ABPS Infrastructure Advisory Private Limited www.abpsinfra.com REC Mechanism in Himachal Pradesh Utility Perspective Ajit Pandit Director, ABPS Infrastructure.

Slides:



Advertisements
Similar presentations
Regulatory Framework and Emerging Issues Mahesh Vipradas.
Advertisements

1. Overview of the Legal Framework New Policy Initiatives Renewable Energy Certificate Mechanism 2.
Ministry of New & Renewable Energy B- 14, CGO Complex, Lodhi Road New Delhi Biomass Power in India – An Overview by VK JAIN Director & NPC Ministry.
Dr. Bader Eddin Al-Majali
Presented by: Indian Biomass Power Association An Overview.
Regulatory Environment and Small-hydro Development Professor Priyantha D C Wijayatunga Public Utilities Commission of Sri Lanka and University of Moratuwa.
RENEWABLE ENERGY FEED – IN TARIFF REGULATORY GUIDELINES Waste-to-Energy Seminar 17 July 2009 Cape Town By Bianka Belinska.
REC Mechanism: Opportunity for Investment in Wind Power Dr. Govind Bhagwatikar Siemens Limited: Wind Power Renewable Energy 2012 Wind Conference Pune,
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
LIVE GREEN. DO RIGHT. Renewable Energy Certificates By: Gensol Consultants Pvt. Ltd.
Energy Project Development A Discussion on State and Federal Incentives Presented By Dennis Plaster, General Manager.
Solar Energy Policy in Andhra Pradesh (AP) M. Thimma Reddy People’s Monitoring Group on Electricity Regulation Jaipur – 29/11/2013.
1 WIND POWER DEVELOPMENT: INDIA STATUS REPORT G M Pillai Founder Director General World Institute of Sustainable Energy (WISE), PUNE, INDIA -
1 Renewable Energy Options for the Indian Railways Amit Kumar TERI, New Delhi December 21, 2011.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
RENEWABLE ENERGY POLICY. Renewable energy is energy that comes from resources which are continually replenished such as sunlight, wind, rain, tides, waves.
Introduction to Climate Change: - global warming - basis steps in a clean development project - connection of CDM with European Trading Scheme Wim Maaskant.
Renewable Energy Certificate Mechanism
Discussion of Feed-in Tariff Pilot Programs September 18, 2013 Presentation to the Regulatory Flexibility Committee of the Indiana General Assembly 1.
Breaking Legal Grounds…. Implementing a PCF Project Sao Paulo, Brazil - November 20, 2002 Charlotte Streck, PCF.
Electricity Reforms in Bangladesh
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 9 Renewable Energy Module 9: REGULATORY MEASURES AND POLICY OPTIONS TO ENCOURAGE DEVELOPMENT.
Comparative Legal and Regulatory Framework of Nepal and India relating to Hydropower Development Advocate Amar Jibi Ghimire.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
CHITALE & CHITALE PARTNERS 1 POLICY FRAMEWORK FOR TRANSMISSION & DISTRIBUTION IN POWER SECTOR ADVOCATES & LEGAL CONSULTANTS ONGCONGC.
The World Bank Group Ashish Khanna India Energy Team Leader South Asia Sustainable Development.
Outline  Chronology  Conceptual framework  Salient Features of REC Mechanism  Role of Central Agency  REC Procedures  Current Status.
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Sanjay Garg General Manager PGCIL/ Ministry of Power
Total Installed Capacity (as on ) Renewable contributes 5-6% of total Electricity Generation Source: Central Electricity Authority 2.
Economic Instruments for Climate Change Mitigation Tradable Renewable Energy Certificates Workshop at the 2009 Climate Change Summit.
Legal developments in the Polish Power Sector Arkadiusz Krasnodębski.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
1 A Presentation on Regulatory Regime for Renewable Energy Projects in Andhra Pradesh.
08/12/2015 Developing renewable energy cost effectively EUROPEAN COMMISSION Tom Howes European Commission.
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
1/6/ Renewables Energy Sources - Regulatory perspective Presentation by Prashant Chaturvedi Secretary, MPERC.
New Challenges for the Power Sector 18 th India Power Forum On 17 th November, 2015, Hotel Imperial, New Delhi Presentation by: Shri V. S. Ailawadi – IAS.
1 “RENEWABLE PURCHASE OBLIGATION (RPO), MAHARASHTRA” MAHARASHTRA ENERGY DEVELOPMENT AGENCY (MEDA) Presented by:- Dr. J. V. Torane General Manager (REC,
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
RENEWABLE ENERGY POTENTIAL IN INDIA
Philippine Feed-In Tariff System Implementation 1.
Renewable Energy Act of 2008
Renewable Energy Certificates in Himachal Pradesh Role of HP regulator and Government By : Navneet Khokhar
Renewables Portfolio Standard Status Report California Public Utilities Commission February 26 th, 2008.
Discussion on Multi Year Tariff By Vivek Sharma & Manisha Kabra.
October, 2007 ABPS Infrastructure Advisory ABPS Infrastructure Private Limited _________________________________________ INTERNATIONAL ENERGY AGENCY IMPLEMENTING.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
1 Guidance on Renewable Energy in Federal Facilities under EO and EPACT 05 June 5, 2007 Anne Sprunt Crawley Federal Energy Management Program Energy.
Budapest, September 28-29, 2004 RES – E market developement in Poland.
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
ROK-PH Partneship: Exploring Cooperation in Renewable Energy Mr. Ariel D. Fronda Division Chief, Geothermal Energy Management Division Renewable Energy.
Renewable energy support schemes in the Republic of Moldova
Damitha Kumarasinghe Director General
State Electricity Regulatory Commission BOSNIA AND HERZEGOVINA
Operationalizing One Nation One Grid
Open Access.
Target Clients Renewable Energy Generators in India
STATE ENERGY AND WATER REGULATORY COMMISSION
Rajib Das Dy GM, Planning November 5, 2017 Transition of India’s
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
Challenges in Financing Renewable Energy
Analysis of Solar Power Market
Distribution Utility Meet (DUM 2017)
bihar electricity regulatory commission
India Energy Congress 2013 Sustainable Sources of Energy February 2013.
Presentation transcript:

