1 ELECTRIC POWER GRID INTERDICITION Javier Salmeron and Kevin Wood, Naval Postgraduate School Ross Baldick, University of Texas at Austin Sponsored by.

Slides:



Advertisements
Similar presentations
1 Overview. 2 Benefits of RATC Applications Real-time corrective Hour ahead corrective and preventive Day ahead corrective Day ahead market/economic based.
Advertisements

Transparent, Repeatable, Defendable, and Published Generation, Transmission & Nat Gas Network Co-Optimizations
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
METHODOLOGY FOR IDENTIFYING NEAR-OPTIMAL INTERDICTION STRATEGIES FOR A POWER TRANSMISSION SYSTEM Vicki M. Bier, Eli Robert Gratz, Naraphorn J. Haphuriwat,
Markov Game Analysis for Attack and Defense of Power Networks Chris Y. T. Ma, David K. Y. Yau, Xin Lou, and Nageswara S. V. Rao.
Improving Transmission Asset Utilization through Advanced Mathematics and Computing 1 Henry Huang, Ruisheng Diao, Shuangshuang Jin, Yuri Makarov Pacific.
1 Grid Modernization – A Strategic Imperative for 2050 Advanced Energy Conference May 1, 2013 By Carl Imhoff Electric Infrastructure Sector Manager Pacific.
Fiscal Year 2008 Urban Areas Security Initiative Nonprofit Security Grant Program Investment Justification Questions, Criteria, and Prioritization Methodology.
1 ELECTRIC POWER GRID INTERDICTION Javier Salmeron and Kevin Wood, Naval Postgraduate School Ross Baldick, University of Texas at Austin Sponsored in part.
Update to AABE on DOE Smart Grid Investment Grants and Smart Grid Regional Demonstrations Christopher Irwin Smart Grid Standards and Interoperability Coordinator.
By Lauren Felton. The electric grid delivers electricity from points of generation to consumers, and the electricity delivery network functions via two.
Jeffery J. Gust IOWA INDUSTRIAL ENERGY GROUP FALL CONFERENCE Tuesday, October 14, 2014 MidAmerican Energy Company.
Distributed Power Systems ELCT 908
Severe Solar Activity/Space Weather and the Global Threat to Electric Grids John G. Kappenman Storm Analysis Consultants.
SMART GRID: What is it? Opportunities, and Challenges
Javad Lavaei Department of Electrical Engineering Columbia University Joint work with Somayeh Sojoudi Convexification of Optimal Power Flow Problem by.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
A Survey of Energy, Water, and Environment Complex Networks Present By: Eric Klukovich Date: 10/21/14.
ELECTRICAL CRITICAL INFRASTRUCTURE SECURITY Charles Hookham, P.E., M.ASCE, VP, Utility Projects HDR Engineering 1.
THE TRES AMIGAS SUPERSTATION IIEA - Dublin October 8, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
1 Some Issues about Big Data in Power Grid Gary Quan.
ARTIFICIAL INTELLIGENCE IN HOMELAND SECURITY Patrick Hathaway CS572 – Advanced Artificial Intelligence.
Power Magazine Visuals © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. June 28, 2012.
KEEPING THE LIGHTS ON: STRATEGIES FOR COMPATIBILITY AND INTEROPERABILITY IN ELECTRIC POWER NETWORKS SURVIVABILITY OF COMPLEX NETWORKS October 27, 2011.
Infrastructure & Cities Sector – Smart Grid Division © Siemens AG All rights reserved. October 2012Page 1 The Smart Grid by Siemens Constant energy.
FY 2005/06 Accomplishment Eastern Maine Medical Center (EMMC) Receives “Critical Power Reliability” from CHP System CHP System Construction Project is.
Severe Solar Activity/Space Weather and the Global Threat to Electric Grids John G. Kappenman.
