Upgrade of the Bucharest FN Tandem Accelerator S. Dobrescu, I. Branzan, C. V. Craciun, G. Dumitru, C. Florea, D. Ghita, G. Ion, G. Mihon, D. Moisa, D.

Slides:



Advertisements
Similar presentations
Study on the Injection System for Compact Cyclotron Mass Spectrometry Do Gyun Kim, Joonyeon Kim, H. C. Bhang Department of Physics, Seoul National University.
Advertisements

Lyon 2005 DIPAC Lyon th DIPAC Lyon June 2005Ulrich Raich CERN AB/BDI Instrumentation in small, low energy machines Ulrich Raich CERN AB-BDI.
Dan Gabriel Ghiţă IFIN-HH
H – Ion Source Development at RAL & FNAL PASI Meeting, RAL 3 rd April 2013 Scott Lawrie & Dan Faircloth (RAL) Dan Bollinger (FNAL)
RoSphere: The germanium array at the Tandem accelerator of IFIN-HH
Construction of a 1 MeV Electron Accelerator for High Precision Beta-Decay Studies REU Student: Brenden Longfellow, University of North Carolina at Chapel.
JYFLTRAP: Spectroscopy with multi-trap facility Facility Mass purified beams In-trap spectroscopy Future plans.
R Scrivens, CERN, ABI Workshop, 12/2008 The Feschenko Bunch Shape Monitor User experience at CERN Developed by INR, Troitsk. High resolution bunch shape.
“NUCLOTRON-M” - кеу element of NIKA A.D.Kovalenko.VHM Workshop, September 19, 2007, Dubna.
Mass Spectroscopy Mass Spectrometry ä Most useful tool for molecular structure determination if you can get it into gas phase ä Molecular weight of.
Van de Graaff Donna Kubik Spring, Van de Graaff With special thanks to Dick Seymour and Greg Harper at the University of Washington Van de Graaff.
Experimenting with Quarks Prof. Richard Jones University of Connecticut, Storrs Science Symposium, Darien High School, May 28, 2008.
Precise neutron inelastic cross section measurements A.Negret 1 1 “Horia Hulubei” National Institute for Physics and Nuclear Engineering, Bucharest, ROMANIA.
DAF Distributed Accelerator Facility (DAF) Transnational Access Nodes: 1.Tandem Accelerator Laboratory, Rudjer Boskovic Institute (RBI), Zagreb, Croatia.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
Multiplicity and Energy of Neutrons from 233U(nth,f) Fission Fragments
SNICS Ion Source Larry Lamm, Research Professor, Technical Director March, 2009 Nuclear Science Laboratory.
Secondary ion mass spectrometry (SIMS)
CHEMISTRY DEPARTMENT WAID ACADEMY Radioactivity. Radioactive calcium would differ from ordinary (non-radioactive) calcium in its 1.atomic mass. 2.chemical.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Accelerator Physics, JU, First Semester, (Saed Dababneh). 1 Example => Relevant Physics Analyzing system Energy. Ion species. Physics: Classical.
Heavy Ion Laboratory Warsaw University Jarosław Choiński.
Lawrence Livermore National Laboratory Nicholas Scielzo Lawrence Fellow Physics Division, Physical Sciences LLNL-PRES Lawrence Livermore National.
Mass Spectroscopy 1 Mass Spectroscopy (Mass Spec) Applying Atomic Structure Knowledge to Chemical Analysis.
Lab Course: Ion Sources Larry Lamm Research Professor Technical Director of the NSL Winter 2008.
Topic 2 Atomic Theory SL+HL. Topic 2.1 The atom Position ChargeRelative Mass Proton; p + Nucleus 1+ 1 Neutron; n Nucleus 0 1 Electron; e - Cloud/orbitals.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
LBNL 88'' cyclotron operations Status of the 88-Inch Cyclotron High-Voltage upgrade project December 14, 2009 Ken Yoshiki Franzen.
Lawrence Livermore National Laboratory Nicholas Scielzo Lawrence Fellow Physics Division, Physical Sciences LLNL-PRES Lawrence Livermore National.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
Alexander Aleksandrov Oak Ridge National Laboratory
A new RFQ cooler: concept, simulations and status Trapped Radioactive Isotopes:  icro-laboratories for Fundamental Physics E. Traykov TRI  P project.
February 21-21, 2008JINR Scientific Council 103-d session IREN project status.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
In Progress T-Rex TAMUTrap SASSYER Active Target Det RTC + chemistry Radioisotope production.
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
Lecture 9: Inelastic Scattering and Excited States 2/10/2003 Inelastic scattering refers to the process in which energy is transferred to the target,
Neutron inelastic cross section measurement on 28 Si Alexandru Negret Horia Hulubei National Institute for Physics and Nuclear Engineering, Bucharest,
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
22 Set 2009 EPPC 09 CERN September /14 Solid-State MARX Type Circuit for the ISOLDE Target Voltage Modulator L.M. Redondo*, J. Fernando Silva.
Performance analysis of cryogenic system and cryomodules for the complete superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
TRI  P RFQ design, simulations and tests E. Traykov TRI  P project and facility RFQ tests and design Simulations Conclusion TRI  P Group: G.P. Berg,
H4F Physics Day 2014 C.Ullmann Proton injector status for FAIR and measurements at BETSI test bench (CEA/Saclay) 2014.
KIT - The cooperation of Forschungszentrum Karlsruhe GmbH and Universität Karlsruhe (TH) Florian Fränkle EPS HEP 2009 Krakow 1 KATRIN: An experiment to.
Overview of Tandem Accelerator Facility and related R&D Work at NCP Ishaq Ahmad
Improved performance of Variable Energy Cyclotron(VEC) Variable Energy Cyclotron Centre Kolkata P S Chakraborty, B Ch Mandal, S K Thakur, M Das, S Som,
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
MLL Workshop on Future Science 2019 and beyond, 16.Dec.2015 The accelerator, as seen by.. 1 From LBNL Image Library Collection by Dave Judd and Ronn MacKenzie.
Report Technical Director Storage-Ring-Installation Completed
NICA injection complex status
How does a klystron work? TE-MPE Section Meeting Karolina Kulesz
Heating and radiological
Continuous Flow Isotope Ratio Mass Spectrometry
Studies at BINP Alexander Krasnov
Department of Tandem Accelerators
Integration of the e+ elements
A. Martynov on behalf of accelerator division.
JYFL ION COOLER AND BUNCHER.
WP11: electron and proton beam testing
Mass Spectroscopy. Mass Spectroscopy Mass Spectrometry Most useful tool for molecular structure determination if you can get it into gas phase Molecular.
Bucharest-Magurele, Romania M. BOROMIZA - Trieste, October, 2017
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
MEG実験の液体Xe検出器について 東大 ICEPP  森研究室 M1 金子大輔.
Physics Design on Injector I
The Nanosecond bunching system at KIGAM Tandem Accelerator
Three kinds of particle emission
Pulsed electron beam cooling experiments: data & preliminary results
Presentation transcript:

Upgrade of the Bucharest FN Tandem Accelerator S. Dobrescu, I. Branzan, C. V. Craciun, G. Dumitru, C. Florea, D. Ghita, G. Ion, G. Mihon, D. Moisa, D. V. Mosu, G. Naghel, C. Paun, S. Papureanu and T. Sava Upgrade of the Bucharest FN Tandem Accelerator S. Dobrescu, I. Branzan, C. V. Craciun, G. Dumitru, C. Florea, D. Ghita, G. Ion, G. Mihon, D. Moisa, D. V. Mosu, G. Naghel, C. Paun, S. Papureanu and T. Sava HIAT 2009 National Institute for Physics and Nuclear Engineering “Horia Hulubei” (IFIN-HH, Bucharest, Romania)

Main milestones of the Bucharest FN tandem accelerator 1973 : Commissioning of the FN Tandem accelerator 1977 : A strong earthquake (7.2 Richter scale) induced the collapse of the tandem column 1979 : Upgrade to 9 MV of the tandem (5-10% SF6) 1983 : A second negative heavy ion injector (HICONEX 834) was installed 1986 : Another strong earthquake (6.9 Richter scale) damaged again the tandem column : An original seismic protection system of the tandem accelerator tank was installed (see picture) 1990 : A new terminal voltage divider was installed 1991 – 2005 : About 3500 beam hours/year 2006 – 2009 : Upgrade program of the Bucharest tandem accelerator

Main milestones of the Bucharest FN tandem accelerator 1973 : Commissioning of the FN Tandem accelerator 1977 : A strong earthquake (7.2 Richter scale) induced the collapse of the tandem column 1979 : Upgrade to 9 MV of the tandem (5-10% SF6) 1983 : A second negative heavy ion injector (HICONEX 834) was installed 1986 : Another strong earthquake (6.9 Richter scale) damaged again the tandem column : An original seismic protection system of the tandem accelerator tank was installed 1990 : A new terminal voltage divider was installed 1991 – 2005 : About 3500 beam hours/year 2006 – 2009 : Upgrade program of the Bucharest tandem accelerator