ABPS Infrastructure Advisory Private Limited REC Mechanism in Himachal Pradesh Utility Perspective Ajit Pandit Director, ABPS Infrastructure Advisory Private Limited

ABPS Infrastructure Advisory Private Limited Outline of the Presentation Legal and Statutory Framework for Renewable Energy Development Regulatory Initiatives for Development of Renewable Energy Certificate Mechanism in India RE Certificate Mechanism in Himachal Pradesh : Utility Perspective – Significance of RPO – Opportunities & Liabilities – Implementation Issues – Consequences of non-compliance Way forward 23/05/2015 2

ABPS Infrastructure Advisory Private Limited Legal and Regulatory Framework for Development of Renewable Energy in India

ABPS Infrastructure Advisory Private Limited Key Drivers for Renewable Energy Development 23/05/ Source : Ministry of New and Renewable Energy RE capacity (18 GW) forms ~ 10% of total generation capacity (170 GW) in the country In energy terms, it constitutes ~ 4% - 5% of total consumption

ABPS Infrastructure Advisory Private Limited The EA 2003 has outlined several enabling provisions to accelerate the development of RE based generation: – (Section 3): National Electricity Policy and Plan for development of power system based on optimal utilization of resources including renewable sources of energy. – (Section 61(h)): Tariff Regulations by Regulatory Commission to be guided by promotion of generation of electricity from renewable energy sources in their area of jurisdiction. – (Section 86(1)(e)): Regulatory Commission to Specify Purchase Obligation from renewable energy sources. – (Section 66): Appropriate Commission shall endeavor to promote the development of market (including trading) in power in such a manner as may be specified and shall be guided by National Electricity Policy in Sec 3 Electricity Act, 2003 : Enabling Provisions

ABPS Infrastructure Advisory Private Limited  Appropriate Commission shall fix RPO and SERCs shall fix its tariff latest by April 1, 2006  Initially Appropriate Commission to fix preferential tariffs for distribution utility to procure RE  In future, distribution utility to procure RE through competitive bidding within suppliers offering same type of RE  In long-term, RE technologies need to compete with all other sources in terms of full costs  CERC to provide guidelines for pricing non-firm power if RE procurement is not through competitive bidding Tariff Policy (January 2006)

