1 DSN Network e-VLBI Calibration of Earth Orientation L. D. Zhang a,b, A. Steppe a, G. Lanyi a Presentation at 5-th International e-VLBI Workshop Westford,

Slides:



Advertisements
Similar presentations
Jet Propulsion Laboratory California Institute of Technology The NASA/JPL Airborne Synthetic Aperture Radar System (AIRSAR) Yunling Lou Jet Propulsion.
Advertisements

Use of Kalman filters in time and frequency analysis John Davis 1st May 2011.
An appearance-based visual compass for mobile robots Jürgen Sturm University of Amsterdam Informatics Institute.
Terrain Relative Navigation for Pinpoint Landing using Cubesats
ACCURACY CHARACTERIZATION FOR METROPOLITAN-SCALE WI-FI LOCALIZATION Presented by Jack Li March 5, 2009.
2-3 November 2009NASA Sea Level Workshop1 The Terrestrial Reference Frame and its Impact on Sea Level Change Studies GPS VLBI John Ries Center for Space.
SAT- 1 National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Mars CubeSat/NanoSat Workshop.
Sam Pfister, Stergios Roumeliotis, Joel Burdick
Jairus Hihn Jet Propulsion Laboratory, California Institute of Technology Domain-Oriented Modeling, Estimation and Improvement for Aerospace November 2,
On the Constancy of Internet Path Properties Yin Zhang, Nick Duffield AT&T Labs Vern Paxson, Scott Shenker ACIRI Internet Measurement Workshop 2001 Presented.
Very Long Baseline Interferometry (VLBI) – Techniques and Applications Steven Tingay ATNF Astronomical Synthesis Imaging Workshop Narrabri, 24 – 28 September,
CCU VISION LABORATORY Object Speed Measurements Using Motion Blurred Images 林惠勇 中正大學電機系
Laser Ranging Contributions to Earth Rotation Studies Richard S. Gross Jet Propulsion Laboratory California Institute of Technology Pasadena, CA 91109–8099,
What Requirements Drive NGAO Cost? Richard Dekany NGAO Team Meeting September 11-12, 2008.
Ongoing e-VLBI Developments with K5 VLBI System Hiroshi Takeuchi, Tetsuro Kondo, Yasuhiro Koyama, and Moritaka Kimura Kashima Space Research Center/NICT.
Know the Earth…Show the Way NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY Approved for Public Release NGA Case # NGA’s Role in GPS Barbara Wiley.
VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.
Electronic Transmission of Very- Long Baseline Interferometry Data National Internet2 day, March 18, 2004 David LapsleyAlan Whitney MIT Haystack Observatory,
2012 DiFX user’s meeting, Sydney, Australia USNO Software Correlator: Status Report Outline USNO/WACO Background USNO Prototype Software Correlator (UPSC)
1 Applications of the CORS System Richard Snay & Giovanni Sella National Geodetic Survey National Ocean Service, NOAA NOAA GNSS Workshop Boulder, Colorado.
Current LBA Developments Chris Phillips CSIRO ATNF 13/7/2005.
SVY 207: Lecture 4 GPS Description and Signal Structure
E-VLBI: Connecting the Global Array of Radio Telescopes through High-Speed Networks Participating U.S. organizations: MIT Haystack Observatory MIT Lincoln.
Developments for real-time software correlation e-VLBI Y. Koyama, T. Kondo, M. Kimura, M. Sekido, M. Hirabaru, and M. Harai Kashima Space Research Center,
Esci 203, Earth Structure and Deformation Introduction to the global positioning system (GPS) John Townend EQC Fellow in Seismic Studies
New correlator MicroPARSEC Igor Surkis, Vladimir Zimovsky, Violetta Shantyr, Alexey Melnikov Institute of Applied Astronomy Russian Academy of Science.
Page 1 SQM: SBAS Workshop ZETA ASSOCIATES 21 June 2005.
NGS GPS ORBIT DETERMINATION Positioning America for the Future NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION National Ocean Service National Geodetic.
上海天文台 Shanghai Astronomical Observatory e-VLBI Progress in China Zhang Xiuzhong, team of Chinese VLBI Network Shanghai Astronomical Observatory Chinese.
Ground Support Network operations for the GRAS Radio Occultation Mission R. Zandbergen, the GRAS GSN team (ESOC) and the Metop GRAS team (EUMETSAT) 09/09/2011.
Space Geodesy (1/3) Geodesy provides a foundation for all Earth observations Space geodesy is the use of precise measurements between space objects (e.g.,
The Future of the VLBA Workshop, Charlottesville, VA Earth Orientation and GPS Outline Geodetic VLBI background Applications of Geodetic VLBI VLBI for.
JPL/Caltech NASA 11 Jan 2006, C.S. Jacobs Page 1 Extending ICRF to 24 GHz C.S. Jacobs JPL (Caltech/NASA) P. Charlot, E.B. Fomalont, D. Gordon, G.E. Lanyi,
Scientific Measurement UNIT 1. A. SI Units B. Qualitative Measurement Vs. Quantitative Measurement 1. Qualitative  Deals with description (senses) 
