NLC - The Next Linear Collider Project Leif Eriksson 10/11/99 NLC BD VACUUM Thermal Outgassing Rate for Various Beam Line Materials.

Slides:



Advertisements
Similar presentations
Investigation of the Catalytic Activity of Plasma-Treated Fe, Ni, and Co Foil for Water Splitting Nick Lavrov, Olivia Watson.
Advertisements

Vacuum System Design Considerations Materials Plumbing –Pumping –Throughput Ultimate pressure –Dynamic equilibrium –Pumping speed –Leaks.
8 th January, 2007 European Linear Collider Workshop, DL, UK ILC DR Vacuum System Progress in ECLOUD Task (Goal 7) for the ILC DR Dr. Oleg B. Malyshev.
Vacuum Fundamentals High-Vacuum Technology Course Week 8 Paul Nash HE Subject Leader (Engineering)
High-Vacuum Technology Course
Center for Materials for Information Technology an NSF Materials Science and Engineering Center Vacuum Fundamentals Lecture 5 G.J. Mankey
Position [ mm ] Wire Current [ uA ] Results For the 1 mm solid wires, tungsten with the highest melting.
1 NEG films: recent R&D progress Paolo Chiggiato (for the EST-SM-DA section) Vacuum Issues of the LHCb Vertex Detector 28 November NEG films: choice.
Vacuum System Presented by Dong Haiyi Accelerator Center,IHEP,China April 27, 2006.
Vacuum Technology Need for Vacuum Environment
Al-Li 2000 series alloy out gassing Studies at IIT N. Solomey, Physics Division Philippe Nash, Material Science Division 21 Feb
Holger Kollmus - VBE-UHV 1 SIS100_1 ERDA Measurements ERDA – Measurements: Understanding of Ion Beam-Loss Induced Desorption.
NLC Beam Delivery Area Engineering: Vacuum System Cost Model Presentation by Leif Eriksson, 02/09/99.
Basics of Vacuum Technology Unit: Pa = N/m 2 = J/m 3 UnitPa or N/m 2 bar10 5 mbar100 atm= 760 torr x 10 5.
11/04/98Leif Eriksson NLC Beam Delivery Systems Engineering Three topics for my talk: 1. Vacuum System 2. Facilities 3. WBS.
Thin Film Deposition Prof. Dr. Ir. Djoko Hartanto MSc
BISMV & H 0 -H - PSB INJECTION VACUUM REQUIREMENTS LIU - PSB meeting 29th October 2012 C. Pasquino, P. Chiggiato, J. Hansen.
H 0 -H - PSB INJECTION VACUUM REQUIREMENTS C. Pasquino, P. Chiggiato, J. Hansen PSB - H0-H- injection review meeting, 18th April 2013.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
Pressure 1 atmosphere ~ 1 bar ~ 760 mm Hg ~ 760 torr ~ 100,000 Pa Ion gauges read in mbar i.e. 1x mbar = 1x atm. Sometimes ion gauges read.
Solar Cell conductive grid and back contact
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
Chemistry Notes.
26-28 August 2008 Final EUROTeV Scientific Workshop, Uppsala University, Sweden 1 ILC DR vacuum system related problems and solutions Oleg B. Malyshev.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
Methods in Surface Physics Experimentation in Ultra-High Vacuum Environments Hasan Khan (University of Rochester), Dr. Meng-Fan Luo (National Central University)
20-21 January 2009, RAL Joint DL-RAL Accelerator Workshop 1 INVESTIGATION OF NON- EVAPORABLE GETTER FILMS O. B. Malyshev, K.J. Middleman, A. Hannah and.
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
PHYSICS 225, 2 ND YEAR LAB VACUUM TECHNOLOGY G.F. West Thurs, Jan. 12.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
Vacuum Fundamentals High-Vacuum Technology Course Week 6 Paul Nash HE Subject Leader (Engineering)