ABPS Infrastructure Advisory Private Limited  SERCs shall fix separate RPO for purchase of energy by the Obligated Entities from Solar Energy Sources  Solar RPO to go up to 0.25% by the end of and further up to 3% by 2022  Purchase of energy from non-conventional sources of energy to take place more or less in same proportion across different states  Renewable Energy Certificate Mechanism may be one of the mechanisms to achieve such target  It will take some time before non conventional technologies to compete with conventional technologies and accordingly procurement of renewable energy to be done on preferential tariff determined by Appropriate Commission Amendment to Tariff Policy (January 2011)

ABPS Infrastructure Advisory Private Limited Promotion of Renewable Energy by Policy Design and Regulatory Initiatives o Electricity Act 2003 (Jun 2003) o National Electricity Policy (Feb 2005) o National Tariff Policy (Jan 2006) o National Action Plan on Climate Change (Jun 2008) 23/05/ Central Government o Regulations for Preferential Tariff for RE (Sep 2009) o Renewable Energy Certificate Mechanism (Jan 2010) o Implementation Framework (2010 – ongoing) Central Electricity Regulatory Commission o Preferential RE Tariff Orders by SERCs (2002–2010) o Over 19 States have mandated Renewable Purchase Obligations (2004 – 2010) o Modification to RPO and adoption of REC framework State Electricity Regulatory Commission

ABPS Infrastructure Advisory Private Limited A BC A - Market model based on Open Access/wheeling for self use B - Model based on FIT and RPO for sale to distribution licensee & third party, within State C- Market model based on instruments with cross border features (REC) catering to National level demand Evolution of Market Model & Role of Utility

ABPS Infrastructure Advisory Private Limited Key Challenges in Encouraging Deployment of RE 23/05/  Enabling Mechanism for Inter-State sales of Renewable Energy  Cost Effective Mechanism for purchase of Renewable Energy  Nation wide target for purchase of Renewable Energy  Stronger enforcement and penalty mechanism  Mechanism for purchase of small quantity of RE by individual Open Access consumer FOR Report (Nov 2008) on ‘Policies for Renewables’ recommended:  Need to facilitate ‘Inter-State Exchange of RE Power from National Perspective  Explore feasibility of introduction of REC mechanism as tool to promote RE within framework of EA 2003 Forum of Regulators (FOR) initiated study to address challenges

ABPS Infrastructure Advisory Private Limited NAPCC : Guideline for RE Development National Action Plan for Climate Change (NAPCC)  At National level for FY 2010, target for RE Purchase may be set at 5% of total grid purchase, to be increased by 1% each year for 10 years  SERCs may set higher target than this minimum at any point in time  Central & State Govts may set up a verification mechanism to ensure that renewable power is actually procured  Appropriate authorities may issue certificates that procure renewable power in excess of the national standard. Such certificates may be tradable, to enable utilities falling short to meet their RPS  Penalties as may be allowed under EA 2003 may be levied, if utilities are still falling short in RPS 23/05/

ABPS Infrastructure Advisory Private Limited NAPCC has set challenging target for RE Development 23/05/ NAPCC target of 5% for RE Procurement in 2010 Target to increase by 1% each year to reach 15% by 2020 Separate target for Solar Energy Provides for creation of Renewable Energy Certificate Mechanism NAPCC identified REC framework to realize annual target of National RPO Considering that demand for electricity would increase to 1700 BU by 2020, it would create market for 255 BU units of renewable energy generation

ABPS Infrastructure Advisory Private Limited Regulatory Initiatives for Development of Renewable Energy Certificate Mechanism in India

ABPS Infrastructure Advisory Private Limited Key Objectives for Introduction of REC Mechanism 23/05/  Effective implementation of RPO  Increased flexibility for participants  Overcome geographical constraints  Reduce transaction costs for RE transactions  Enforcement of penalty mechanism  Create competition among different RE technologies  Development of all encompassing incentive mechanism  Reduce risks for local distributor by limiting its liability to energy purchase In the view of hurdles faced by RE Development, it appears that these objectives should take precedence over others  In Indian Context, following aspects had to be considered for REC design  Electricity Market is regulated to great extent  (> 90% of electricity volumes continue to be transacted at regulated rate)  Preferential RE Tariff regime to continue (Feed-in tariff & REC to co-exist)

