KERN RIVER GAS TRANSMISSION COMPANY Wyoming Pipeline Authority Casper, Wyoming August 21, 2007 John Dushinske Vice President of Marketing & Regulatory.

Slides:



Advertisements
Similar presentations
Transwestern Pipeline
Advertisements

2009 Generators that have Achieved Certification Arizona Public Service Company ATCO Electric Ltd. Avista Corporation Basin Electric Power Company Black.
Available Capacity to Serve AZ
Arizona Corporation Commission Summer Peak 2000 Preparedness Workshop May 17,
WESTERN ENERGY INFRASTRUCTURE ASSESSMENT Energy Infrastructure Policy Group Office of Energy Projects Docket No. AD Item A-3 July 23, 2003.
ACC Workshop Regarding Notice of Inquiry on Natural Gas Infrastructure September 10, 2003.
1 AEC October 31, To Chicago Western U.S. Gas Grid Northern Border Kern PGT Northwest El Paso CIG & WIC Trailblazer CIG KN Potential Connect to.
Wyoming Pipeline Authority October 2008 Sunstone Pipeline LLC.
February 22, 2001 Alaskan Pipeline Meeting Agenda Introduction to Enron & El Paso Assessing the Alaskan Gas Impact Enron & El Paso Value Added.
RB:UMT Arizona Corporation Commission Workshop on Natural Gas Infrastructure NOI February 13, 2004 Phoenix, Arizona.
2 Permian Basin Supply San Juan Basin Supply Washington Ranch Storage Waha Compressor Stations Gas Supplies Transport Flow Directions Pipelines Production.
Shelley A. Wright Wyoming Pipeline Authority January 27, 2004 Expansion Projects Update.
Bryan Hassler, Executive Director Western Energy Institute Domestic Supply Perspectives October 23, 2003 Las Vegas, NV.
Pivotal Development: Regions of Possibilities Dana Grams Senior Vice President, Pivotal Development.
1 Cheyenne Tuscola Lebanon Clarington Meeker Wamsutter Opal “Rockies Express Pipeline”
R Southwest Gas Corporation February 16, 2001 Southwest Gas Corporation Update on Factors Affecting Gas Prices n Storage u Storage levels continue below.
California Public Utilities Commission Regulation and Natural Gas Infrastructure Richard Myers CPUC Energy Division May 14, 2009.
Southern Star Central Gas Pipeline, Inc August 31, 2005.
Red Lake Gas Storage Project Update ACC Workshop Arizona Natural Gas Infrastructure February 2004.
Wyoming Pipeline Authority August 30, 2005 Gaylen Haag Business Development Questar Pipeline Company.
Wyoming Natural Gas Pipeline Authority “Moving Wyoming Gas to California” December 9, 2003 John R. Smith Director Regulatory and Governmental Affairs Mark.
© 2008 ICF International. All rights reserved. New York Gas Market Overview Based on NYSERDA Case 1 (n0908) March 2009 Contacts: Kevin R. Petak (
1 Questar Pipeline Current Capacity and Development Shelley A. Wright Director, Business Development May 15, 2007 Wyoming Pipeline Authority Meeting.
Rockies Alliance Pipeline Wyoming Pipeline Authority Meeting Casper, Wyoming October 21, 2008 Gaylen Haag.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective Wyoming Geological Association Conference Prepared: July 26,
Wyoming Pipeline Authority August 24, 2004 Mark C. MoenchJohn R. Smith Vice President and General Counsel Director, Regulatory and Governmental Affairs.
Midstream Business is in High Gear Enbridge Energy Partners Stephen JJ Letwin Houston Gas Processors Association May 2008 May 2008.
Kinder Morgan Silver Canyon Pipeline Kinder Morgan Silver Canyon Pipeline Business Overview ACC Workshop NOI February 13, 2004.
Intermountain West Production -- Getting Gas to Market Jim Cleary El Paso Western Pipelines IPAA Mid-Year Meeting June 14, 2004.
