#3271 Sat 08-Dec-12. R56 Injector – BC2 GS calibration First calibrate BC2 1. Start with beam in centre of screen INJ-5. Read INJ-DIP-01 current and convert.

Slides:



Advertisements
Similar presentations
IK Slide 0 First look at the WCM data from July 2012 September 6 th 2012 Ian Kirkman.
Advertisements

ALICE Magnets Ben Shepherd MaRS Group ASTeC STFC Daresbury Laboratory.
#3224 Sat 17 th November Restored an “AP” set-up with some measurement of Twiss. – The idea was to take some BPM data with a known twiss set-up to see.
Nominal and no CSR (R 56-1 = 55 mm, R 56-2 = 59 mm, R 56-3 = 0) L1 phase = 21 deg, V 3.9 = 55 MV CSR OFF BC3 OFF Elegant Tracking  z1 = mm (post.
3/5/20121 Lattice modeling for a storage ring with magnetic field data X. Huang, J. Safranek (SLAC) Y. Li (BNL) 3/5/2012 FLS2012, Ring WG, X. Huang.
Beam-based Measurements of HOMs in the HTC Adam Bartnik for ERL Team, Daniel Hall, John Dobbins, Mike Billing, Matthias Liepe, Ivan Bazarov.
SLAC, 5-Dec-2006 Magnets and Magnetic Measurements for Prototype Energy Spectrometer T-474.
AR1 BPM Calibration (for new electronics) Before any TOA measurements we attempted to look at the BPM calibration (AR2-BPM-03) Turn off quads (Q1,Q2) and.
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
ALICE : Superconductive Energy Recovery Linac (ERL) “Quick course” for new machine operators Part 3: Experimental and Operational Procedures Y. Saveliev.
Ultra Low Vertical Emittance at the Australian Light Source Mark Boland on behalf of Rohan Dowd 1.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
ALICE August Summary. AP/FEL/Thz 3 blocks – A)7-11 Aug (7 shifts, # ) – B)16-17 Aug (4 shifts # ) – C)25-29 Aug b. hol. w/end (7 shifts # )
Beam current4 A Beam pulse length1.5 ms Power input/structure 35 MW Ohmic losses (beam on)1.6 MW RF power to load (beam on) 0.4 MW RF-to-beam efficiency.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
UNRELIABLE DATA, SEE FIRST SLIDE WARNING!!! Data taken on these shifts had attenuation factors set incorrectly and problems with faraday cup bunch charge.
Yichao Jing 11/11/2010. Outline Introduction Linear lattice design and basic parameters Combined function magnets study and feasibility Nonlinear dynamics.
Time Of Arrival/R56 measurements Period 13. Background Dave Newton’s Parameter scans \\Dlfiles03\alice\Simulations\R56 AR1 (parameter scan).pdf Deepa’s.
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
ALICE Commissioning Part II : Injector Yuri Saveliev Seminar on 14-15/07/2008 Gun to Booster Booster to FCUP-01 The rest of the Injector.
Analogue BPM data analysis Calibration & resolution results.
#Injector Twiss Measurement #3212 Sat 10 th November.
Transfer Line -2 Optics Design For CTF3 Amalendu Sharma, Abdurrahim, A.D.Ghodke, Gurnam Singh and V.C. Sahni Raja Ramanna Centre for Advanced Technology.
The impact of undulators in an ERL Jim Clarke ASTeC, STFC Daresbury Laboratory FLS 2012, March 2012.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
ASTRA Injector Setup 2012 Julian McKenzie 17/02/2012.
LCLS-II Magnet Error Sensitivities. Sensitivities of dipole magnets, from injector output (95 MeV) to SXR undulator input (4 GeV), where each plotted.
Fifth ATF2 Project Meeting, dec. 2007, KEK, Japan Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault,
#3191, 14 Oct 2012 Cabling installed to allow fast BPM electronics on injector BPMs System is flexible enough to allow different INJ-BPMs to be used (not.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Design of an Isochronous FFAG Ring for Acceleration of Muons G.H. Rees RAL, UK.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
3243 Fri 23 Nov Summary INJ-BPM-01: took 1 shot of data, just a reference to compare with previous recent shifts – Did not see a strong dominant 100 kHz.
BPMs period General BPM Tasks/Projects New single bunch BPM electronics on ALICE AR1 + ST2 They had been tested already last year by Alex and Ian.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Beam Dynamics Meeting Bolko Beutner, DESY Summary of new FLASH CSR studies Bolko Beutner, DESY Beam Dynamics Meeting
March-May 2012 AP Projects 1.Beam substructure. 2.Bunch length/energy spread in pre- compressed bunch using RF techniques with 325 kV gun voltage 3.TOA.
Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault, Brossard, P. Bambade (LAL) Main goal : - Try to improve.
Beam-Based Calibration Screen calibration. Two screens with BPM in between. Scan beam position with upstream dipole/corrector. Absolute calibration. One.
SLAC LET Meeting Global Design Effort 1 CHEF: Recent Activity + Observations about Dispersion in Linacs Jean-Francois Ostiguy FNAL.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
Slip stacking in Recycler Ioanis Kourbanis 9/14/11.
Status and plan of Beta-matching in Extraction line Kiyoshi Kubo.
Narrow plasma & electron injection simulations for the AWAKE experiment A. Petrenko, K. Lotov, October 11,
Beam dynamics and linac optics studies for medical proton accelerators
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Momentum and Momentum Spread Measurements
Further Tracking Studies and March Trip Plan
Grigory Eremeev, Joe Grames, Reza Kazimi, Yves Roblin
ILC Z-pole Calibration Runs Main Linac performance
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Optimization of Triplet Field Quality in Collision
Coupling Correction at the Australian Synchrotron
Beam Optics Set-Up at SLAC End Station A
Thermal emittance measurement Gun Spectrometer
Beam dynamics of Super-FRS and MM requirements
Time-Resolved Images of Coherent Synchrotron Radiation Effects
Beam Energy Measurements for Mott Run II : Dry run for Bubble
Linac/BC1 Commissioning P
A Virtual Implementation of VELA (CLARA)
VELA TDC: Bunch Length and Longitudinal Phasespace Measurements Update
Optics Measurements in the PSB
Linac Diagnostics Commissioning Experience
LCLS Injector Commissioning P
Linear beam dynamics simulations for XFEL beam distribution system
Presentation transcript:

#3271 Sat 08-Dec-12

R56 Injector – BC2 GS calibration First calibrate BC2 1. Start with beam in centre of screen INJ-5. Read INJ-DIP-01 current and convert to energy using magnet table 2. Increase BC2 gradient a little 3. Bring the beam back to the centre of INJ-5 by increasing INJ-DIP-01. Convert new dipole current to energy using magnet table 4. Repeat steps 2 to 3 several times so as to check linearity.

R56 Injector – BC2 GS calibration 1 unit increase in BC2 GS increases beam momentum by MeV

Injector Path Length vs Energy Use ST1-BPM-01, ¾ length stripline Measure time of signal by 50% level of peak Relative path length (mm) vs fractional momentum change INJ-Q06 Changed from 0.7 to 0.8A Nominal BURT INJ-QUAD10 changed from 0.7 to 0.8 Repeat Nominal BURT

R56 Injector Refine Try to measure R56 for each setting. Restrict data to parabolic section around dp/p = 0 “R56” varies considerably !! 5 to 136 mm

Analysis of nominal injector Just take parabolic part of data for nominal BURT ELEGANT model for nominal BURT INJ DIP ST1 BPM 01 PRELIMINARY!! NOT DEBUGGED R56 (m) T566 (m) Relative path length (mm) vs fractional momentum change

Analysis of nominal injector Agreement between model and measurement not too exciting. But, as the measurements show, injector path length quite sensitive to quad values (and thus quad degaussing). Also, in simulation, if I change INJ-QUAD-05 from 1.53 A to 1.63 A and INJ-QUAD-10 from 0.70 A to 0.75 A, I get R56 ~ 0.02 m and T566 ~ 1.20 m Also, more complications, could R51, R52 play a part? if booster exit trajectory is changed as BC2 gradient changes?

Dispersion Around Machine Nominal set up, in which AR1-SEXT-01 is ON. Note relatively small dispersion at AR1 exit and AR2 entrance

Dispersion Around Machine With AR1-SEXT-01 off to see how this affects things Note relatively large dispersion at AR1 exit and AR2 entrance

Dispersion Measurement Issues LC1 GS calibration was last measured carefully on #3058 at end of July Yuri measured LC1 GS on the shift after ours. Q. Any difference? A. Not significantly (see next slide). There is unresolved uncertainty in the BPM calibrations which also affects the dispersion value.

LC1 GS Calibration 3058, (July 2012). dE/dLC1GS = , (Dec 2012). 3 measurements scanning up-down-up in energy – dE/dLC1GS = 0.266,0.277, Infer from this that dE/dLC1GS has remained constant over second half of 2012

AR2 R56 Measure TOA on AR2-BPM-06 vs energy First time this has been measured Could argue R56 is consistent with zero