Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.

Slides:



Advertisements
Similar presentations
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev May 7, 2007.
Advertisements

LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
LR Summary and LQ Plan Jesse Schmalzle w/ contributions from: J. Muratore (BNL) P. Ferracin (LBNL) October 18, 2007.
Q1-Q3 Cryostat Ideas Mike Anerella / Paul Kovach / Jesse Schmalzle November 5, 2013.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
MQXFS Assembly Procedure J.C Perez 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba N. Bourcey, D. Cheng, B. Favrat, H. Felice,
SQXF Shell & Yoke Assembly Procedure
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
1 Collar Pack #2 Disassembly Incident Summary and Plan Helene Felice Heng Pan, Dan Cheng, Xiaorong Wang, Soren Prestemon, Maxim Martchevsky, Ahmet Pekedis,
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
SQXF Winding Test Proposal Concept at LBNL Dan Cheng Sept 17, 2013.
Helene Felice, Dan Cheng Support structure modifications Update on discussion at CERN.
Dan Cheng 6/11/2015 QXF coil measurements plan at LBNL.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
H. Felice, D. Cheng, H, Pan, M. Reynolds, A. Pekedis, T. Lipton MQXFS1 update 07/27/2015.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
Dan Cheng, Helene Felice HL-LHC Standards and Best Practices Workshop June 11-13, 2014 The US LARP Collaborative Effort Magnet Design and Engineering Tools,
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
LARP Collaboration Meeting Racetrack Coil Fabrication
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. De Ponte, H. Felice, S. Kincaid, T. Lipton, S. Myers, A. Pekadis, M.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
1 MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Options for modifications to parts and procedures Options for modifications to.
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Magnet Fiducialization.
Dan Cheng S. Kincaide, H. Felice, X. Wang 4/23/2015 MQXFS Mechanical Interfaces (Proposed)
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
Dan Cheng, Xiaorong Wang 12/15/2015 MQXFA Connectors Discussion Part II.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
Coil-pack assembly procedure Paolo Ferracin LQS01 readiness review #3 Assembly LBNL July 28, 2009.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
QXF Coil working group 2/11/16 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Coil Fiducialization Proposal.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
Helene Felice With input from Dan C, Maxim… Possible options for coil wiring.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
HQ02a Magnet Interfaces at FNAL D.W. Cheng 3/6/2013.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
LARP Internal Review of the MQXFA Mechanical Structure Design and Functional Requirements 7/16/2015 Dan Cheng, Helene Felice Development of the Shell-Based.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
QXF Coil Fabrication & Tooling Reaction / Impregnation
HLTS Kickoff Presentation Derek Bridges Bobby Moore July 7, 2011
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
T400 Motor Replacement.
MQXF updates P. Ferracin October 9th, 2014.
Bunker Wall Design Wall ESS
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
SNS PPU Cryomodule Space Frame
Presentation transcript:

Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update

Outline 7/10/2014Magnet Assembly Coil Handling2 Assembly requirements & constraints Status update since the CM

Assembly Requirements, Coilpack Handling 7/10/2014Magnet Assembly Coil Handling3 Impregnated Coil Parameters – OD: mm; ID: mm – Length: SQXF: 1.5 m LQXF: 4.3 m – Weight: SQXF ~130 lbs / 60 kg LQXF ~375 lbs / 170 kg Handling operation requirements – Single coils, bore-side down – Single coils, bore-side up – Coil pairs, bore-side down – Coil pairs, bore-side up – Eliminate manual coil flipping operations – Accommodate and install alignment keys & shims, Ground Plain Insulation (GPI) at assembly – Accommodate bore-side instrumentation (SGs, etc.) at assembly

LARP Magnet Assembly Experience 7/10/2014Magnet Assembly Coil Handling4 Tooling and processes developed from prior magnets – Based on experience from TQS, HQ, LR, LQ Utilizes already-designed tooling – FNAL rollover tooling designs, with some design modifications – Existing lifting hardware (SQXF, LQ, etc.) Differences expected in QXF assemblies: – GPI installation will be incorporated in these coils – SQXF handling tooling should be scalable towards LQXF and production assemblies

7/10/2014Magnet Assembly Coil Handling5 BNL Lifting Tooling Update Fixture has been re-analyzed by BNL Safety sign-off and proof load test at LBNL is in process

7/10/2014Magnet Assembly Coil Handling6 FNAL Coil Rollover Tool Modifications Modify cradle for SQXF diameters Add cradle cutouts at 45°, 2 places Move support rollers inboard, 2 places Create new coil support mandrels Two wheel set pairs required for SQXF coil handling operations (four wheels total) Six to eight wheels sets may be needed for LQXF