Southern Energy, Inc. “Natural Gas and Electricity: Looks Like a Good Marriage” Pamela S. Pierce IPAA Luncheon November 8, 2000 Houston, Texas.
Energy Action Plan Natural Gas Update California Public Utilities Commission California Energy Commission Randy Roesser December 8,
Michael Dirrane Director, Northeast Marketing NASUCA 2012 Annual Meeting November 13, 2012.
Page 0 WYOMING’S NATURAL GAS – At a Glance October 26, 2004.
Wyoming Pipeline Authority Public Meeting January 15, 2008 A Spectra Energy Proposal.
ENERGY REGULATORY AND MARKET DEVELOPMENT FORUM November 4, 2010 The Honorable Philip D. Moeller Commissioner Federal Energy Regulatory Commission “ENERGY.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
1 Legislative Session February 17, Proposed Legislative Changes Increase WPA bonding capacity from $1 billion to $3 billion Expand State Treasurer’s.
New Hampshire Energy Summit Rich Paglia President, Maritimes & Northeast Pipeline Vice President, Marketing New England Pipeline Expansion Update.
Arizona Corporation Commission Energy Workshop February 16, 2001.
Major Changes in Natural Gas Transportation Capacity, 1998 – 2008 Next  The following presentation was prepared to illustrate graphically the areas of.
Entrega Project Update Wyoming Natural Gas Pipeline Authority – August 30, 2005 Entrega Gas Pipeline Inc.
Bryan Hassler, Executive Director Society of Petroleum Engineers January 21, 2004 Rock Springs, WY.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Natural Resources Infrastructure Needs Colorado Oil and Gas Association Denver, CO August 9, 2006.
Natural Gas and Energy Reform Legislation Steve Crout Managing Director, Government Affairs American Gas Association.
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
BUFFALO POWER COMPANY July 22, Oregon Trail Energy Project Buffalo Power Company, LLC High Plains Transmission, LLC.
California Energy Commission Natural Gas Outlook IEPR Commissioner Workshop on 2015 Natural Gas Outlook Report Monday, September 21, 2015 Anthony Dixon.
California Energy Action Plan July 17, Energy Action Plan Natural Gas Actions Status Report David Maul California Energy Commission Staff And Richard.
Rocky Mountain Production and Pipeline Capacity 2004 BLM National Fluid Minerals Conference June 24, 2004.
California Gas System Overview
PacifiCorp and CAISO Expanding Regional Energy Partnerships
CEC Workshop January 24, 2003 January 24, 2003 Chris Price Market Development Wild Goose Storage Inc.
- DISCOVER THE DIFFERENCE - Florida’s Natural Energy - DISCOVER THE DIFFERENCE -
1 Supply, Demand, and Storage Overview West Gas Offsite September 10, 2001 Phil Polsky.
WEFA Inc. Northeast Natural Gas Market Outlook Ron Denhardt Vice President, WEFA Energy Services September.
1 Rockies Outlook For Internal Use Only April 12, 2001.
Ohio Gas Association 2016 Market Conditions Conference James Eckert Vice President, Commercial East.
Enron Transportation Services. AC_01_ETS -1 Enron Transportation Services Innovative…Creative…Safe…Reliable Strong Returns with Consistent Earnings and.
Exploring Pipeline Dynamics to Connect New Markets
Operations Directors Conference October 9, 2001
Northern Border Partners (11.8%)
Privileged and Confidential
Enron Corp. Board of Directors Presentation
California Energy Solutions Group
Supply, Demand, and Storage Overview
ALBUQUERQUE TEAM MEETING November 7, 2001
Presentation to the Enron Corp. Finance Committee
Natural Gas World Presentation T
Presentation transcript:

KERN RIVER GAS TRANSMISSION COMPANY Wyoming Pipeline Authority Casper, Wyoming August 21, 2007 John Dushinske Vice President of Marketing & Regulatory Affairs

KERN RIVER OVERVIEW  Based in Salt Lake City  1,680 miles  1.76 Bcf/d design capacity  Access to Rocky Mountain basins  Markets in Utah, Nevada and California

KERN RIVER SYSTEM Kern River original build  In-service February 1992  724,500 Dth/d California Action Plan / 2002 Expansion Projects  In-service July 2001/May 2002  124,500 Dth/d Kern River 2003 Expansion Project  In-service May 2003  906,626 Dth/d

SYSTEM ACCESSIBILITY System design capacity is 1.76 Bcf/d Average daily throughput in 2007 is Bcf Receipt point capacity is 5.45 Bcf/d  3 x system design capacity  2.5 Bcf/d of new receipt point capacity added since 2003 Expansion Project Delivery point capacity is 7.33 Bcf/d  4 x system design capacity  1.4 Bcf/d of new delivery point capacity added since 2003 Expansion Project

SUPPLY AREA INFRASTRUCTURE

SYSTEM UTILIZATION  Kern River ranked #2 in load factor of 28 major interstate pipelines (Source: Fosters Financial Reports)  Kern River ranked #4 out of 41 interstate pipelines in 2007 MastioGale Survey (Source: MastioGale) Percent

KEY MARKETS Power Generation  Since 2001, 8,000 MW directly connected to Kern River Peak load requirement of 1.55 Bcf/d  Service to another 18,000 MW behind local distribution companies Peak load requirement of 3.4 Bcf/d Local Distribution Companies  Kern River serves the Southern California Gas, Pacific Gas & Electric, and Southwest Gas natural gas utilities Daily average requirement of 5.16 Bcf

KEY MARKETS cont. Industrial  Kern River serves the enhanced oil recovery/cogeneration markets Daily average requirement of.480 Bcf Other Markets  Kern River serves the Phoenix market via El Paso’s Line 1903

POWER PLANTS In-service since 2001 PROJECTMW Sunrise (Edison Mission) 585 El Dorado (Sempra) 480 L.V. Cogen (Black Hills)280 West Valley (PacifiCorp)170 La Paloma (Complete Energy) 1,125 Apex (LS Power)550 High Desert (Tenaska)830 Silverhawk (Nevada Power)570 Bighorn (Reliant) 570 Pastoria (Calpine)750 Chuck Lenzie (Nevada Power)1,200 Harry Allen (Nevada Power) 160 NCA 1 & 2 (NV Cogen Ass.) 170 Lake Side (PacifiCorp) 535 TOTAL MW7, Power Plants and Interconnects KEY MARKETS cont. Mojave Pipeline Ehrenberg Phoenix El Paso South System Kramer Jct. (SoCalGas) Dag Moj (El Paso) Wheeler Ridge (SoCalGas) Daggett (PG&E)

Kern River is the largest transporter of natural gas to California, providing 26% of the average daily demand (Source: 2006 California Gas Report and California Energy Commission) Kern River Ranked #1 in growth over last five years of 28 major interstate pipelines (Source: Fosters Financial Reports) INCREASING MARKET SHARE IN CALIFORNIA

2010 EXPANSION PROJECT  Market signals are now strong to proceed with an expansion  Rockies gas supply will exceed export capacity  Anticipate rolling-in costs and utilizing the 2003 expansion rates

MARKET ASSESSMENT The expansion will be supported by:  Natural gas and electric utilities  Merchant power generators  Rocky Mountain natural gas producers

SIGNALS ARE STRONG  Core market demand is growing in states served by Kern River – 360,000 Dth/d by 2010  Markets seeking supply diversity  9,200 MW in development – 1.78 Bcf/d peak load  Power plants lacking firm transportation capacity. 2,500 MW –.420 Bcf/d peak load  Rocky Mountain production is projected to outpace export pipeline capacity  Limited availability of LNG supply

CALIFORNIA UTILITIES’ DISTRIBUTION OF INTERSTATE PIPELINE CAPACITY Rockies Permian / San Juan Canadian

PRODUCTION WILL EXCEED REGIONAL DEMAND AND EXPORT CAPACITY Source:Lippman Consulting, Inc., “Forecast Model,” July 17, 2007; “Rocky Mountain Average Regional Demand 2006,” April 2007; and “Rocky Mountain Region Export Capacity Report,” May 2007.

MARKETING CAMPAIGN  Rationalize 94,000 Dth/d of available capacity and any unwanted shipper capacity  Solicit shipper support for MMcf/d of incremental expansion capacity  Seek agency support for utilities to enter into long-term contracts  Finalize precedent agreements by mid-March 2008

2010 EXPANSION PROJECT OVERVIEW  Economically expand between 200 and 500 MMcf/d  Close the Las Vegas and North Salt Lake loops  Incremental compression  Requires long-term commitments  Open Season – Fall 2007  In-service – Fall 2010 Compressors Original Mainline 2003 Loop Line Salt Lake City Opal Las Vegas Bakersfield Los Angeles Salt Lake City Loops

KERN RIVER PROVIDING MARKET ACCESS TO ROCKIES PRODUCTION

Questions?