Acceptance Sampling Outline Sampling Some sampling plans
What will be covered? What is acceptance sampling?
ACCEPTANCE SAMPLING FOR ATTRIBUTES
Acceptance Sampling May 2014 PDT155.
Statistical Quality Control, 7th Edition by Douglas C. Montgomery.
Steps in Using the and R Chart
Presentation transcript:

BPT2423 – STATISTICAL PROCESS CONTROL ACCEPTANCE SAMPLING BPT2423 – STATISTICAL PROCESS CONTROL

CHAPTER OUTLINE Fundamental Concepts Types of Sampling Plans Single, Double, Multiple and Sequential Statistical Aspects Lot-By-Lot Acceptance Sampling Plans for Attributes Acceptance Sampling Plans For : Continuous Production Variables

LESSON OUTCOMES Know the advantages and disadvantages of sampling Understand the types of sampling plans and selection factors Determine the Operation Characteristic (OC) curve for a single sampling plan and the properties

FUNDAMENTAL CONCEPT Lot-by-lot acceptance sampling by attributes is the most common type of sampling A predetermined number of units (sample) from each lot is inspected by attributes If the number of nonconforming units is less than the prescribed minimum, the lot is accepted; if not, the lot is not accepted Acceptance sampling can be used either for the number of nonconforming units or for nonconformities per unit Example : Lot size, N = 9000 Sample size, n = 300 Acceptance number, c = 2

FUNDAMENTAL CONCEPT Acceptance sampling is most likely to be used in one of five situations: When the test is destructive, sampling is necessary; otherwise, all of the units will be destroyed by testing When the cost of 100% inspection is high in relation to the cost of passing a nonconforming unit When there are many similar units to be inspected; with manual inspection, fatigue and boredom cause a higher percentage of nonconforming material to be passed than would occur on the average using a sampling plan When information concerning producer’s quality, such as X-Bar and R, p or c charts and Cpk is not available When automated inspection is not available

FUNDAMENTAL CONCEPT Advantages Disadvantages More economical (fewer inspectors and less handling) Upgrades the inspection job (piece-by-piece to lot- by-lot) Applies to destructive testing Stronger motivation for improvement (entire lots are not accepted rather than the return of a few nonconforming units) Certain risks of not accepting conforming lots and accepting non- conforming lots More time and effort is devoted to planning and documentation Less information is provided about the product There is no assurance that the entire lot conforms to specifications

FUNDAMENTAL CONCEPT Lot Formation can influence the effectiveness of the sampling plan: Lots should be homogeneous Lots should be as large as possible The sample units selected for inspection should be representative of the entire lot – random sampling There are a number of courses of action that can be taken on the non-accepted lots: Passed to the production facilities and the non- conforming units sorted by production personnel Rectified at the consumer’s plant by personnel from either the producer’s or the consumer’s plant Returned to the producer for rectification

TYPES OF SAMPLING PLANS Single – one sample is taken from the lot and a decision to accept or not accept the lot is made based on the inspection results of that sample Double – on the initial sample, a decision, based on the inspection results, is made whether: To accept the lot Not to accept the lot To take another sample If the quality is very good, the lot is accepted on the first sample and a second sample is not taken; if the quality is very poor, the lot is not accepted on the first sample and a second sample is not taken Only when the quality level is neither very good nor very bad is a second sample taken

TYPES OF SAMPLING PLANS

TYPES OF SAMPLING PLANS Multiple – is a continuation of double sampling in that three, four, five or as many samples as desired can be established. Sample sizes are much smaller Sequential – items are sampled and inspected one after another. A cumulative record is maintained and a decision is made to accept or not accept the lot as soon as there is sufficient cumulative evidence Remarks: All four types of sampling plans can give the same results. Thus, the type of plan for a particular unit is based on factors other than effectiveness These factor are simplicity, administrative costs, quality information, number of units inspected and psychological impact

STATISTICAL ASPECTS Operation Characteristic (OC) Curve for Single Sampling Plans In judging a particular sampling plan, it is desirable to know the probability that a lot submitted with a certain percent nonconforming, 100po , will be accepted – the OC curve will provide this information When the percent nonconforming is low, the probability of the lot being accepted is large and decreases as the percent nonconforming increases In graphing the curve with the variables 100Pa (percent of lots accepted) and 100po (percent nonconforming), one value, 100po , will be assumed and the other calculated

OC Curve for the Single Sampling Plan STATISTICAL ASPECTS Construction of an OC Curve Assume po value Calculate npo value Attain Pa values from the Poisson table using the applicable c and npo values Plot point (100po , 100Pa) Repeat 1,2,3 and 4 until a smooth curve is obtained OC Curve for the Single Sampling Plan

STATISTICAL ASPECTS Calculation:

Sample size as a fixed percentage of lot size STATISTICAL ASPECTS OC Curve Properties Acceptance sampling plans with similar properties can give different Operation Characteristic (OC) curve: Sample size as a fixed percentage of lot size Fixed sample size

STATISTICAL ASPECTS OC Curve Properties (cont.) As sample size increase, the curve becomes steeper As the acceptance number decrease, the curve becomes steeper

STATISTICAL ASPECTS Consumer-Producer Relationship There is a conflicting interest between the consumer and the producer when using acceptance sampling Ideal OC curve that is a vertical line can satisfy both – can be achieved only with 100% inspection Sampling carries risks of not accepting lots that are acceptable and of accepting lots that are unacceptable Acceptance Quality Limit (AQL) “Is the quality level that is the worst tolerable process average when a continuing series of lots is submitted for acceptance sampling. It is a reference point on the OC curve and is not meant to convey to the producer that any percent nonconforming is acceptable. It is a statistical term and is not meant to be used by the general public”

STATISTICAL ASPECTS Consumer-Producer Relationship (cont.) Producer’s Risk Represented by the symbol α, is the probability of non acceptance of a conforming lot This risk is frequently given as 0.05, but it can range from 0.001 to 0.10 or more It cannot be located on an OC curve unless specified in terms of the probability of acceptance This conversion is accomplished by subtracting from 1 Thus, Pa = 1 – α and for α = 0.05, Pa = 0.95

STATISTICAL ASPECTS Consumer-Producer Relationship (cont.) Limiting Quality (LQ) “Is the percent nonconforming in a lot or batch for which, for acceptance sampling purposes, the consumer wishes the probability of acceptance to be low” Consumer’s Risk Represented by the symbol β, is the probability of acceptance of a nonconforming lot This risk is frequently given as 0.10

STATISTICAL ASPECTS Consumer-Producer Relationship (cont.) Example: AQL = 0.7% There are 0.7% nonconforming will have a non-acceptance probability of 5% or in other words; 1 out of 20 lots that are 0.7% nonconforming will not be accepted by the sampling plan LQ = 2.6% There are 2.6% nonconforming will have a 10% chance of being accepted or in other words; 1 out of 10 lots that are 2.6% nonconforming will be accepted by this sampling plan

ACCEPTANCE SAMPLING PLANS Attributes Was first devised in 1942 by a group of engineers at Bell Telephone Laboratories for use by the US government It was designated JAN-STD-105 and adopted by the ISO and designated ISO/DIS-2859 Have been revised 5 times (MIL-STD-105E) and modified by American Society for Quality (ASQ) under the designation ANSI/ASQ Z1.4 – all tables and procedures remain unchanged

ACCEPTANCE SAMPLING PLANS Attributes (cont.)

ACCEPTANCE SAMPLING PLANS Continuous Production

ACCEPTANCE SAMPLING PLANS Variables

Table - Poisson Distribution