ABPS Infrastructure Advisory Private Limited Concept of REC Mechanism in India 23/05/ Avg. PP Cost of Host Utility (regulated) Market Rate as per Power Exchange At Tariff Determined by Regulatory Commission Renewable Energy Electricity REC Distribution Company Renewable Energy Electricity REC Distribution Company Obligated Entity (Buyer) Existing Mechanism REC Mechanism OA / Trader Bilateral agreement (de-regulated)

ABPS Infrastructure Advisory Private Limited REC Pricing Framework 23/05/ Renewable Energy Electricity Component REC Component (Environmental Attribute) Market Discovered Price (Obligated Entity/Voluntary Buyer) Average Power Purchase Cost (Distribution Utility) Andhra Pradesh- Rs 1.78/kWh Maharashtra- Rs 2.43/kWh Karnataka- Rs 1.85/kWh Kerala- Rs 1.46/kWh Tamil Nadu- Rs 2.62/kWh Himachal Pradesh- Rs 1.48/kWh Rajasthan- Rs 2.48/kWh Parameters Non Solar REC Solar REC Forbearance Price (Rs/MWh) Floor Price (Rs/MWh) Bilateral Agreement (de-regulated) (OA User/Trader)

ABPS Infrastructure Advisory Private Limited Entities involved to Operationalise REC Mechanism 23/05/ Institutional Framework Central Entities State Entities  Forum of Regulators  Central Electricity Regulatory Commission  Central Agency (National Load Despatch Centre)  Power Exchanges  Compliance Auditors  State Electricity Regulatory Commission  State Load Despatch Centre  State Agencies  Eligible Entities  Obligated Entities

ABPS Infrastructure Advisory Private Limited Key Role performed by FOR Formulated Model REC Regulations for SERCs Sought Legal Opinion from Solicitor General on key legal aspects – Applicability of RPO to Captive Users and Open Access Consumers – Statutory backing for Enforcement mechanism as regulatory measure Introduced Enforcement Mechanism for non-compliance – Apart from legal provisions under EA 2003, obligated entity has to contribute a charge to Fund at Forbearance Price. – Fund to be utilised for purchase of RECs or creation of RE infrastructure as directed by SERCs Extended scope of RPO applicability to captive users, open access consumers apart from DISCOMs Undertook study for setting RPO targets and long term trajectory at National level to accomplish NAPCC goals

ABPS Infrastructure Advisory Private Limited Initiatives for the Implementation of REC Mechanism 23/05/

ABPS Infrastructure Advisory Private Limited Overview of RE Framework in Himachal Pradesh

ABPS Infrastructure Advisory Private Limited  State has vast hydro potential in India  MNRE has identified around 536 sites with a total potential of around MW  The State has installed power generation capacity of around MW and another 132MW is under implementation, predominantly comprising Small Hydel Power.  Biomass Power Generation Potential comprises of around 415MW (Agro based - 133MW & Forest Residue based – 282MW)  Wind Energy have little or no power generation potential in the State Renewable Energy in Himachal Pradesh Source : Ministry of New and Renewable Energy

ABPS Infrastructure Advisory Private Limited  State Commission specified RPPO as 20% for distribution licensee, vide Notification dated June 18, Quantum of purchase of electricity from renewable sources.-( 1) Energy from renewable sources and cogeneration, available after the captive use and third party sale outside the State, shall be purchased by the distribution licensee(s): Provided that subject to the availability of renewable energy and co-generation within the area of a distribution licensee the quantum of purchase of energy from renewable sources and cogeneration by a distribution licensee, under these regulations shall be minimum 20% of its total consumption during a year ; ………………………………………. (4) Subject to supply constraints or any other uncontrollable factors, the Commission may, at the request of the distribution licensee, waive off the quantum of purchase laid down under sub-regulation(1).  Applicability of RPPO was for 3 years Past Initiatives for Promotion of RE and impact on DISCOM  During 2009, RPPO achievement was around 4% against target of 20%  During 2010, RPPO achievement increased to 7%  Renewable Energy is essentially available from SHP