7/10/2014Magnet Assembly Coil Handling7 Rollover Assembly, Modified FNAL Removable “shelf” support for coil midplanes Supports can be adjusted to optimize longitudinal position Pins and/or screws for positively positioning coils Mandrel and lifting beam to have silicon rubber layers for protecting coil

7/10/2014Magnet Assembly Coil Handling8 Rollover Assembly, Modified FNAL

7/10/2014Magnet Assembly Coil Handling9 GPI Scheme Updated

Tooling and Assembly Concept Summary 7/10/2014Magnet Assembly Coil Handling10 Conceptual SQXF coilpack assembly steps presented at CM is currently unchanged – See additional slides (or CM presentation) – GPI scheme has been simplified since CM Status – BNL designed lifting tooling is in process of being qualified – Rollover tooling is in procurement stages 4 sets to be purchased for SQXF Additional sets can be purchased for LQXF operations

Additional Slides 7/10/2014Magnet Assembly Coil Handling11

7/10/2014Magnet Assembly Coil Handling12 Coil Prep, From Shipping to Instrumentation Operation: – Clamp rings placed over coil Coil will have: – VT wires attached – No SGs or GPI

7/10/2014Magnet Assembly Coil Handling13 Coil Prep, From Shipping to Instrumentation Operation: – Wheel assembly rotated 180° Coil will have: – VT wires attached – No SGs or GPI

7/10/2014Magnet Assembly Coil Handling14 Coil Prep, From Shipping to Instrumentation Operation: – Clamp & mandrel removed Coil will have: – VT wires attached – No SGs or GPI

7/10/2014Magnet Assembly Coil Handling15 Coil Prep, From Shipping to Instrumentation Operation: – Lifting “spuds” placed onto coil Lifting spuds attached in three locations Coil will have: – VT wires attached – No SGs or GPI

7/10/2014Magnet Assembly Coil Handling16 Coil Prep, From Shipping to Instrumentation Operation: – Coil lifting beam brought to coil Recycled LQ coil lifting strongback (~3.3 m) Redesigned coil interfaces, 3 places Coil will have: – VT wires attached – No SGs or GPI

7/10/2014Magnet Assembly Coil Handling17 Coil Prep, From Shipping to Instrumentation Operation: – Beam and “spuds” engaged via inserted pins Pin engagement through hole in tooling and spud Coil will have: – VT wires attached – No SGs or GPI

7/10/2014Magnet Assembly Coil Handling18 Coil Prep, From Shipping to Instrumentation Operation: – Coil lifted and moved to work area Later steps not shown: Strain gage installation, Wiring & connectorization, QA Coil will have: – VT wires attached – No SGs or GPI

Between receiving coils and assembly, a number of steps will have occurred (but not described here) – Coils will be instrumented with SGs – Wiring and connectors will be added – Coil QA will be performed – Coils will go into storage trays, bore-side up 7/10/2014Magnet Assembly Coil Handling19 Intermediate Coil Steps, Before Assembly

7/10/2014Magnet Assembly Coil Handling20 Coil Prep, From Storage to GPI Installation Operation: – Coil placed into rotation wheel Steps not shown: Coil lifted and moved from storage tray Coil will have: – VT wires attached – SG & wires on bore-side – No GPI Strain gages and wiring will be mounted on bore-side

7/10/2014Magnet Assembly Coil Handling21 Coil Prep, From Storage to GPI Installation Operation: – Mandrel & clamps installed over coil Coil will have: – VT wires attached – SG & wires on bore-side – No GPI (Alternate clamping mandrel pictured here) Clearances for SG wiring not shown

7/10/2014Magnet Assembly Coil Handling22 Coil Prep, From Storage to GPI Installation Operation: – Rotation wheel rotated 180° Coil will have: – VT wires attached – SG & wires on bore-side – No GPI

7/10/2014Magnet Assembly Coil Handling23 Coil Prep, From Storage to GPI Installation Operation: – Clamps removed from around coil Coil will have: – VT wires attached – SG & wires on bore-side – No GPI

7/10/2014Magnet Assembly Coil Handling24 GPI, Alignment Key Installation Operation: – GPI and alignment keys installed Relief clearances required for GPI installation For diagram purposes only. GPI & Alignment key (and shims)installation detailed in GPI talk (Jesse) and coil assembly talk (Helene)

7/10/2014Magnet Assembly Coil Handling25 Coilpack Assembly, Pairing Bottom Coils Operation: – Move coil from 2 nd rotation wheel Coil will have: – VT wires attached – SG & wires on bore-side – GPI and alignment key Second Rotation wheel assembly

7/10/2014Magnet Assembly Coil Handling26 Coilpack Assembly, Pairing Bottom Coils Operation: – Rotate coil by 45° Coil will have: – VT wires attached – SG & wires on bore-side – GPI and alignment key Note: Coil may have clamps installed, or may be bolted thru during rotation operation

