Air Quality Division Tank Degassing and Cleaning Rules; TSH :May 15, 2008 Page 1 Changes to Tank Degassing and Cleaning Rules Texas Association of Environmental.

Slides:



Advertisements
Similar presentations
Monitoring Equipment and Detection Devices Chapter 14.
Advertisements

Regulations (Standards - 29 CFR) Flammable and Combustible liquids
SOLARIS 3-GAS METER Complete operation of Solaris multi-gas meter can be found on the LAFD Ethernet.
Railroad Commission of Texas Statewide Rule 32 and Flaring/Venting of Produced Gas Travis Baer, District 01 Engineering Specialist August 2014.
Anne M. Inman, P.E. Air Permits Division September 11, 2012.
Page | 1 Confined Space Entry. Page | 2 Definition of a Confined Space Is large enough and so configured that an employee can bodily enter and perform.
2. Describing the flow of air inside a duct.
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
MON MACT Storage Tank & Transfer Racks Presenter: James Leonard November 5, 2003 ACC/SOCMA Conference New Orleans, LA.
How would you explain this on the 3394? If Fire Erupts on YOUR Boat If Underway, stop the boat Have everyone who is not wearing a PFD put one on Position.
Garry Kaufman Deputy Director Colorado Air Pollution Control Division June 6, 2014.
Fresh Air Consulting Norman L. Morrow, Ph.D. November 5, 2003 MON Continuous PV Requirements.
Texas Commission on Environmental Quality (TCEQ) Differential Absorbtion Lidar (DIAL) Project Summer 2007 Texas City, Texas.
§ Planned Maintenance, Startup, and Shutdown (MSS) at Oil and Gas Handling and Production Facilities.
STORAGE OF SOLVENTS/GASES. Storage of Solvent Common Solvents : – Acetone, Acrylamide, Benzene, Methanol, Toluene, etc. Solvent Properties: – High volatility.
Proposed Amendments to Rule – Emissions from Gaseous- and Liquid- Fueled Internal Combustion Engines Presented at Southern California Gas Co. Seminar.
Natural Gas Odorization Transmitted by the expert from JAPAN SGS January, 2008 Hydrogen and Fuel Cell Vehicles GTR (HFCV): 2nd Meeting of the.
PREPARED BY: NATIONAL STEPS NIOSH OSHA OIL & GAS INDUSTRY REPRESENTATIVES Tank Gauging Hazard Alert Gauging, Thieving, Fluid Handling.
35” CONDENSING GAS FURNACES Vent and Combustion Air System Design & Installation 1 Add Distributor Art and Text Here.
Highlights of Colorado’s New Oil and Gas Hydrocarbon Emission Reduction Rules - Adopted February 2014 Presentation to WESTAR May 2014 Will Allison Colorado.
Air Monitoring Presented By: Etech Environmental & Safety Solutions, Inc.
Efficient Pigging of Gathering Lines
Delivering LNG to remote sites to service pipeline interrupts on a temporary basis.
New Template of Environmental Compliance Approval with Limited Operational Flexibility Environmental Approvals Branch Presented to Air Practitioners’ Group.
Flammable and Combustible Liquids. Flammable liquids Class I - liquids have flashpoints below 100 degrees F, with vapor pressures not exceeding 40 psia.
1 When entering a confined space Before and during normal working in a Process or Hydrocarbon Area When breaking containment on a process system When hot.
Pat Bennett Engineering Evaluation Section Monitoring and Laboratory Division California Air Resources Board AST EVR WORKGROUP MEETING July 23, 2002.
Copyright © Flammable & Combustible Liquids.
© Copyright, Yorke Engineering, LLC 2008 SCAQMD Rule Compliance Steps and Strategies Judy Yorke and Bipul K. Saraf Yorke Engineering, LLC
VOC and NO x Rules Related to the Oil and Natural Gas Industries Air Quality Division Bob Gifford Air Quality Specialist, Air Quality Division Presented.
Patrick Thornton, SNS/FPE June 9, 2008
New Air Quality Regulation “NSPS OOOO” Oil and Natural Gas Industry Workshop October 24, 2012 Robert Keatley, PE Senior Engineer/Supervisor DEP – Division.
1 BUILDING TRADE SAFETY CONFINED SPACES. 2 BUILDING TRADE SAFETY Confined spaces.
WELCOME TO Gas Tester Training O2, LEL Monitoring
PAS-Intro1 Dated 24th Aug Copyright © Siemens AG 1999 All Rights Reserved Siemens Advanced Engineering Pte Ltd Process Analytical Services Division.
Nanotechnology Metal Oxide Semiconductor (NTMOS) H2S Gas Sensor
Without reference, identify principles about volume/pressure and high frequency ventilators with at least 70 percent accuracy.
The Basics of Formaldehyde: What You Need to Know.
Blue Skies Delaware; Clean Air for Life DNREC Air Quality Management Air Permitting Seminar Natural Minor Permitting.
MSA Five Star 4-Gas Monitor Air Monitoring Instrumentation.
Your Challenge 1)Use the SCORE CARD provided as a guide to the presentation. 2)Make an honest evaluation of your understanding of the topics discussed.
Hazardous Materials Subpart H. Subpart H Standards Compressed Gases Acetylene Hydrogen Oxygen Nitrous Oxide Flammable.
MRWS GROUND WATER RULE (GWR) PREPARED BY JOHN CAMDEN MRWS GROUND WATER TECH
Explosion An explosion is a rapid expansion of gases resulting in a rapid moving pressure or shock wave. The expansion can be mechanical or it can be.
INTERTANKO International Association of Independent Tanker Owners Safe Transport, Cleaner Seas, Free Competition The Control of Volatile Organic Compounds.
Area Source Emissions Inventory Improvement Update Michael Ege, Emissions Inventory Specialist Air Quality Division Texas Commission on Environmental Quality.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Control of Emissions of Sulfur Dioxide – LAC 33:III.Chapter 15 Dustin Duhon Air Permits Division Louisiana Department of Environmental Quality March 23,
Emissions Banking and Trading (EBT) Overview/Update Melissa Ruano Air Quality Division Texas Commission on Environmental Quality Advanced Air Permitting.
Analytical Laboratories - Potential and Restricted Emissions Kevin Tyson, Air Quality Analyst Wednesday, December 10, 2014.
Portable Fuel Container Spillage Control Project Monitoring and Laboratory Division June 28, 1999 California Environmental Protection Agency Air Resources.
Emission source sampling and monitoring Topic 6 Ms Sherina Kamal May
§ Planned Maintenance, Startup, and Shutdown (MSS) at Oil and Gas Handling and Production Facilities.
Engineering Evaluation Unit Monitoring and Laboratory Division California Air Resources Board (916) ABOVE GROUND STORAGE TANK (AST) VAPOR RECOVERY.
Structure Gas Monitoring Requirements in 27 CCR Glenn K. Young, P.E. Senior Waste Management Engineer Closed Illegal & Abandoned Sites.
2012 Emissions Inventory Workshop 1. 2  The owner or operator of any facility that is a source of air contaminants shall submit a complete emission.
Garry Kaufman Air Pollution Control Division.  Background on Oil and Gas Air Regulation in Colorado  Basis for Additional Air Quality Requirements for.
Emissions Events Cynthia Gandee, Air Program Liaison Office of Compliance and Enforcement Program Support Section Austin Jon Williams, Work Leader Office.
3.0 Comprehensive Performance Audit Fossil Fuel Appliances Health & Safety 3.2.
Standards Certification Education & Training Publishing Conferences & Exhibits Expanding LDAR Technology to Tank Vents and Compressor Seals Michael Webb,
Concepts for Proposed General Permit for Well Pads and Proposed GP-5 Modifications Citizens Advisory Council March 15, Tom Wolf, Governor John Quigley,
Misuse of Combustible Gas Meters Supervisor Training 1/11/08.
These materials have been developed based on applicable federal laws and regulations in place at the time the materials were created. The program is being.
Atmospheric Monitoring. ATMOSPHERIC MONITORING INSTRUCTIONAL GOAL The participant will understand the need for atmospheric monitoring and the types, uses,
RACT 2 – Source Testing and Monitoring Requirements Air Quality Technical Advisory Committee August 4, 2016 Harrisburg, PA Tom Wolf, GovernorPatrick McDonnell,
Veeder-Root Company Presents: EPA Compliance Basics Presenters: Bill Tobias, Director of Sales, Veeder-Root Carlton Knowles, Territory Sales Manager, Veeder-Root.
Complying with Periodic Emissions Monitoring Requirements
NEW COMPLIANCE REGULATIONS
Flammable & Combustible Liquids
Leaky Appliance Trigger Rate
Presentation transcript:

Air Quality Division Tank Degassing and Cleaning Rules; TSH :May 15, 2008 Page 1 Changes to Tank Degassing and Cleaning Rules Texas Association of Environmental Professionals Air Quality Division Teresa Hurley, P.E. May 15, 2008

Air Quality Division Tank Degassing and Cleaning Rules; TSH :May 15, 2008 Page 2 Tank Degassing and Cleaning Rules What are the current requirements? Why were the rules changed? What changed? When do changes take effect? Questions

Air Quality Division Tank Degassing and Cleaning Rules; TSH :May 15, 2008 Page 3 What are the current requirements? 30 TAC Chapter 115 Subchapter F Division 3: Degassing or Cleaning of Stationary, Marine, or Transport Vessels Applicability: –Stationary tanks with capacity ≥ one million gallons –Transport vessels with capacity ≥ 8,000 gallons –Marine vessels with capacity ≥ 420,000 gallons –Vapor space partial pressure ≥ 0.5 psia

Air Quality Division Tank Degassing and Cleaning Rules; TSH :May 15, 2008 Page 4 What are the current requirements? Control Requirements: –90% control of vapors –No avoidable leaks –Must use vapor-tight connections –No intentional bypass of vapor control device

Air Quality Division Tank Degassing and Cleaning Rules; TSH :May 15, 2008 Page 5 What are the current requirements? Vapors must be routed to control device until: –Partial vapor pressure < 0.5 psia; 19,000 ppm by weight; 34,000 ppm by volume as methane; OR –Turnover of at least four vapor space volumes has occurred Vapors can be vented to the atmosphere after any of the above conditions is satisfied

Air Quality Division Tank Degassing and Cleaning Rules; TSH :May 15, 2008 Page 6 Why were the rules changed? Studies have indicated that VOC emissions in HGB area are under-reported in emissions inventories. Remote sensing study results have indicated that degassing emissions are under-reported. Rule changes were made to reduce the previously under-reported emissions.

Air Quality Division Tank Degassing and Cleaning Rules; TSH :May 15, 2008 Page 7 What changed? Eliminated “four turnover” condition for allowing vent to atmosphere –Confusion over measurement: must be volume passing through tank vapor space; not measured after combustion control –Does not account for presence of residual liquid in the tank

Air Quality Division Tank Degassing and Cleaning Rules; TSH :May 15, 2008 Page 8 Floating Roof Tank - Drain Dry Source: API, 2004

Air Quality Division Tank Degassing and Cleaning Rules; TSH :May 15, 2008 Page 9 Floating Roof Tank with a Liquid Heel Source: API, 2004

Air Quality Division Tank Degassing and Cleaning Rules; TSH :May 15, 2008 Page 10 What changed? Control degassing vapors until –VOC concentration of vapors ≤ 34,000 ppmv as methane, or –< 50% of lower explosive limit

Air Quality Division Tank Degassing and Cleaning Rules; TSH :May 15, 2008 Page 11 What changed? Monitor VOC concentration of degassing vapors according to (11) –Allow flexibility in monitoring methods –Maintain records to demonstrate that method works for compounds present

Air Quality Division Tank Degassing and Cleaning Rules; TSH :May 15, 2008 Page 12 What changed? Specified monitoring methods: –Test Method 21 (40 CFR Part 60, Appendix A) –Test Method 18 (40 CFR Part 60, Appendix A) –Bag samples –Test Method 25A (40 CFR Part 60, Appendix A) –Portable hydrocarbon gas analyzer using appropriate detector –Lower explosive limit detector calibrated and maintained according to manufacturer's specifications

Air Quality Division Tank Degassing and Cleaning Rules; TSH :May 15, 2008 Page 13 What changed? Monitoring must continue while vapors are vented to atmosphere: –At least once every 12 hours if ventilation is continuous –If ventilation ceases for more than 4 hours, concentration must be rechecked before venting to atmosphere –Monitoring can be discontinued after five consecutive readings less than 34,000 ppmv or 50% of LEL

Air Quality Division Tank Degassing and Cleaning Rules; TSH :May 15, 2008 Page 14 What changed? Require control of vapors for smaller tanks: –Capacity ≥ 250,000 with vapor pressure ≥ 0.5 psia –Capacity ≥ 75,000 with vapor pressure > 2.6 psia

Air Quality Division Tank Degassing and Cleaning Rules; TSH :May 15, 2008 Page 15 When do changes take effect? Compliance date for new requirements is January 1, 2009

Air Quality Division Tank Degassing and Cleaning Rules; TSH :May 15, 2008 Page 16 For more information Teresa S. Hurley, P.E. TCEQ Air Quality Planning Section