Idaho National Engineering and Environmental Laboratory Two Tube Failure Event for the Helium Cooled Blanket Lee Cadwallader and Brad Merrill INEEL Fusion.

Slides:



Advertisements
Similar presentations
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Advertisements

Idaho National Engineering and Environmental Laboratory SCWR Preliminary Safety Considerations Cliff Davis, Jacopo Buongiorno, INEEL Luca Oriani, Westinghouse.
Constellation Energy “The Way Energy Works” PWR Tritium Issues G. C. Jones.
Draft Deliberative Document1 of 15 Hydrogen Fuel Cell Vehicle Safety Research to Support Rulemaking/GTR Objectives September 2008 SGS
DEVELOPMENT OF RADIOLOGICAL SOURCE TERMS FOR NON-REACTOR ACCIDENTS Dale M. Petroff and Wendy C. Swygert Washington Safety Management Solutions.
ACADs (08-006) Covered Keywords Pressurized Water Reactor (PWR), Boiling Water Reactor (BWR), primary loop, reactivity, reactivity control, reactivity.
Modeling boiling water reactor main steam isolation valve leakage using MELCOR Presented at the 21 st Annual Regulatory Information Conference March 10-12,
Issues Associated with the Development of Severe Accident Management Guidelines for CANDU Reactors Keith Dinnie Director, Risk Management Nuclear Safety.
1 Failure modes, effects and rates and remote maintenance/downtime Introduction –Failure is defined as the ending of the ability of a design element to.
Failure Modes and Effects Analysis A Failure Modes and Effects Analysis (FMEA) tabulates failure modes of equipment and their effects on a system or plant.
1 ACPR Advanced, cost competitive, proven technology, and reliable The Third Generation Nuclear Reactor.
AREVA NP EUROTRANS WP1.5 Technical Meeting Task – ETD Safety approach Safety approach for EFIT: Deliverable 1.21 Lyon, October Sophie.
Safety and Environment Thrusts - Extension of the Fusion Safety Standard and Design Integration Through Safety Harnessing Fusion Power: ReNeWS HFP Theme.
Idaho National Engineering and Environmental Laboratory Safety Issues Related to Flibe/Ferritic Steel Blanket and Vacuum Vessel Placement Brad Merrill.
May 22nd & 23rd 2007 Stockholm EUROTRANS: WP 1.5 Task Containment Assessment IP-EUROTRANS DOMAIN 1 Design WP 1.5 Safety Assessment of the Transmutation.
US TBM Meeting INL, August 10-12, 2005 B. J. Merrill and D. A. Petti Fusion Safety Program Safety and Tritium R&D.
Idaho National Engineering and Environmental Laboratory Beryllium-Steam Reaction in Ceramic Blanket Brad Merrill and Lee Cadwallader Fusion Safety Program.
EUROTRANS - Helium cooled EFIT Probabilistic assessment of different DHR designs Karlsruhe, November Sophie EHSTER, Laurent VINCON.
ARIES Meeting General Atomics, February 25 th, 2005 Brad Merrill, Richard Moore Fusion Safety Program Pressurization Accidents in ARIES-CS.
March 8-9, 2004/ARR 1 Some of the Major Considerations in Designing a Ceramic Breeder Blanket for ARIES-CS Presented by A. R. Raffray With contribution.
Idaho National Engineering and Environmental Laboratory Safety Related Design Issues Brad Merrill, Dave Petti, Lee Cadwallader Fusion Safety Program ARIES.
Safety Considerations for the EU DCLL DEMO Blanket Dario Carloni 2nd EU-US DCLL Workshop 14-15th November 2014 UCLA.
Oxidation of Graphite Walls: Preliminary Results from SOMBRERO Safety Analysis S. Reyes, J. F. Latkowski Lawrence Livermore National Laboratory Laser IFE.
Tritium Safety Issues David Petti March 7, 2001 Tritium Town Meeting Livermore, CA.
March “Experience Gained from the Mexican Nuclear Regulatory Authority in the Probabilistic Safety Assessment Level 2 Development for Laguna.
Nuclear Power Dylan Waybright Kendall Caminiti Gina Raimondo Susan Ellington Paige Urbanovsky.
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.
TBM WG Meeting UCLA, March 2-4, 2005 Brad Merrill/Fusion Safety Program DCLL TBM Safety Update.