1 Critical Mission Support Through Energy Security Susan Van Scoyoc Concurrent Technologies Corporation 16 August 2012 Energy Huntsville Meeting Huntsville,
1 Spare Transformer Equipment Program (STEP). 2 STEP Objectives Industry initiative to increase the number of available spare transformers for use following.
Status Report for Critical Infrastructure Protection Advisory Group
1 Distribution System Expansion Planning Using a GA-Based Algorithm Shiqiong Tong, Yiming Mao, Karen Miu Center for Electric Power Engineer Drexel University.
Phoenix Convention Center Phoenix, Arizona When Prevention and Preparation May Not be Enough: Resilience and Recovery for the Electricity Sub-Sector Operational.
Power System Economics Daniel Kirschen. Money © 2012 D. Kirschen & University of Washington1.
Role for Electric Sector in Critical Infrastructure Protection R&D Presented to NERC CIPC Washington D.C. June 9, 2005 Bill Muston Public Release.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
20th Century Electric Transmission Grid
THE TRES AMIGAS SUPERSTATION ABB Western Utility Executive Conference September 28, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Model-Centric Smart Grid for Big Data
North American Energy Infrastructure Policy Philip Gonda Steven Mays Robert Floyd Josh Kapp.
CIP Version 4 The Basics. CIP Version 4- Background Centers around expanded criteria for Critical Assets – FERC thought Risk Based Methodologies used.
Cheng-Ting Hsu Presenter: Cheng-Ting Hsu Cogeneration System Design for a High-Tech Science-Based Industrial Park Department of Electrical Engineering.
Grid Defense Against Malicious Cascading Failure Paulo Shakarian, Hansheng Lei Dept. Electrical Engineering and Computer Science, Network Science Center,
1 Thoughts on ERCOT-Wide Critical Infrastructure Protection Committee Bill Muston October 31, 2006.
Smart Grid Schneider Electric Javier Orellana
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Fiscal Year 2007 Urban Area Security Initiative Nonprofit Security Grant Program Investment Justification Questions, Criteria, and Prioritization Methodology.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
PJM©2014www.pjm.com A System Operator’s Resilience Wish List Tom Bowe Executive Director Reliability and Compliance PJM Interconnection
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
Network Dynamics and Simulation Science Laboratory Structural Analysis of Electrical Networks Jiangzhuo Chen Joint work with Karla Atkins, V. S. Anil Kumar,
Security and Resilience Pat Looney Brookhaven National Laboratory April 2016.
ELECTRIC POWER GRID INTERDICTION
Electricity is produced at the power station.
STANDARDS AND THE FUTURE OF DISTRIBUTED ELECTRICITY
ELECTRIC POWER GRID INTERDICITION
Risk Assessment and Probabilistic Transmission Planning Methods
ECEN 460 Power System Operation and Control
Secure Control Systems - A Quantitative Risk Management Approach
Pacific Power Seismic Preparedness Update
Role for Electric Sector in Critical Infrastructure Protection R&D
Factors to Consider when Designing a Reliable Power Grid
Vicki M. Bier, Eli Robert Gratz, Naraphorn J
Alison Silverstein Contributor to DOE 2017.
Factors to Consider when Designing a Reliable Power Grid
Deborah Housen-Couriel, ADV.
UM 1856 PGE’s Energy Storage Proposal – Commission Workshop #1
Presentation transcript:

1 ELECTRIC POWER GRID INTERDICITION Javier Salmeron and Kevin Wood, Naval Postgraduate School Ross Baldick, University of Texas at Austin Sponsored by DoJ, Office of Domestic Preparedness

2 Purpose In this presentation we will... Show the importance of analyzing vulnerabilities of electric power systems to terrorist attacks Present our models, and exact and heuristic algorithms to carry out this analysis Present results on standard IEEE Reliability Test Networks

3  “One can hardly imagine a target more ideal than the U.S. domestic energy” (A.B. and L.H. Lovins, 1983)  “Any U.S. region could suffer lasting and widespread blackouts if three or more substations were targeted.” (OTA, 1990)  “The U.S. is at, or is fast approaching, a crisis stage with respect to reliability of transmission grids.” (NERC, 2001)  “The U.S. electric power systems must clearly be made more resilient to terrorist attack.” (Committee on Science and Technology for Countering Terrorism, NRC, 2002) A Long-Recognized Issue (I)

4  (On Ahmed Ressam) “They were specifically trained to attack critical infrastructure, including electric power plants.” (CNN, 2002)  “And the threat isn't simply academic. U.S. occupation forces in Afghanistan discovered Al Qaeda documentation about the facility that controls power distribution for the eastern U.S., fueling fears that an attack on the power grid may one day become a reality.” (Energy Pulse, 2003)  “Blue Cascades” project (simulated terrorist attack on the Pacific Northwest's power grid). The study showed that such an attack, if successful, could wreak havoc on the nation's economy, shutting down power and productivity in a domino effect that would last weeks. (Energy Pulse, 2003) A Long-Recognized Issue (II)

5 Terrorist Threat Potential targets:  Generating plants  Transmission and distribution lines  Substations Easy disruption + Widespread damage + Difficult recovery

6 Assumes Information Transparency: Same information is available to both sides Uses optimization to assess worst-case disruptions Goal: To provide insight on physical vulnerabilities and protective plans that proactively hedge against disruption caused by terrorist attacks Our Approach

7  In order to better defend the electric grid it is valuable to understand how to attack it! -Optimal power flow model (minimizing load shedding) -Interdiction model (maximize disruption)  Additional features of the problem are: -Time scale: Very short-, short-, medium- and long-term -Customer types; ability to “share the pain” -Uncertainty about terrorist resources -Assumptions on protection resources Mathematical Analysis of the Problem

8 DC-OPF: i: bus,l: line,g: generator,c: customer sector P Line, P Gen : power (MW)S: power shed  : bus phase Power Flow Model (DC Approx.) s.t.

9 I-DC-OPF: Etc... Where: DC-OPF Interdiction Model s.t. after interdiction

10 Solve the DC-OPF Power Flow Model given the current grid configuration Based on the current and previous flow patterns, assign a “Value” (V) to each interdictable asset Interdict the assets that maximize “Total Value” Heuristic

11 Exact Linearization of the Model

12 Salmeron, Wood and Baldick (2004), IEEE Transactions on Power Systems Interdiction resource: 6 terrorists Line x1 Single transformer x2 Bus or substation x3 Total load: 2,850 MW Load shedding: 1,258 MW Load shedding: 1,373 MW IEEE Reliability Test System 96-99

13 Salmeron, Wood and Baldick (2004), IEEE Transactions on Power Systems Load: 5,700 MW 12 terrorists Shedding: 2,516 MW IEEE Reliability Test System 96-99

14 t (Attack) MW shedding One to several days No repair Days to one week Lines Trafos with spares >1 months System Restoration Weeks Slow repair 7683YESSubstations N/A NOGenerators 3603YESBuses 7682YESTransformers N/A NOLines (underground) 721YESLines (overhead) Outage Duration (h) Resources M (no. of terrorists) InterdictableGrid Component E.g.:

15 Salmeron, Wood and Baldick (2004), IEEE Transactions on Power Systems Total Load: 2,850 MW 2 t MW +72h Attack h IEEE Reliability Test System Substation Protected Substation Protected h

16 Results for the Linearized MIP Case/AlgorithmDirectly Interdicted ComponentsTime Period Power Shed (MW) Energy Shed (MWh) RTS-Two-Areas (M=24) HEURISTIC Buses: 116, 118, 215, 218 Substations: Sub-A1, Sub-A2, Sub-B1, Sub- B h2,693969, h1,416577,728 Total: 1,547,208 RTS-Two-Areas (M=24) MIP Lines: A30, A33-2 Transformers: A7, B7 Buses: 115, 118, 215, 218 Substations: Sub-A2, Sub-B h3,164227, h2,716782, h1,416577,728 Total: 1,587,744 Case/AlgorithmDirectly Interdicted ComponentsTime Period Power Shed (MW) Energy Shed (MWh) RTS-Two- Areas (M=12) HEURISTIC Substations: Sub-A1, Sub-A2, Sub-B1, Sub- B ,4161,087,488 Total: 1,087,488 RTS-Two- Areas (M=12) MIP Lines: A23, B23 Transformers: A7, B7 Substations: Sub-A2, Sub-B h1,804129, h1,416985,536 Total: 1,115,424