The main original tandem equipment still in use in 2006 was in very poor condition due to physical and moral wear and some of the necessary spare parts were no longer available on the market. Question: Is it worth to invest in an old facility ? Answer: Yes, in certain conditions: - The main accelerator parts (column, tank, magnets, building) are in good condition There is a scientific interest and a strategy for the future research with accelerated ion beams - There is a scientific interest and a strategy for the future research with accelerated ion beams

Motivations The Bucharest FN Tandem Accelerator :  Is the only tandem accelerator of this type in Romania and even in S-E Europe  Is an important facility for: - Atomic and some nuclear physics research - Applications (IBA, AMS) - Preparation of experiments for LSF - Education

Upgrade program (2006 – 2009) Pelletron system installation Pelletron system installation New set of accelerator tubes New set of accelerator tubes Renewing of the tandem injector Renewing of the tandem injector Millisecond beam pulsing Millisecond beam pulsing Nanosecond beam pulsing Nanosecond beam pulsing Replacement of all electrical equipment Replacement of all electrical equipment Refurbish of the tandem vacuum system Refurbish of the tandem vacuum system Improvement of auxiliary equipment Improvement of auxiliary equipment

1. Pelletron system installation

Frames with 300 MΩ resistors

2. New set of accelerator tubes The old set of accelerator tu bes (st. steel electrodes, inclined field) A set of new accelerator tubes (titanium electrodes, spiral field)

3. Renewing of the tandem injector of negative ions a)New sputter negative ion source (SNICS II) b)New helium negative ion source c)New sputter ion source for AMS application (MC-SNICS II)

a. SNICS II sputter source installation

b. He negative ion source

4. Millisecond pulsing system Chopper system (two plates 500 mm long) Rectangular TTL-pulses Period: T = 5 ms - 2x10 4 s Amplitude: up to 1 kV Rise time: < 50 ns Pulse duration: 3% - 50% of T Home made

5. Nanosecond pulsing system Chopper + buncher Chopper pulse rate: 5 MHz, 1.25 MHZ, 625 kHz, …., kHz Buncher: two tubes, match injected beams from mass 1 to over mass 40 u Pulse duration: 1-3 ns Packing efficiency: 25% Made by NEC (2009)

The injector and LE line of the Bucharest tandem

Buncher of the nanosecond pulsing system Millisecond pulsing system

6. Replacement of all electric equipment  Power supplies of low voltage for the inflection magnet (1 kW), analyzing magnet (12 kW) and switching magnet (20 kW) (DANFYSIK, Denmark) Long term current stability : 10 ppm  Power supplies for two magnetic quadrupole lenses. (SORENSEN, USA) Long term current stability : 100 ppm  High voltage power supplies for the ion injectors and for the Einzel lens on the LE ion beam line (GLASSMAN, USA)  Hall probe fluxmeter for the inflection magnet (Group3, New Zeeland)  RMN fluxmeter for the analyzing magnet (METROLAB, Switzerland)  GVM : a second GVM, terminal stability < 1 kV at 9 MV

Old GVM New GVM

6. Refurbish of the vacuum system New turbomolecular and fore vacuum pumps New gate valves New vacuum measuring system

6. Improvement of auxiliary equipment Installation of a high power (250 kVA) on- line, dual UPS (Uninterruptible Power Supply) Increase of the thermal capacity of the refrigeration system that cools down the distilled water Installation of new distilled water pumps and air compressors

CONCLUSIONS 1.The upgrade program of the Bucharest FN tandem accelerator, developed in the period , had as a main result the transformation of this 36 years old accelerator into a modern, performing and reliable facility 2.The tandem delivers stable beams of a large range of ion species: protons (2 – 18 MeV), helium (3-27 MeV) and a broad range of heavy ions at energies up to 100 MeV 3.The beam intensities range from nA to µA depending on the electron affinity of the elements 4.The accelerated beam may be pulsed in the millisecond range and in the nanosecond range

European Infrastructure in Nuclear Physics The performances of the upgraded Bucharest FN tandem accelerator combined with a strong scientific research program and with high level results open for this facility the prospect to become an active part of the European Infrastructure in Nuclear Physics.

Thank you.

Research program  In-beam Gamma-ray Spectroscopy using a small array of HPGe detectors, silicon detectors for charged particles and liquid scintillators for neutron detection.  Proton induced fission studies on actinides using an array of 81 plastic scintillators for neutron detection to be installed.  Studies of nuclear isomery, namely accurate measurements of the electromagnetic moments of excited isomeric states, using ns pulsed accelerated ion beams.  Atomic physics: new studies of the inner shell vacancy production and sharing in heavy systems at intermediate ion energies.  New applications of IBA methods using up-to-date experimental set-ups now under development.  In-house research making use of the tandem accelerator ion beams for testing new detection systems and experimental methods for large scale facilities.