ERT 312 SAFETY & LOSS PREVENTION IN BIOPROCESS RISK ASSESSMENT Prepared by: Miss Hairul Nazirah Abdul Halim.
Analyses of representative DEC events of the ETDR
ERT 322 SAFETY AND LOSS PREVENTION RISK ASSESSMENT
Nuclear Power as a High Risk System And the Accident at Three Mile Island Discussing Perrow Chapters 1 and 2 Presented by Gus Scheidt Friday the Thirteenth.
1 RIC 2009 MELCOR Analyses to Address Regulatory Issues: Evaluation of System Success Criteria Hossein Esmaili USNRC March 12, 2009.
,Yalta,17-th Symposium of AER1 IMPACT OF CHANGED FUEL PERFORMANCES ON SAFETY BARRIER EFFECTIVENESS AT NORMAL OPERATION OF NPP WITH VVER A.V.
ATOMIC ENERGY 4 Binding Energy 4 Fission and Fusion 4 Nuclear Reactors 4 Electrical Generation.
V. Kim, V. Kuznetsov, G. Balakan ‑ South-Ukraine NPP, Ukraine G. Gromov, A. Krushynsky ‑ Analytical Research Bureau of SSTC NRS S. Sholomitsky, I. Lola.
Safety Requirements and Regulations 10/3/20121Safety Requirements & Regulations James Sears.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
Nuclear Chemistry Part II “The discovery of nuclear reactions need not bring about the destruction of mankind any more than the discovery of matches” -Albert.
ERMSAR 2012, Cologne March 21 – 23, 2012 ESTIMATION OF THERMAL-HYDRAULIC LOADING FOR VVER-1000 UNDER SEVERE ACCIDENT SCENARIO Barun Chatterjee 1, Deb Mukhopadhyay.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintainability and Availability Analyses L. M. Waganer The Boeing Company ARIES Meeting University.
IAEA International Atomic Energy Agency INTRODUCTION Module 2.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Defence in Depth Safety Culture Lecturer.
Ta’Juan Dutrieuille November 4, 2009 Period 1
Analysis on the amount of graphite dust deposited on steam generator of HTGR Wei Peng 1, Tian-qi Zhang 1, Su-yuan Yu 2 * 1 Institute of Nuclear and new.
Sandra Nilsen et. al Determination of Hazardous Zones Case study: Generic Hydrogen Refuelling Station.
The world and how it reacts to nuclear energy LeAnna.
ARIES Meeting University of Wisconsin, April 27 th, 2006 Brad Merrill, Richard Moore Fusion Safety Program Update of Pressurization Accidents in ARIES-CS.
Coal-Fired Plant Coal is conveyed to boiler In primary water loop, water is boiled into steam Steam is sent through turbine Turbine spins the generator,
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module VIII Integrated risk informed decision making Case Studies This material was prepared by.
Version 1.0, May 2015 SHORT COURSE BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components This material.
Nuclear power plant Performed by Zhuk A.D.. Purpose of this presentation is to show importance and danger of nuclear power plant. My opinion: I think.
Heat Transfer and Nuclear Reactions
BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components Case Studies Version 1.0, May 2015.
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
Hussam Khartabil GenIV Information Exchange Meeting April 29-30, 2003
Complementarity of deterministic and probabilistic approaches
Sandia National Laboratories
BASIC PROFESSIONAL TRAINING COURSE Module III Basic principles of nuclear safety Case Studies Version 1.0, May 2015 This material was prepared.
DCLL TBM Safety Status Brad Merrill, Fusion Safety Program
Harnessing Fusion Power: Safety and Environment - Overview and Thrusts
Session Name: Lessons Learned from Mega Projects
M. Vanuzzo, M. Carcassi. Università di Pisa
ACT1 LOFA model updates and LOCA analyses
BASIC PROFESSIONAL TRAINING COURSE Module VII Probabilistic Safety Assessment Case Studies Version 1.0, July 2015 This material was prepared.
Group 1 Best Group.
Preliminary Analysis of Loss of Vacuum Events in ARIES-RS
Version 1.0, May 2015 SHORT COURSE
RSFs & categorisation 20 May, 2019.
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
Presentation transcript:

Idaho National Engineering and Environmental Laboratory Two Tube Failure Event for the Helium Cooled Blanket Lee Cadwallader and Brad Merrill INEEL Fusion Safety Program ARIES meeting, UCSD March 8-9, 2004

Idaho National Engineering and Environmental Laboratory Background of this Safety Issue Two tube failure event –A two tube failure accident scenario begins with the failure of a blanket helium cooling tube that results in the over- pressurization and failure of a blanket module; then a steam generator tube also fails, allowing steam to enter the failed module and react with the beryllium multiplier pebbles Safety questions: –What are the safety concerns associated with this accident? –Given the category of accident we are dealing with, are accident mitigation measures needed for this accident? –If mitigation measures are required, which measures are preferred?

Idaho National Engineering and Environmental Laboratory Background (cont. 1) The safety concerns with this accident are the production of hydrogen and the potential of hydrogen explosions failing confinement boundaries –To date a detailed analysis of this accident has not been performed to assess the extent of the problem, including whether or not this accident will be confined to a single module or will propagate to adjacent modules because of the heat produced by the beryllium-steam reactions in the failed module –We hope to perform an analysis of this accident for the failed module within the next several months; our design point will be the ARIES-I blanket concept Based on the accident category: –If the two tube failure scenario falls into the beyond design basis accident (BDBA) category (frequency < /yr) and if the accident poses no serious safety risks (hydrogen explosions), then mitigation measures will not be required –If the accident poses serious safety concerns then mitigation measures will be required

Idaho National Engineering and Environmental Laboratory Background (cont. 2) There are at least three passive mitigation measures or systems that could be adopted –The strong box approach developed for the European Demo blanket design; however, then the blanket modules become safety grade systems which must be qualified and undergo periodic testing over the blanket lifetime –Steam dump valves on the secondary cycle that are regulated by pressure lines tied into the primary helium system (i.e., the spring of a standard pressure relief valve replaced by a pressure feed from the primary); however, adding valves adds other possible accident scenarios –Eliminate the secondary steam cycle by using a Brayton cycle operating directly on the primary system helium coolant

Idaho National Engineering and Environmental Laboratory A Brief Analysis has been Performed To determine the accident category of this two tube failure scenario, three cases were considered: –Failure of a blanket tube followed by the independent failure of a steam generator (SG) tube –Failure of a blanket tube combined with a pre-existing steam generator tube leak –Failure of a blanket tube and the dependent failure of a SG tube; that is, a blanket tube failure that causes an SG tube to fail

Idaho National Engineering and Environmental Laboratory Independent Tube Failures An independent tube failure assessment assumes that the failures of the two tubes being considered are independent events; that is, the failure of the first tube does not result in a condition for the second tube that is outside of the second tubes’ design envelope. Based on Gas Cooled Fission safety studies this would appear to be a credible assumption. For any one of the ~30 blanket modules plumbed to one SG (assuming the torus to be divided into quadrants), we estimated roughly 1 km of He tubing from the EU blanket module design drawings. The helium tube rupture failure rate was taken to be 1x /h-m. This gave 2.6x10 -3 /year as the blanket tube rupture frequency for a 30-module quadrant. Past GA safety work discussed SG tube failures in HTGRs. A conservatively high value of 7x10 -3 /rx-year was used for SG tube rupture. One hour was assumed as the accident duration time before the blanket was too cool for Be-steam reactions. Therefore, the coincident, independent failure of two tubes would equal 2.6x10 -3 /year x 7x10 -3 /rx-year x 1 rx/4 SGs x 1 h/8760 h/year = 5x /year, which is a BDBA.

Idaho National Engineering and Environmental Laboratory Blanket tube failure with pre- existing SG tube leakage PWRs have had troubles with SG integrity, so SG tube leakage was briefly investigated as a safety concern. If a blanket tube failed with pre-existing steam leaks, the accident frequency would be greatly reduced. HTGRs have usually operated with the steam pressure higher than the helium pressure since the helium had fission product gases, tritium, CO and CO 2 gases with C-14, etc., that required confinement. Past HTGRs have operated very leak tight, ~ 3E-06 atm-cm 3 /s. Newer fission plants (HTTR, HTR-10) and designs (NPR, Gen IV, etc.) also indicate that very tight SG systems are expected. Steam leaks were not considered to be a problem for ARIES due to the normal operation of helium at higher pressure than the steam and historical experience shows HTGR SGs have low leakage.

Idaho National Engineering and Environmental Laboratory Dependent SG Tube Failure This assessment investigates failure scenarios where the first tube failure leads to conditions that would fail the second tube. This could be the case if the primary helium coolant blowdown time is extremely short (on the order of one second). –Sudden pressure change of 70 atm on the tubes leading to overstress failure –Higher gas flow rate leads to higher flow-induced pressure forces on the tube bundle –Acoustic waves in helium cause tube vibration, and faster gas flow augments the acoustic waves Analysis performed for the Peach Bottom I SGs showed that large breaches of 0.2 and 0.75 m 2 did not damage the SGs. The EU blanket tube breach is only 1.26x m 2. PWR SGs typically operate with ~80 atm pressure difference from primary (150 atm) to secondary (67 atm). Because the primary depressurization time for a single blanket tube break is ~160 s, dependent tube failures are not viewed as a credible result of a blanket cooling tube breach event.

Idaho National Engineering and Environmental Laboratory Conclusions The preliminary analysis results are: –the independent failure of a blanket tube and an SG tube is a BDBA at an occurrence frequency of 5x /year –pre-existing tube leaks are not considered to be a significant concern –dependent SG tube failures are not considered to be a credible result of a small tube breach event Since this accident is thought to be a BDBA, passive or active measures or systems will only be required if detailed analysis indicates that radiological doses to the public do not meet regulatory limits; which measures to adopt if dose limits are exceeded are entirely up to the designer’s discretion. Brad Merrill will perform a detailed analysis of this accident scenario to determine hydrogen production, heat release, and radioactive material mobilization to characterize the BDBA.