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
Summary of Working Group II – Chamber Coating and Treatment Participants: Michel ChanelCERN Ping HeBNL Dick Hseuh BNL Roberto KersevanESRF Yulin LiCornell.
E. Hedlund Uppsala University, Sweden
Center for Materials for Information Technology an NSF Materials Science and Engineering Center Vacuum Systems Lecture 6 G.J. Mankey
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
2009/1/16-18 ILD09 Seoul 1 Notes for ILD Beam Pipe (Technical Aspect) Y. Suetsugu, KEK Parasitic loss Vacuum pressure profile Some comments for beam pipe.
F. Le Pimpec 1 How DID they make light bulb work ? Bulb Installed in 1901 at the Livermore’s (CA) Fire station. C filament - 4 W ♦ Since 1800 the electric.
Accelerator Design: the nuts and bolts…and gaskets and resistors Elvin Harms Beams Division/Fermilab
ME 414 Thermal&Fluid Systems Design Heat Exchanger Design ME 414 Thermal / Fluid System Design William Donelson Josh Fosso Laurie Klank Jonathan Moore.
Solar Cells need a top side conductor to collect the current generated They also need a conductive film on the backside.
1 Vacuum chambers for LHC LSS TS Workshop 2004 Pedro Costa Pinto TS department, MME group Surface Characterization & Coatings Section.
September 17-21, 2007Workshop on ILC Interaction Region Engineering Design, SLAC IR Vacuum Systems first thoughts Oleg Malyshev ASTeC, STFC Daresbury Laboratory.
Vacuum Fundamentals Top Down Method Vacuum Technology Basics Author’s Note: Significant portions of this work have been reproduced and/or adapted with.
1 Teaching Innovation - Entrepreneurial - Global The Centre for Technology enabled Teaching & Learning, N Y S S, India DTEL DTEL (Department for Technology.
2-D Nanostructure Synthesis (Making THIN FILMS!)
Outgassing Test and the Getter Specification
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
Vacuum for DTL G.Vandoni on behalf of the TE/VSC Linac4 team 13 September, 2011G.Vandoni, TE-VSC1 Acknowledgements M.Malabaila, J.Hansen, A.Mongelluzzo,
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
Vacuum Technology and Components for Cryogenics
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
Mg Films Grown by Pulsed Laser Deposition as Photocathodes: QE and surface adsorbates L. Cultrera INFN – National Laboratories of Frascati.
Vacuum System P. Chiggiato TE-VSC
INVESTIGATION OF NON-EVAPORABLE GETTER FILMS
Electrostatic deflector development at RWTH Aachen
Jari Koskinen, Sami Franssila
Vacuum Problems in the ILC Damping Ring
Cornell ERL Prototype Injector DC Photocathode Gun Design Review Vacuum Systems Yulin Li, January 5th– 6th, /5-6/2011 Cornell Gun Review.
RTML Vacuum System RDR Summary FermiLab October 24, 2007
CEPC Vacuum System Dong Haiyi 2017/11/5.
Thermal Outgassing Rate for Various Beam Line Materials
-Honors Thesis Defense- In Situ Ellipsometry of Surfaces in an Ultrahigh Vacuum Thin Film Deposition Chamber Joseph Choi Department of Physics and Astronomy,
Hydrogen and Ultra-High Vacuum
Epitaxial Deposition
Vacuum in LER and HER. First estimation for the pumping system requirements A.Variola for B.Mercier, C.Prevost, F.Letellier.
Table 3. Main properties of the thin brass electrode
Presentation transcript:

NLC - The Next Linear Collider Project Leif Eriksson 10/11/99 NLC BD VACUUM Thermal Outgassing Rate for Various Beam Line Materials

Leif Eriksson 10/11/ NLC - The Next Linear Collider Project Introduction -1 The main parameters in designing a vacuum system are: –Conductance –12.3 (D 3 /L)[l/s] –Outgassing –Q TOT =(D  Q)/L[Torr l -1 cm -2 ] –Pumping speed –S=Q/P[l s -1 ] –Desired pressure [Torr] Other decision criteria for choosing an UV or UHV material for particle accelerators: –Electrical conductivity –MPS considerations –Cost –Ease of machining

Leif Eriksson 10/11/ NLC - The Next Linear Collider Project Introduction - 2 The physics driven parameters are: –Conductance, (beam line I.D) –Desired pressure –Electrical conductivity –MPS considerations Engineering driven parameters are: –Cost –Ease of machining –Outgassing –Pumping speed The driving engineering parameter for vacuum design is the outgassing rate. It will determine choice of material.

Leif Eriksson 10/11/ NLC - The Next Linear Collider Project Thermal outgassing rate - 1 Through trial and error a handful of vacuum materials have evolved as being suitable for UV and UHV applications. –Stainless steel –Copper –Aluminum –Glass –Ceramics They all have one thing in common, a low thermal outgassing rate. The origin of the thermal outgassing rate is: –Hydrogen trapped in the molecular structure of the material and from decomposition of water vapor. Other sources of thermal outgassing are: –Surface contamination from lack of proper cleaning –Gases trapped on the material surface such as CO and CO 2 –Virtual leaks –Design

Leif Eriksson 10/11/ NLC - The Next Linear Collider Project Thermal outgassing rate - 2 The “other” sources of outgassing for the various UV and UHV materials are dealt with through: –Surface contamination - Refined Cleaning Methods –Water Vapor - Outgassing –CO and CO 2 - Glow Discharge, Electron Bombardment –Virtual Leaks - Engineering –Design - Engineering Typical thermal outgassing rates for various materials: Stainless Steel: –For stainless steel the outgassing is small. An accepted value for baked and cleaned, 304 or 316 stainless steel is 1.0E-12 torr liter s -1 cm -2. (Source: AVS) Copper: – Comparable to stainless steel as far as the outgassing rate goes.

Leif Eriksson 10/11/ NLC - The Next Linear Collider Project Thermal outgassing rate - 3 Non-metallic materials –Hydrogen outgassing rate is not an issue. Aluminum: – The accepted outgassing rate for aluminum at SLAC is 5.0E- 11 Torr liter s -1 cm -2. This value is based recent PEP-2 experiences. (Source: Private conversations with Dan Wright and Julia Weinberg) How does the value hold up to other measured values of the thermal outgassing rate for aluminum? –1. Hajime Ishimaru, KEK, measured a thermal outgassing rate of E-13 Torr l s -1 cm -2 on an, “EX” processed, UHV cleaned and baked system. E-10 Torr l s -1 cm -2 before bakeout. “EX” process: AL part dipped in sodium hydroxide, rinsed in de-mineralized water, thermally processed in an oxygen/argon atmosphere for 24 hr’s, the water forms an hydroxide layer which is transformed in to a thin oxide layer during the thermal treatment. [ Source; AVS Series 8, ISBN p. 139 ]

Leif Eriksson 10/11/ NLC - The Next Linear Collider Project Thermal outgassing rates for SLC ARC’s

Leif Eriksson 10/11/ NLC - The Next Linear Collider Project Effects of thermal outgassing rate - 1

Leif Eriksson 10/11/ NLC - The Next Linear Collider Project Effects of thermal outgassing rate - 2 Two identical vacuum systems, one of stainless steel, one of aluminum, will not achieve the same base pressure. The aluminum system will always be approximately two orders of magnitude higher in pressure than a stainless system. If the thermal outgassing rate on aluminum could be lowered, it would be close to an ideal beam line material. What are the main ways to lower the thermal outgassing rate? –Cleaning –Bake out –Coating of inner vacuum chamber surface –Cooling the vacuum chamber

Leif Eriksson 10/11/ NLC - The Next Linear Collider Project If we were to use Aluminum... The beam line aperture must be maximized. Provide for in situ bake out Consider a design with an ante chamber to maximize pumping speed. Re-evaluate the current pressure specifications for Collimation and Big Bend. What to do next? –Determine the exact vacuum specification for NLC BD. –Discuss maximizing beam line aperture. –Quantify MPS specification –Quantify “Electrical” properties. –Do a cost evaluation of Aluminum alternative. –Investigate the consequences of a cooled beam line.