ABPS Infrastructure Advisory Private Limited  May 2010, HPERC had specified Regulations recognising REC as valid instrument for compliance of RPPO by ‘Obligated Entity’  RPPO shall be applicable to,  Distribution Licensee  Person consuming electricity generated from Conventional Captive Generating Plant having capacity 1MW and above for his own use  Person consuming electricity procured from conventional generation through Open Access  Quantum of ‘minimum’ Renewable Power Purchase,  Commission may suo-motu or on request of a licensee, revise the targets in supply constraints and factors beyond control of licensee  Solar Obligation shall be fulfilled through purchase of solar energy or by Solar REC only Change in Scenario : Recent Initiatives RPO REC Regulations YearNon Solar RPOSolar RPOTotal %-10.0% %0.1%11.1% %0.1%12.1%

ABPS Infrastructure Advisory Private Limited  Distribution Licensee may purchase renewable energy or renewable energy certificates for compliance with the RPPO targets  Distribution Licensee to indicate the estimated quantum of purchase for the ensuing year in tariff/annual performance review  Estimated quantum shall be in accordance with the RPPO  Unable to fulfil the obligation, the shortfall of the specified quantum of that year would be added to the specified quantum for the next year but credit of excess RE purchase shall not be adjusted  If fulfilling the RPPO through Purchase of Certificates Solar RPPO shall be fulfilled by purchase of Solar REC only  Certificates under respective category shall be purchased from Power Exchange(s) operating under the guidance of CERC only  Obligated Entity should deposit Certificates with the Commission as per the procedure specified by CERC to show compliance with RPPO Duties of Distribution Licensee

ABPS Infrastructure Advisory Private Limited  Non fulfillment of RPPO in any year through procurement of RE or through purchase the respective RECs, Commission may direct ‘Obligated Entity’ to create and maintain separate fund  Obligated Entity to deposit an amount determined on the basis of shortfall in units in RPPO and Forbearance Price determined by CERC  Fund shall be utlilised on the direction of Commission for purchase of RECs and partly for the development of infrastructure for evacuation of power from RE generating stations  Obligated Entity may be liable for penalty under Section 142, if fails to comply with the RPPO  In case of genuine difficulty in compliance with RPPO, the Obligated Entity may approach Commission to carry forward the compliance requirement to next year  Section 142 shall not be invoked if Commission has consented to carry forward the compliance requirement Section 142 (Punishment for Non-Compliance of Directions by Appropriate Commission) the Appropriate Commission may after giving such person an opportunity of being heard in the matter, by order in writing, direct that, without prejudice to any other penalty to which he may be liable under this Act, such person shall pay, by way of penalty, which shall not exceed one lakh rupees for each contravention and in case of a continuing failure with an additional penalty which may extend to six thousand rupees for every day during which the failure continues after contravention of the first such direction Recent Initiatives : Consequences of Non Compliance

ABPS Infrastructure Advisory Private Limited Impact on DISCOM for Compliance of RPPO using RECs DescriptionFY 11FY 12FY 13FY 14FY 15 Energy Requirement (MU) Non Solar RPO (%)10% 11%12%13%14% Solar RPO (%) -0.10% Non Solar RPO (MU) Non Solar RE Available (MU)* Non Solar Shortfall (MU) Solar RPO (MU) Solar Available (MU) Solar Shortfall (MU) * Note : assumed additional availability of at least 100 MU p.a. of non-solar RE power

ABPS Infrastructure Advisory Private Limited Impact on DISCOM for Compliance of RPPO using RECs

ABPS Infrastructure Advisory Private Limited Status of Accreditation and Registration of Projects 23/05/

ABPS Infrastructure Advisory Private Limited Status of Transaction of RECs 23/05/

ABPS Infrastructure Advisory Private Limited  REC mechanism offers alternative to fulfill RPO targets by Obligated Entities.  Obligated Entities can plan to meet their RPO targets in efficient manner.  Long term visibility of Floor Price and Forbearance price is necessary to ensure regulatory certainty for Utility as well as RE project developers.  Impact on Avg. power purchase cost of Utility is not very significant.  Utility /SERCs may develop Model Power Purchase Agreement for procurement of electricity from RE projects at APPC.  Bilateral transactions of RECs as & when enabled would provide larger flexibility and liquidity for REC market, which is the need of the hour. Way Forward

ABPS Infrastructure Advisory Private Limited ABPS Infrastructure Advisory Practical Solutions to Real Life Problems ABPS Infrastructure Advisory A-309, Kohinoor City Kirol Road, off LBS Marg Kurla (West), Mumbai Ph: / Fax: