Linac Laser Notcher David Johnson, Todd Johnson, Matt Gardner, Kevin Duel April PMG Meeting April 2, 2015.

Slides:



Advertisements
Similar presentations
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Advertisements

R. Miyamoto, Beam Physics Design of MEBT, ESS AD Retreat 1 Beam Physics Design of MEBT Ryoichi Miyamoto (ESS) November 29th, 2012 ESS AD Retreat On behalf.
Progress of the sub-harmonic bunching system (i.e. upgrading progress of BEPCII present bunching system) Pei Shilun for the SHBS team Accelerator center,
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
ERHIC Main Linac Design E. Pozdeyev + eRHIC team BNL.
Linac Laser Notcher Status David Johnson Todd Johnson, Vic Scarpine, Andrea Saewert, John Sobolewski PIP Meeting March 6, 2013 Beams Doc 4306.
Laser Notcher Status Dave Johnson, Todd Johnson, John Sobolewski, Kevin Duel, Andrea Saewert September 11,2013.
David Johnson, Todd Johnson, John Sobolewski, Fred Mach, Kevin Duel, Andrea Saewert February 11, 2014 Accelerator Physics and Technology Seminar.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
David Johnson –APC -.  The Proton Improvement Plan is tasked with Booster upgrades which will increase the Booster throughput required for future operation.
Linac Laser Notcher Status David Johnson and Todd Johnson PIP Meeting October 10, 2012 Beams doc 4237.
RF Synchronization, control and stability Takuya Natsui.
Laser Notcher Pulse Energy Requirements & Demonstration Experiment David Johnson, Todd Johnson, Vic Scarpine.
Laser Notcher Status Dave Johnson PIP Meeting April 29, 2014.
Commissioning and Data Collection David Johnson Accelerator Physics Center Proton Source Department Meeting June, 23, 2011.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
ESS DTL beam commissioning
PIP Linac Laser Notcher Overview & Plans David Johnson Todd Johnson, Kevin Duel, Fred Mach August 5, 2014 PIP Linac Laser Notcher System Installation Readiness.
Laser Notching Demonstration Experiment (Preliminary Results) David Johnson, Todd Johnson, Matt Gardner, Vic Scarpine, Rick Tesarek.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Linac e+ source for ILC, CLIC, SuperB, … Vitaly Yakimenko, Igor Pogorelsky November 17, 2008 BNL.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
Compton based Polarized Positrons Source for ILC V. Yakimenko Brookhaven National Laboratory September 12, 2006 RuPAC 2006, Novosibirsk.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Anders Sunesson RF Group ESS Accelerator Division
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
FFAG Accelerators for Proton Driver Alessandro G. Ruggiero Brookhaven National Laboratory FFAG 2007, Grenoble, France April 12-17, 2007.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Laser Notcher Demonstration Experiment Dave Johnson, Todd Johnson, Matt Gardner. Rick Tesarek, Vic Sacrpine.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
AEM – Special Report Linac Current Stability and Modulation June 25, 2007 Presented by: Doug Moehs Philippians 4:6-7 (Doug) Do not be anxious about anything,
Advancement in photo-injector laser: Second Amplifier & Harmonic Generation M. Petrarca CERN M. Martyanov, G. Luchinin, V. Lozhkarev Institute of Applied.
Fiber Amp 2 MDC Bias Control DA12000 AWG RF Amp Seed Modulator Fiber Pre-Amp Fiber Amp 1 Ext. clock sync to RFQ Pump VDRIVE Fiber Port REA Amp RBA Amp.
Yb:YAG Regenerative Amplifier for A1 Ground Laser Hut Rui Zhang ACCL Division V, RF-Gun Group Nov 20, 2015 SuperKEKB Injector Laser RF Gun Review.
PIP Linac Laser Notcher Overview & Plans David Johnson Todd Johnson, Kevin Duel, Fred Mach August 5, 2014 PIP Linac Laser Notcher System Installation Readiness.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
David Johnson Jinhao Ruan, Jamie Santucci, Vic Scarpine, Ray Tomlin Presentation to PIP November 16, 2011.
D.E. Johnson, T.R. Johnson, K.L. Duel, M. Gardner, V. Scarpine, R.J. Tesarek Motivation Notching process in the Booster creates about 30-35% of the total.
Laser Notcher Status Dave Johnson PIP Meeting June 26,2012.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
DTL Option for MEIC Ion Injection Jiquan Guo, Haipeng Wang Jlab 3/30/
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
1 Junji Urakawa (KEK, Japan) at PosiPol2012, Under development of Quantum Beam Technology Program(QBTP) supported by MEXT from to
An H- stripping laser using commercial, diode-pumped Nd:YAG amplifiers Russell Wilcox Laser Stripping Workshop, April 11, 2011.
Linac Laser Notcher Status David Johnson, Todd Johnson, Kevin Duel, David Slimmer, Matt Gardner Sreenivas Patil, Jason Tafoya March 2, 2016 PIP weekly.
September 12-13, 2013 BNL Laser Profile, Energy and Space Charge Potential Monitor Deepak Raparia September 26, 2013.
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
David Johnson, Todd Johnson, John Sobolewski, Kevin Duel, Peter Prieto, Andrea Saewert 13rd mini-Workshop on Laser Stripping.
Yb:YAG Regenerative Amplifier for A1 Ground Laser Hut Rui Zhang ACCL Division V, RF-Gun Group Nov 20, 2015 SuperKEKB Injector Laser RF Gun Review.
Physics design on Injector-1 RFQ
Timing and synchronization at SPARC
Compton effect and ThomX What possible future?
Advanced Research Electron Accelerator Laboratory
Jim Clarke ASTeC Daresbury Laboratory March 2006
Andrew Hutton Concept suggested independently by Haipeng Wang
Multi-Ion Injector Linac Design – Progress Summary
Presentation transcript:

Linac Laser Notcher David Johnson, Todd Johnson, Matt Gardner, Kevin Duel April PMG Meeting April 2, 2015

Topics Motivation Concept Laser Requirements System Design Demonstration Experiment Status 2

Motivation Reduce losses associated with the “Notching” process – Current Notching process takes place in the ring – Notching occurs 400 MeV for non-cogged cycles 700 MeV for MI injection Move losses & notching out of Booster tunnel  Move to 750 KeV where activation is not an issue  Reduce uncontrolled loss power from 300W to 17 W 300W is calculated from 15 Hz at 700 MeV notch 17 W is calculated from a 15 Hz at 400 MeV cleanup, assuming: – 90% Linac Notch – 10% Booster Beam notch cleanup Where to install this device in the 750 keV MEBT ? What technique do we use? 3

Linac 750 keV Medium Energy Beam Transport TANK 1 RFQ Test laser ~2 ½ “ ~30 “ 4

Move Notching to Linac Beam Requires creating N +/- 1 notches in each 15 Hz Linac pulse – N is the number of turns injected into Booster Each notch ultimately needs to be ~ 60 ns in length (determined by extraction kicker rise time) Separation of notches is determined by Booster injection revolution frequency (~450 kHz) 67 ms 2.2 us*N ~60-90 ns 2.2 us 15 Hz Linac pulse structure Single Linac pulse 5

Utilize Laser to Photoneutralize* the H- Rest frame energy 1.16 eV for 1064 nm laser Cross section 3.66x cm 2 To maximize the neutralization probability->maximize the product fixed 6 To maximize  for a given H- ion energy  increase the number of laser interactions with the ion bunch *Proposed & demonstrated by Ray Tomlin, circa 2000  Laser pulse energy required to neutralize a single 60 ns section of linac pulse  Must be repeated N times within a single linac pulse Requires ~1J/notch

Reduction of Pulse Energy To reduce the required pulse energy we can effectively increase the interaction time by utilizing an optical cavity such that the laser interacts with the ion beam multiple times. 7 H- Linear cavity (zig-zag)  Laser follows ion to interact many times (increase  )  Cavity length proportional to number of interactions  Cavity dimensions determined by ion velocity and bunch spacing R. Shafer, 1998 BIW Assume mirror reflectivity 99.95% 20 reflections  This still requires ~ 100 mJ laser at 450 kHz  (Not a small laser system)

Further Reduction of Laser Energy  Laser energy illuminating the space between H- bunches is wasted and only adds to laser average power  To further reduce the required laser energy -> match the laser temporal pulses to linac bunch structure 5 turn Booster injection 2 mJ Energy required per bunch for a 21 interaction cavity  Where do we put this interaction cavity? 8

