Environmental Risk Management Teaching material and methods Yiannis Xenidis, Lecturer Department of Civil Engineering Faculty of Engineering, Aristotle.

Slides:



Advertisements
Similar presentations
DAPPOLONIA S.p.A Tsunami Early Warning System Info Day UNESCO/IOC, Paris 31 January 2006.
Advertisements

Panel discussion on the future of software in support of microbial risk assessment.
Project Management Gaafar 2007 / 1 This Presentation is uses information from PMBOK Guide 2000 Project Management Risk Management* Dr. Lotfi Gaafar.
RESEARCH METHODOLOGY, AS OFFERED BY THE FACULTY OF AGRICULTURE, Jomo Kenyatta University of Agriculture and Technology Professor F.K. Lenga (PhD), Dean,
Tools Dr. Saeed Shiry Amirkabir University of Technology Computer Engineering & Information Technology Department.
CHAPTER 7 MAKING DECISIONS. MANAGEMENT IN ACTION: DECISION-MAKING n Defined as u process of u identifying problems/opportunities u developing alternative.
COMP8130 and COMP4130 Adrian Marshall Verification and Validation Risk Management Adrian Marshall.
Project Risk Management
Assessment Data Brigham Young University Department of Civil and Environmental Engineering W. Spencer Guthrie August 31, 2006 Brigham Young University.
Proprietary and confidential. © 2006 Perot Systems. All rights reserved. All registered trademarks are the property of their respective owners.
Managing Project Risk.
© Prentice Hall, © Prentice Hall, ObjectivesObjectives 1.A fundamental understanding of the term decision 2.An understanding of.
Project Risk Management EECS811: IT Project Management Presenter: Gavaskar Ramanathan.
Multidisciplinary Research Methods Training Professor Linda A Lawton Graduate School Leader & Director of PgCert Research Methods.
Decision analysis and Risk Management course in Kuopio
Lecture(12) Risk & Uncertainty Definition “Risk” and “uncertainty” are two terms basic to any decision making framework. Risk can be defined.
6 th semester Course Instructor: Kia Karavas.  What is educational evaluation? Why, what and how can we evaluate? How do we evaluate student learning?
R-1 Project Risk Management. R-2  Qualitative Risk Analysis  Quantitative Risk Analysis  Risk Response Planning  Sticky note technique  Risk matrix.
PMI Knowledge Areas Risk Management.
RISK MANAGEMENT PRESENTATION ASQ- GREATER HOUSTON SECTION 1405 Lila Carden, Ph.D., MBA, PMP University of Houston Instructional Associate Professor
Mark Piekarz, Ian Jenkins and Peter Mills
BSBPMG508A Manage Project Risk 11.4 Perform Quantitative Risk Analysis Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control.
WHAT IS SYSTEM SAFETY? The field of safety analysis in which systems are evaluated using a number of different techniques to improve safety. There are.
Project Risk Management
Quick Recap Monitoring and Controlling. Phases of Quality Assurance Acceptance sampling Process control Continuous improvement Inspection before/after.
Chapter 8 Managing Project Risk Copyright 2012 John Wiley & Sons, Inc. 8-1.
Research Methods1 Introduction Introduction to Research Course Content Assessment.
IT Project Management, Third Edition Chapter 11 1 Chapter 6: Project Risk Management.
Graduation Project Report Reducing Safety Risks at the Palestinian Stone and Marble Industrial Sector 1 Group Members: Ahmad Ghanayem Nabeel Khaleeliya.
Value of information Marko Tainio Decision analysis and Risk Management course in Kuopio
QUALITY RISK MANAGEMENT RASHID MAHMOOD MSc. Analytical Chemistry MS in Total Quality Management Senior Manager Quality Assurance Nabiqasim Group of Industries.
9 th Workshop on European Collaboration for Higher Education and Research in Nuclear Engineering & Radiological Protection Salamanca, Spain 5-7 June 2013.
“Everything is sweetened by risk.” Alexander Smith (1830–1867)
Session 9 & 10. Definition of risk assessment and pre condition for risk assessment Establishment of clear, consistent agency objectives. Risk assessment.
MBAA 607- Operations Analysis & Decision Support Systems Spring 2008 Tuesday 4:25-7:05 Dr. Linda Leon.
MBAA 607- Operations Analysis & Decision Support Systems Spring 2011 Monday 4:25-7:05 Dr. Linda Leon
Agenda Interthink – 2003 Organizational Project Management Baseline Study –Industry Profile –Country Profile –Organization Size –Data On Schedule –Data.
PMP Study Guide Chapter 6: Risk Planning. Chapter 6 Risk Planning Planning for Risks Plan Risk Management Identifying Potential Risk Analyzing Risks Using.
SOFTWARE PROJECT MANAGEMENT
© 2008 Prentice Hall9-1 Introduction to Project Management Chapter 9 Managing Project Risk Information Systems Project Management: A Process and Team Approach,
Teaching Business Information Systems in UK Courses in BIS Structure and Content Teaching and Assessment Questions… … but no answers TempusJan03_1.
Introduction to Project Management Chapter 9 Managing Project Risk
RLV Reliability Analysis Guidelines Terry Hardy AST-300/Systems Engineering and Training Division October 26, 2004.
Project Risk Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 3 rd Edition, Project Management.
SUPPLEMENT TO CHAPTER TWO Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 DECISION MAKING 2S-1 Chapter 2 Supplement Decision Making.
1 Risk Based Project Management VPC/PDP Fiduciary Forum 29 de Abril – 3 de Mayo New York Avenue, Washington, DC Teléfono (202)
Draft EU Risk Assessment and Mapping Guidelines for Disaster Management 8th Meeting of Working Group F on Floods October 2010 Commission ECHO.C4.
Accreditation of study programs at the Faculty of information technologies Tempus SMGR BE ESABIH EU standards for accreditation of study.
Lecture 7: Project Risk Management Murodullo Bazarov November 2, 2015.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Risk Assessment Techniques
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall Copyright © 2014 Pearson Education, Inc. 8-1 Making Decisions 8.
Chapter—7 Decision-Making.
PMP Study Guide Chapter 6: Risk Planning (Unit 8).
Decision Making Reading: pp. 134 – 139.
Accounting 9706.
Risk Management.
Risk Assessment Considerations
Accounting (Foundation)
Chapter 11: Project Risk Management
Managing Project Risk Chapter 8 Copyright 2012 John Wiley & Sons, Inc.
CHAPTER11 Project Risk Management
Project Risk Management
PMI North Area PMP Exam Study Group
Risk Management Process & Procedures
بسم الله الرحمن الرحیم.
Mumtaz Ali Rajput +92 – SOFTWARE PROJECTMANAGMENT Mumtaz Ali Rajput +92 –
Planning and organising Two Risk Management Introduction
Project Risk Management
Program & Project Risks and Reporting with Oracle Primavera Cloud
Presentation transcript:

Environmental Risk Management Teaching material and methods Yiannis Xenidis, Lecturer Department of Civil Engineering Faculty of Engineering, Aristotle University of Thessaloniki, Thessaloniki, Greece Aristotle University of Thessaloniki, Department of Civil Engineering, Faculty of Engineering, Thessaloniki, Greece DEREL Training Meeting – October 2011 – Department of Civil Engineering, Aristotle University of Thessaloniki, Thessaloniki

Overview of the field Aristotle University of Thessaloniki, Department of Civil Engineering, Faculty of Engineering, Thessaloniki, Greece DEREL Training Meeting – October 2011 – Department of Civil Engineering, Aristotle University of Thessaloniki, Thessaloniki Decision making Identification Classification Quantitative Qualitative Assessment Monitoring - Control Response Risk management plan

Aim of the course Aristotle University of Thessaloniki, Department of Civil Engineering, Faculty of Engineering, Thessaloniki, Greece 1.Identifying and quantitatively appreciating the uncertainty or reliability degree of the different variables and parameters under study. 2.Conceiving the significance of risk in environmental issues and problems and applying methods for its quantification. 3.Producing decision trees on various types of decision and risk analyses. 4.Solving environmental management problems by applying principles and methods of decision analysis. DEREL Training Meeting – October 2011 – Department of Civil Engineering, Aristotle University of Thessaloniki, Thessaloniki

Structure of the course Aristotle University of Thessaloniki, Department of Civil Engineering, Faculty of Engineering, Thessaloniki, Greece DEREL Training Meeting – October 2011 – Department of Civil Engineering, Aristotle University of Thessaloniki, Thessaloniki 1.Definitions on risk, hazard, uncertainty. 2.Content, Data, Tools and Techniques, Templates for each risk management process. 1.Risk identification: Delphi, Questionnaires, SWOT analysis, Brainstorming. 2.Qualitative Risk Assessment : HAZOP study, Probability – Impact matrix, FMEA. 3.Quantitative Risk Assessment : Sensitivity analysis, Scenario analysis, Decision trees, Analytical assessment, Monte Carlo simulation. 4.Risk Monitoring and Control : Monitoring equipment. 5.Risk response : Basics on Decision-making theory, Decision-making methods (MCDA, Decision trees, etc.)

Proposed literature Aristotle University of Thessaloniki, Department of Civil Engineering, Faculty of Engineering, Thessaloniki, Greece DEREL Training Meeting – October 2011 – Department of Civil Engineering, Aristotle University of Thessaloniki, Thessaloniki 1.Standards: PMBOK, BS_EN, ISO, National. 2.Books: Ganoulis_ html on/book/ Contamination-Management-Contain-Risk-Assessment-and- Legal-Issues-Volume-II UNESCO-IHP_ html 3.Scientific papers and presentations.

Student’s evaluation Aristotle University of Thessaloniki, Department of Civil Engineering, Faculty of Engineering, Thessaloniki, Greece DEREL Training Meeting – October 2011 – Department of Civil Engineering, Aristotle University of Thessaloniki, Thessaloniki After successfully attending the course the postgraduate student should be capable of: 1.Written exams. 2.Projects or exercises (per student) during the semester. Both needed! Students still find both the course and the exams very demanding