Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Analysis Fundamentals Lecture No. 56 Chapter 14 Contemporary Engineering Economics.

Slides:



Advertisements
Similar presentations
(c) 2001 Contemporary Engineering Economics 1 Chapter 15 Replacement Decisions Replacement Analysis Fundamentals Economic Service Life Replacement Analysis.
Advertisements

Replacement studies Construction Engineering 221 Economic Analysis.
Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Decisions Lecture No. 58 Chapter 14 Contemporary Engineering Economics Copyright ©
Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Spring, Replacement Basics.
Lecture No. 47 Chapter 14 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
McGraw-Hill/Irwin Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. 7-0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition.
1 Project Cash Flow Analysis Lecture No. 27 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Contemporary Engineering Economics, 4 th edition, © 2007 Effects of Inflation on Project Cash Flows Lecture No. 45 Chapter 11 Contemporary Engineering.
Debt Management Lecture No.10 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Contemporary Engineering Economics, 4 th edition, © 2007 Generalized Cash Flow Approach – Lease versus Buy Lecture No. 42 Chapter 10 Contemporary Engineering.
Contemporry Engineering Economics, 4 th edition, © 2007 Equivalence Calculations with Continuous Payments Lecture No.12 Chapter 4 Contemporary Engineering.
Chapter 11 Replacement Decisions
Engineering Economy IEN255 Chapter 10 - Replacement Analysis  4-6 best investment alternative  How to add profit  but what about not increasing sales,
(c) 2001 Contemporary Engineering Economics 1 Chapter 8 Annual Equivalent Worth Analysis Annual equivalent criterion Applying annual worth analysis Mutually.
Sensitivity and Breakeven Analysis
Chapter 15 Replacement Decisions
Machine Replacement or Retention Pertemuan 21 s.d 22 Matakuliah: D 0094 Ekonomi Teknik Tahun: 2007.
Contemporary Engineering Economics, 4 th edition, © 2007 Debt Management Lecture No.13 Chapter 4 Contemporary Engineering Economics Copyright © 2006.
CHAPTER 9 Replacement Analysis.
Lecture No.33 Chapter 10 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Lecture No. 35 Chapter 11 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Project Cash Flow – Incremental Cash Flow (Ch – 10.7) 05/22/06.
© 2012 by McGraw-Hill All Rights Reserved 11-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 11 Replacement.
Contemporary Engineering Economics, 4 th edition, © 2007 Economic Service Life Lecture No. 57 Chapter 14 Contemporary Engineering Economics Copyright ©
ENGM 661 Engineering Economics Replacement Analysis.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Methods of Financing Lecture No.
Accounting Principles, Ninth Edition
Lecture No. 49 Chapter 15 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Lecture No. 37 Chapter 11 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis with Tax Consideration.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Effects of Inflation on Project Cash.
Lecture No.19 Chapter 6 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Process of Developing Project Cash.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis Fundamentals.
Lecture No.20 Chapter 6 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Sensitivity and Breakeven Analysis Lecture No. 25 Chapter 10 Fundamentals of Engineering Economics Copyright © 2008.
22-0 Incremental Cash Flows 22.4 After-tax lease payment (outflow) Lease payment*(1 – T) Lost depreciation tax shield (outflow) Depreciation * tax rate.
1 Replacement Decisions How should an asset be replaced? If an asset can be overhauled and used a little longer, should those funds be invested in the.
Cost/Benefit Analysis Review Cost/Benefit can done using NPW or EAW, pick one! (choose whichever method is easiest for the problem statement) Criteria:
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Generalized Cash Flow Approach –
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Decisions Lecture No.
Lecture No. 46 Chapter 14 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
MAKING INVESTMENT DECISIONS WITH THE NET PRESENT VALUE RULE
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Applying Annual Worth Analysis Lecture.
Contemporary Engineering Economics, 4 th edition, © 2007 Applying Annual Worth Analysis Lecture No.20 Chapter 6 Contemporary Engineering Economics Copyright.
1 Developing Project Cash Flow Statement Lecture No. 23 Chapter 9 Fundamentals of Engineering Economics Copyright © 2008.
Contemporary Engineering Economics, 4 th edition, © 2007 When Projects Require Only Operating and Investing Activities Lecture No. 39 Chapter 10 Contemporary.
10-0 Making Capital Investment Decisions Chapter 10 Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Engineering Economic Decisions Lecture.
1 Replacement Decision Models Lecture No. 28 Chapter 11 Fundamentals of Engineering Economics Copyright © 2008.
Copyright  2004 McGraw-Hill Australia Pty Ltd PPTs t/a Fundamentals of Corporate Finance 3e Ross, Thompson, Christensen, Westerfield and Jordan Slides.
3/16/2016rd1 Engineering Economic Analysis Chapter 13  Replacement Analysis.
Engineering Economic Analysis Canadian Edition
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 16 Recording and Evaluating Capital Resource Activities:
Replacement Analysis and Economic Life Should we replace an asset that we own now or later?
Effects of Inflation on Project Cash Flows
Replacement Analysis Lecture No. 46 Chapter 14
Applying Annual Worth Analysis
Inflation and Its Effects on Project Cash Flows
Equivalence Calculations with Continuous Payments
Equivalence Calculations with Continuous Payments
Engineering Economics
Engineering Economy: Replacement Study
Project Cash Flow Analysis
Chapter 9: Replacement Analysis
REPLACEMENT DECISIONS
Cost Accounting for Decision-making
OUTLINE QUESTIONS? NEWS? REMINDERS: EVALUATIONS
Process of Developing Project Cash Flows
Presentation transcript:

Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Analysis Fundamentals Lecture No. 56 Chapter 14 Contemporary Engineering Economics Copyright © 2006

Contemporary Engineering Economics, 4 th edition, © 2007 Chapter Opening Story – Options for Replacing Alaskan Viaduct Issue: The Washington State Department of Transportation has to decide whether the state should replace the damaged viaduct with a tunnel or to rebuild the viaduct in its current existing structure Option 1: Build a Tunnel  Cost: $3.6B to $4.1B Option 2: Rebuild the Viaduct  Cost: $2.7-$3.1B

Contemporary Engineering Economics, 4 th edition, © 2007 Sunk cost: any past cost unaffected by any future decisions Trade-in allowance: value offered by the vendor to reduce the price of a new equipment Defender: an old machine Challenger: a new machine Current market value: selling price of the defender in the market place Replacement Terminology

Contemporary Engineering Economics, 4 th edition, © 2007 Sunk Cost associated with an Asset’s Disposal $0 $5000 $10,000 $15,000 $20,000 $25,000 $30,000 Original investment $10,000$5000 Market value $10,000 Lost investment (economic depreciation) Repair cost $20,000 Sunk costs = $15,000

Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Decisions Cash Flow Approach  Treat the proceeds from sale of the old machine as down payment toward purchasing the new machine.  This approach is meaningful when both the defender and challenger have the same service life. Opportunity Cost Approach  Treat the proceeds from sale of the old machine as the investment required to keep the old machine.  This approach is more commonly practiced in replacement analysis.

Contemporary Engineering Economics, 4 th edition, © 2007 Example 14.2 Defender  Market price: $10,000  Remaining useful life: 3 years  Salvage value: $2,500  O&M cost: $8,000 Challenger  Cost: $15,000  Useful life: 3 years  Salvage value: $5,500  O&M cost: $6,000

Contemporary Engineering Economics, 4 th edition, © $8000 $2500 $15,000 $6000 $5500 (a) Defender(b) Challenger $10,000 Sales proceeds from defender Replacement Analysis – Cash Flow Approach

Contemporary Engineering Economics, 4 th edition, © 2007 Defender: PW(12%) D = $8,000 (P/A, 12%, 3) -$2,500 (P/F, 12%, 3) = $17, AEC(12%) D = PW(12%) D (A/P, 12%, 3) = $7, Challenger: PW(12%) C = $5,000 + $6,000 (P/A, 12%, 3) - $5,500 (P/F, 12%, 3) = $15, AEC(12%) C = PW(12%) C (A/P, 12%, 3) = $6, Replace the defender now! Annual Equivalent Cost - Cash Flow Approach

Contemporary Engineering Economics, 4 th edition, © 2007 Comparison of Defender and Challenger Based on Opportunity Cost Approach

Contemporary Engineering Economics, 4 th edition, © 2007 Defender: PW(12%) D = -$10,000 - $8,000(P/A, 12%, 3) + $2,500(P/F, 12%, 3) = -$27, AEC(12%) D = -PW(12%) D (A/P, 12%, 3) = $11, Challenger: PW(12%) C = -$15,000 - $6,000(P/A, 12%, 3) + $5,500(P/F, 12%, 3) = -$25, AEC(12%) C = -PW(12%) C (A/P, 12%, 3) = $10, Replace the defender now! Annual Equivalent Cost - Opportunity Cost Approach