Linac Beam Direction Laser IN Laser OUT RFQ Linac Beam Direction 9 1 st MEBT Quad

10

H-H- 11

Laser Requirements  Laser pulses much match bunch frequency  MHz  Laser pulse length (duration) = or > bunch length  Laser pulses must be phased with RFQ  All ions in bunch should see same photon density  Uniform temporal profile  Uniform spatial profile  The burst of laser pulses must match the Booster injection revolution frequency (~450 kHz)  The 450 kHz burst must have appropriate timing within the linac pulse  do we want to clean up head/tail  where within the pulse do we want notches (beginning or end of each turn ?)  The pulse energy should neutralize > 99% ( my GOAL) of ions in each bunch 12

System Design Technique (M aster O scillator P ower A mplifier design)  Utilize a CW seed laser and wave-guide modulator to create required laser pulse pattern (both 200 MHz and 450 kHz) at low pulse energies (pJ)  Amplify pulse pattern using a three-stage fiber amplifier (nJ to uJ)  Further amplify using two free-space solid state amplifier modules (mJ)  Create a spatially uniform photon beam  Insert laser pulse into a linear zig-zag interaction cavity where the laser reflections inside the cavity match the ion velocity 13

Fiber Amp 2 MDC Bias Control DA12000 AWG RF Amp Seed Modulator Fiber Pre-Amp Fiber Amp 1 Ext. clock sync to RFQ Pump VDRIVE supply RBA Controller REA Controller Fiber Port Pump REA Amp Pump RBA Amp Fermi OPG PriTel Yb FA Optical Engines PCF FA Free Space Osc. Keep Alive Trigger sync to RFQ Matching Optics Beam Stacker Transport Optics 15 Hz CW E=50 pJ P=24mW =300 uW E= 200 nJ P= 100W = 1.5W E= 3 nJ P= 1.5 W = 21 mW E= 6.5 uJ P= 3 kW = 46 W E= 2 mJ P= 1 MW 450 = 14 KW 15 = 7.7 W ^ ^ ^ ^ ^ 14

Demonstration Experiment (1) 1.Demonstrate the neutralization of a single bunch at the exit of the RFQ using the installed optical cavity. 2.Measure the neutralization fraction as a function of laser pulse energy to compare with the predicted values. 3.Measure the vertical ion beam size to determine the optimal vertical size of the laser pulse to maximize neutralization. 4.Refine installation details of the transport system and dump system. 5.Get practice in and understand the tuning process for launching the laser into the cavity and the transport to the dump for energy and profile monitoring. Todd Johnson Matt Gardner Vic Scarpine Rick Tesarek Andrea Saewert Mike Kucera Kevin Duel Jamie Santucci Fred Mach High Rise & PPD Machine shops Matt Quinn Dave Baird Ray Lewis Fernanda Garcia, Bob Zwaska, Bill Pellico Since laser system still under design -> substitute laser (Quantel 100 mJ Nd:YAG Qsw.) -> laser spatial parameters VERY diff. from diode -> build optics to match laser  Proposed-mid Nov cm100 cm 214 cm TM11 15

D.E. Layout (space challenge) 16

Demonstration Experiment (2) PD signal Zoom Notch Errors are in rms Efficiency error sources Baseline uncertainty (~5%) Pulse amplitude uncertainty (~5%) Effective laser pulse energy error sources Temporal and geometric matching to beam pulse  Laser system produced Notch in linac beam – Jan 8, 2015 Increase Vertical laser dimension from ~6 mm -> 10mm Consistent with later simulation and measurement 17

Status We are back to where we were this fall. We learned a lot from the Demonstration experiment – Measured extinction agrees with expectations – Space is tight (which we already knew) re-thinking cart orientation – Vertical H- beam size larger than simulations and first reported, which we can accommodate – Learned a lot about technique for getting laser into/out of cavity – Allowed us to firm up what we want to use for Laser Dump diagnostics/monitoring – Got experience working with ES&H and what will be required to install class 4 laser system in a public area Certifying operation of fiber amplifiers Developing instrumentation for laser beam monitoring We have all major amplifiers and optical components Installation planned this summer shutdown 18