7/10/2014Magnet Assembly Coil Handling27 Coilpack Assembly, Pairing Bottom Coils Operation: – Pick up second coil with GPI/key Coils will have: – VT wires attached – SG & wires on bore-side – GPI and alignment key

7/10/2014Magnet Assembly Coil Handling28 Coilpack Assembly, Pairing Bottom Coils Operation: – Mate second coil to the first one at 45° Coils will have: – VT wires attached – SG & wires on bore-side – GPI and alignment key

7/10/2014Magnet Assembly Coil Handling29 Coilpack Assembly, Pairing Bottom Coils Operation: – Mate second coil to the first one at 45° Coils will have: – VT wires attached – SG & wires on bore-side – GPI and alignment key

7/10/2014Magnet Assembly Coil Handling30 Coilpack Assembly, Pairing Bottom Coils Operation: – Replace clamps and rotate coils 135° Coils will have: – VT wires attached – SG & wires on bore-side – GPI and alignment key

7/10/2014Magnet Assembly Coil Handling31 Coilpack Assembly, Pairing Bottom Coils Operation: – Remove clamps and mandrel support Coils will have: – VT wires attached – SG & wires on bore-side – GPI and alignment key

7/10/2014Magnet Assembly Coil Handling32 Coilpack Assembly, Pairing Bottom Coils Operation: – Attach lifting beam to coil pair Coils will have: – VT wires attached – SG & wires on bore-side – GPI and alignment key Clamps may need to be removed during lifting operation, due to presence of alignment keys Clearances for SG wires may be necessary

7/10/2014Magnet Assembly Coil Handling33 Coilpack Assembly, Pairing Bottom Coils Clamps may need to either be modified, or removed during lifting operation, due to presence of alignment keys Operation: – Lift coil pair; move to collar stack Coils will have: – VT wires attached – SG & wires on bore-side – GPI and alignment key

7/10/2014Magnet Assembly Coil Handling34 Coilpack Assembly, Pairing Bottom Coils (HQ) First collar stack Operation: – Place coil pair onto collar stack Coils will have: – VT wires attached – SG & wires on bore-side – GPI and alignment key Collars will have: – Additional Kapton/G11 layers

7/10/2014Magnet Assembly Coil Handling35 Coilpack Assembly, Pairing Upper Coils Operation: – Rotate coils by 45° opposite direction Coils will have: – VT wires attached – SG & wires on bore-side – GPI and alignment key

7/10/2014Magnet Assembly Coil Handling36 Coilpack Assembly, Pairing Upper Coils Operation: – Align coil pair lifting strongback Coils will have: – VT wires attached – SG & wires on bore-side – GPI and alignment key

7/10/2014Magnet Assembly Coil Handling37 Coilpack Assembly, Pairing Upper Coils Operation: – Attach coil pair lifting strongback Coils will have: – VT wires attached – SG & wires on bore-side – GPI and alignment key

7/10/2014Magnet Assembly Coil Handling38 Coilpack Assembly, Pairing Upper Coils Recycled LQ coil pair lifting strongback (~3.3 m) Hold down tooling (bolts, pins) may have to be removed before coils can be lifted Operation: – Lift coil pair with lifting strongback Coils will have: – VT wires attached – SG & wires on bore-side – GPI and alignment key

7/10/2014Magnet Assembly Coil Handling39 Upper Coils & Collaring Assembly (HQ) Operation: – Mate coil pairs together – Support with angle irons Coils will have: – VT wires attached – SG & wires on bore-side – GPI and alignment key

7/10/2014Magnet Assembly Coil Handling40 Upper Coils & Collaring Assembly (HQ) Operation: – Bolt collars (with shims, GPI, etc.) – Bolt load pads Coils will have: – VT wires attached – SG & wires on bore-side – GPI and alignment key Collars will have: – Additional Kapton/G11 layers

7/10/2014Magnet Assembly Coil Handling41 Coilpack Assembly, Collar Assembly (HQ) Operation: – Coilpack ready for insertion

Tooling and Assembly Concept Summary 7/10/2014Magnet Assembly Coil Handling42 Conceptual SQXF coilpack assembly steps presented – Key interfaces identified at operation stages Reuses exiting tooling designs – LQ lifting hardware (for SQXF), however for LQXF may require new tooling – FNAL rollover tooling will have modifications made to accommodate the SQXF coils Scalability – Both SQXF rollover tables can be reconfigured to accommodate one LQXF coil, and one more set can be purchased for the second rollover assembly needed in LQXF – LQ lifting hardware can either be extended to accommodate 4.3m long coils, or… – (Preferable) New, dedicated strongbacks can be designed