Geodetic Networks: The Supporting Framework Terrestrial Reference Frame is ‘Critical Infrastructure’ for all Earth science research and applications. Global.
Radio Astronomy Applications Group Kashima Space Research Center National Institute of Information and Communications Technology EGU2005 GI1-1TH5P-0026.
E-VLBI over TransPAC Masaki HirabaruDavid LapsleyYasuhiro KoyamaAlan Whitney Communications Research Laboratory, Japan MIT Haystack Observatory, USA Communications.
Radio Astronomy Applications Group Kashima Space Research Center National Institute of Information and Communications Technology EGU2005 GI3-1TH5P-0057.
GGOS User Requirements and Functional Specifications Richard S. Gross Jet Propulsion Laboratory, California Institute of Technology, Pasadena, USA Global.
Geodetic Research Laboratory Department of Geodesy and Geomatics Engineering University of New Brunswick 01/06/27 S.Bisnath A NEW TECHNIQUE FOR GPS-BASED.
Automated Weather Observations from Ships and Buoys: A Future Resource for Climatologists Shawn R. Smith Center for Ocean-Atmospheric Prediction Studies.
E-VLBI: Creating a Global Radio Telescope via High-Speed Networks Alan R. Whitney MIT Haystack Observatory SLAC Data Management Workshop 17 March 2004.
1 J July, Ionospheric Calibration for the GFO AltimeterXiaoqing JPL Review Ionospheric Calibration for the GFO Altimeter Xiaoqing Pi Byron.
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
Abstract Astrometric observations of distant active galactic nuclei (AGN) have been used to construct quasi-intertial global reference frames, most notably.
An FX software correlator for VLBI Adam Deller Swinburne University Australia Telescope National Facility (ATNF)
The current status of K5 eVLBI intensive session Takashima, Kazuhiro; Machida,Morito; Fujisaku, Junichi; Kokado, Kensuke; Shigematsu, Hiromi Geographical.
1 Value of information – SITEX Data analysis Shubha Kadambe (310) Information Sciences Laboratory HRL Labs 3011 Malibu Canyon.
Earth Surface and Interior Focus Area Space Geodetic Networks for Maintaining the Reference Frame Geodesy's Critical Contributions to NASA (Earth Science)
Giga-bit Geodesy e-VLBI at 22GHz Hiroshi Takaba Gifu University, Japan.
VLBI Oct Development Status of Broadband VLBI System (Gala-V) -(II) M.Sekido (1), K.Takefuji (1), H.Ujihara (1), M.Tsutsumi.
(c) 2009 California Institute of Technology. Government sponsorship acknowledged. Improving Predictions of the Earth’s Rotation Using Oceanic Angular Momentum.
View on GPS and Galileo ‘From across the Atlantic…’ Ruth E. Neilan International GNSS Service (IGS) Central Bureau Jet Propulsion Laboratory/California.
Goldstone Radar Support for LCROSS Evaluation of Impact Sites Martin Slade October 16, 2006 National Aeronautics and Space Administration Jet Propulsion.
Visual Odometry for Ground Vehicle Applications David Nistér, Oleg Naroditsky, and James Bergen Sarnoff Corporation CN5300 Princeton, New Jersey
Geodetic Networks: The Supporting Framework Terrestrial Reference Frame is ‘Critical Infrastructure’ for all Earth science research and applications. Global.
E-VLBI: A Brief Overview Alan R. Whitney MIT Haystack Observatory.
Kenneth Johnston US Naval Observatory Presented by Jules McNeff International Committee on GNSS Provider’s Forum Bangalore, India 4 September 2007 GPS.
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Pasadena, California CLARREO GPS RO/AJM-JPL.
Figure 3. Overview of system architecture for RCMES. A Regional Climate Model Evaluation System based on Satellite and other Observations Peter Lean 1.
Astrochemistry with the Upgraded Combined Array for Research in Millimeter-wave Astronomy D. N. Friedel Department of Astronomy University of Illinois.
3rd International VLBI Technology Workshop November Groningen/Dwingeloo, The Netherlands DSCC VLBI PROCESSOR (DVP) J.E. Clark 1, C. García-Miró.
Objectives  Distinguish between Accuracy and Precision.  Determine the Precision of Measured quantities.
NASA, CGMS-44, 7 June 2016 Coordination Group for Meteorological Satellites - CGMS SURFACE PRESSURE MEASUREMENTS FROM THE ORBITING CARBON OBSERVATORY-2.
上海天文台 Shanghai Astronomical Observatory CVN in Chang’e-3 lunar exploration mission ZHENG Weimin Shanghai Astronomical Observatory, Chinese.
Aurore Sibois and Shailen Desai
e-VLBI: Creating a Global Radio Telescope via High-Speed Networks
Interferogram Filtering vs Interferogram Subtraction
WHY DOES THE IGS CARE ABOUT EOPs?
Agenda Background and Motivation
Presentation transcript:

1 DSN Network e-VLBI Calibration of Earth Orientation L. D. Zhang a,b, A. Steppe a, G. Lanyi a Presentation at 5-th International e-VLBI Workshop Westford, MA September 19, 2006 a. Jet Propulsion Laboratory, California Institute of Technology, Pasadena, California b. Columbus Technologies, Pasadena, California

2 Summary Background: TEMPO –JPL navigation drives requirement of UT1 knowledge –Current tape-based TEMPO meets NAV requirement (Current performance: 5-7 day latency with 1 cm UT1 uncertainty) e-VLBI TEMPO R&D tests –Wide-band VLBI Science Receiver (WVSR) digital recording –DSN T1-line (3 Mbits/s) data transfer –Software correlation –Performed ~ 10 successful tests –UT1 calibration of 1.5 day latency, ~ 1.5 cm uncertainty –Test limitation Conclusion: performance to improve –T3-line to be operational (45 Mbits/s) –Platform upgrade and software automation

3 Background: TEMPO Earth Orientation UTPM –GPS constellation provides continuous polar motion tracking –VLBI remains the best method of calibrating UT1 –Deep space network Goldstone-Madrid baseline suited for measuring UT1 –JPL Time/Earth Motion Precision Observation (TEMPO) bi- weekly VLBI performed on this baseline –JPL deep space navigation drives requirement of real time UT1 knowledge (30 cm) –TEMPO designed to meet this requirement –TEMPO is tape-based

4 Background: TEMPO Facts about current operational TEMPO –TEMPO accurately measures UT1, to ~ 1 cm, at the time of calibration –But latency causes calibration to be less valuable Tape transit time, total turnaround can be up to 7 days UT1 real time knowledge error grows ~ 1 cm / day –Latency is key to improve UT1 real time knowledge Less accurate but quicker turnaround calibration can be better –Recent e-VLBI TEMPO test is designed to leverage existing Delta-e-VLBI (DDOR) infrastructure to obtain EOP data

5 Background: UT1 Knowledge Error Figure: UT1 error predicted by Kalman Earth Orientation Filter (KEOF). The error grows approximately ~ 1 cm per day. At 5 day latency, the knowledge error is ~ 5 cm. (Courtesy of Richard Gross) Current data latency enables ~ 5 cm UT1 real time knowledge error (at time of delivery) Example: a 2 cm calibration accuracy with 1 day latency enables ~ 3 cm UT1 real time knowledge error

6 e-VLBI: WVSR TEMPO Overview Observation sequence design Similar or shorter than TEMPO Digital Recording Instrument –JPL VLBI Science Receiver (VSR) –VSR bandwidth ~ 110 MHz –Wide-band VSR (WVSR) bandwidth ~ 500 MHz –VSR for S-band, WVSR for X-band recording DSN T1-line (3 Mbits/s) data transfer Software correlation on simple Solaris platform (4 processors) Fringe fitting (standard JPL ‘Fit’ code) Parameter estimation (MODEST) Obtain 2-component UTPM calibration Use an equivalent UT1 measurement error  as performance metric

7 e-VLBI: WVSR TEMPO Turnaround WVSR TEMPO R&D test - turnaround time breakdown Number of Scans Experiment Duration (h) T1 Data Transfer (h) 4-Processor Parallel Processing (h) Fringe Fit & Estimation (h) Total Turnaround (day) ~ 20< 10< 3< ~ 36< 17< 3~ 2.5

8 e-VLBI: WVSR TEMPO R&D Tests List of WVSR TEMPO tests recently performed (Exp. time includes time for both experiment setup/teardown and quasar observation) Exp TypeExp Date# of ScansExp. Time (h)UT1 Meas. Err (cm) WVSR TEMPO TEMPO piggyback N/A1.05 TEMPO piggyback N/A1.15 WVSR TEMPO WVSR TEMPO WVSR TEMPO WVSR TEMPO WVSR TEMPO WVSR TEMPO WVSR TEMPO

9 WVSR TEMPO Test Conclusion R&D Test Initial Conclusion scan observation day latency (T1 line) - UT1 measurement error cm (uncertainty ~ 1/sqrt(# of scans)) Compare tape TEMPO - WVSR TEMPO performance comparable - Slight degradation of accuracy when observing time < 3 hours But: e-VLBI has much quicker turnaround e-TEMPO ~ 2 days vs. tape-based TEMPO ~ days Performance of e-TEMPO better than tape-TEMPO better meets NAV requirement with latency improvement

10 Conclusion Current e-VLBI TEMPO limitation –DSN network transfer speed - 3 Mbits/s –# of processors for software correlation –Processing is not automated Coming improvements –DSN T3 line installed - 45 Mbits/s –Platform enhancement (Beowolf cluster bought, can add # of processors) –Software automation planned Future Prospect –Expect better than 1.5 cm accuracy and < 1 day turnaround