Inflatable DST Equipment An Overview Presentation.

Slides:



Advertisements
Similar presentations
Completion Agenda At the end of this presentation, you will be able to: Define completion Describe the process of completion List and define the different.
Advertisements

Well Design PE 413 Surface Equipments and Placement Techniques
V-backed stainless steel screen pump intakes: The following Evolution Oil Tools inc product is a screen assembly to prevent large solids from entering.
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Coal Bed Methane (CBM) Permeability Testing WTN Network Meeting April , 2011 ExxonMobil Exploration / Well Testing Team.
MANAGED PRESSURE DRILLING PRESENTATION ______________________________________________________________________ A Continuous Circulating Concentric Casing.
Trican’s Burst Port System (BPS) (Patent Pending) A Cost Effective Method for Horizontal Well Stimulation Lewis Facca / Scott Sherman October 14, 2010.
1 TIW CORPORATION A PEARCE INDUSTRIES COMPANY P.O. Box Houston, Texas U. S. A.
“ Unusual Interventions ” Jenna Robertson ICOTA Canada Roundtable October 14, 2010.
Drilling Engineering – PE311 Circulating System
© Blue Graphics Concept Sauer-Danfoss START-UP PROCEDURE PROPEL PUMP Instruction Sauer-Danfoss Belgium – T. Van Mossevelde.
Terra Slicing Technology Overview.
Simple Pressure Control Valves
Should Horizontal Wellbores be Logged? An analytical approach to hydraulic fracturing entry positioning and completion equipment selection.
PETE 411 Well Drilling Lesson 5 Hole Problems.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
Selective Fracturing of a Series of Perforations in a Horizontal Well Using a Resettable Straddle System SPE Josh Thompson Weatherford International.
INFLATABLE DST EQUIPMENT
Component Rebuilds John Richards Cashman Product Support Representative Lyle Kibbe Cashman Service Supervisor A Guided Tour Through Cashman Equipment.
Optimising Hydraulic Energy to Dramatically Improve Lateral Reach.
ZF-100 The Paraffin & Asphaltene Solution. ZF-100 The Paraffin & Asphaltene Solution 72% Biodegradable, environmentally friendly ZF-100 is an aggressive.
RIG PROCESSES  Drilling, Coring, Directional Drilling & Survey.  Tripping, Wash & Ream, Fishing.  E- Logging.  Casing & Cementing.  Perforating &Testing.
Drilling Engineering – PE311 Rotary System
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
Enhanced Oil Recovery using Computerized Hydraulic Lift Systems
STEAM HEATING.
Lesson 25 Well Control, cont’d
Well Testing Initial production tests at surface after wellbore cleanup and fracing. Sometimes called initial potential or IP. IP= Initial Production IPF.
1 New Production Technologies for Lifting Liquids from Horizontal Wells Radius Energy, LLC May, 2015.
WELL PROBLEMS.
Fishing Technology.
Well Design PE 413.
HVAC523 Basic Subsystems.
1 Petroleum Engineering 406 Lesson 13 Shallow Water Flows.
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
John N. Dougherty, PG Lisa Campbell, PG EPA Region 2, New York City
Casing Design.
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
Chapter 5 Drilling Techniques and Drilling Problems
Confidential to Subsea Mudlift Drilling JIP11/6/00DGD Template 1 of 64 Dual Gradient Drilling Basic Technology Lesson 1 Introduction to DGD Jerome J. Schubert.
ARTIFICIAL LIFT METHODS
Kick Submited to :- Submitted by:- Er Akash Rana Devahish Yadav B.Tech IIIrd Year Petroleum Technology 1.
Presentation on “ELEMENTS OF PRODUCTION ENGINEERING”
Lecture 10 Production Engineering
Oil and Gas Production 1 PRO 250 PowerPoint presentation created by Dr. Shauna Kocman used in CMC PRO250 with her permission under Creative Commons License.
VALVES IN PIPE LINES.
DOWNHOLE EQUIPMENT FOR CONPLICATED CONDITIONS
Oil-Field Hydraulics Chapter 2 Production Equipment
Chapter 6: Hydraulic Cylinders and Cylinder Cushioning
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
Using an Inflatable Element
Hydraulic Fracturing 101.
Cementing How it is Done
SUSTAINABLE DRILLING OF OIL & GAS WELLS
HYDROSTATIC DEVICE FOR
OBJECTIVES State the principles of vacuum and the vacuum booster theory. Discuss how a vacuum brake booster operates. Discuss the vacuum booster operation.
Oil-Field Hydraulics Chapter 8 Shut-in Procedures
Scope / History Well 25/11-G-18 was drilled nov The well has 7” Bakerweld 140 Screens and swell packers. The well is producing gas from the “heal”
ADVANTAGE BRIDGE/FRAC PLUG S
Actuators & Directional Control Valves
Well Design - PE 413 Surface Equipments and Placement Techniques
STV-4 Series Rotary Lock Traveling Valve Eliminates ALL Gas Lock!
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
New Oil and Gas Drilling and Production Technologies
GENERALPIPINGREQUIREMENTS:. Designing and erecting an efficient piping system requires certain aspects/ requirements which could be found in our PME handbook…
Design Calculations Combination Strings
Whipstock. AGENDA DefinitionComponents Operation Sequence 2.
Presentation transcript:

Inflatable DST Equipment An Overview Presentation

Inflatable Drillstem Testing Highlights Confirms the presence of commercial volumes of hydrocarbons Provides accurate readings of pressure and temperature values in well bore Manufactured to meet the requirements of sour service Designed to run in vertical, deviated and horizontal well bores 1 of 2

Inflatable Drillstem Testing Highlights Inflatable Straddle Packers function to achieve selective zonal isolation Capable of testing multiple zones in one downhole trip Saves costs of casings, perforating and setting bridge plugs if the well is water bearing or unproductive 2 of 2

Sample Drillstem Testing String 1. Bar Drop Reverse Circulating Sub 2. Over Pressure Kill Reverse Valve 3. Hydraulic Downhole Shut-in Tool 4. Bottom Hole Sampler 5. Recorder Carrier 6. Squeeze Relief 7. TD Hydraulic Jars 8. Safety Joint 9. Downhole Inflate Pump 10. Screen 11. Inflatable Upper Packer 12. Recorder Carrier 13. Interval Spacing with Bypass Pipe 14. Inflatable Bottom Packer 15. Drag Spring

Component Overview The Bar Drop Sub is designed as a back-up circulating device to reverse out the string. To function, a bar is dropped from surface through the test string. It shears a knock-off rod inside the tool. Once sheared it is then possible to reverse or forward circulate. Bar Drop Reverse Circulating Sub 1 of 3

Component Overview Bar Drop Sub only functions in a vertical position. If not possible to run the Bar Drop Sub in vertical position, a rupture disc must be run in place of the knock-off rod. The rupture disc is a shear style disc that bursts at a predetermined value. Bar Drop Reverse Circulating Sub 2 of 3

Component Overview To rupture the disc, pressure the test string up to and beyond the predetermined shear value. Once ruptured the string will allow you to reverse or forward circulate. Bar Drop Reverse Circulating Sub 3 of 3

Component Overview A downhole valve that allows for multiple openings and closings. The Shut-in Tool allows running into the hole with an empty test string. This eliminates the hydrostatic pressure on the formation at setting depth. Hydraulic Downhole Shut-in Tool CLOSED OPEN 1 of 3

Component Overview Functioned by slacking weight on the multiple shut- in tool. When weight is slacked off ( E.G. 10,000 lbs for five minutes) the valve will open. To close, pick the string back up to the neutral weight and the valve will close immediately. Hydraulic Downhole Shut-in Tool CLOSED OPEN 2 of 3

Component Overview The tool is also used to achieve periods of flow and downhole shut-in during testing, eliminating false data from the test string wellbore storage. The designed delayed tool opening avoids accidental activation while running in the hole. Hydraulic Downhole Shut-in Tool CLOSED OPEN 3 of 3

Component Overview The primary circulating device that allows the reversing out of hydrocarbons from the DST string following a successful test. Functioned by a pressure activated internal sleeve that shifts to open six circulating ports. Over Pressure Kill Reverse Valve 1 of 2

Component Overview After you apply the predetermined amount of pressure to open the valve, the DST string can be either forward or reverse circulated. Over Pressure Kill Reverse Valve 2 of 2

Component Overview Designed to capture a downhole fluid sample. Works in conjunction with the Hydraulic Multiple Shut-in Tool. Captures a sample of the last formation tested prior to tripping out of the well. Bottom Hole Sampler 1 of 2

Component Overview This is an optional tool to be run during testing at the client’s request. Bottom Hole Sampler 2 of 2

Component Overview Carries and protects the downhole memory guages. Each Recorder Carrier can house three guages. Can be placed at any location in the test string. Carriers can be run at multiple locations on the DST string. Locations based on clients’ data collection requirements. Recorder Carrier INTERNAL EXTERNAL

Component Overview The Squeeze Relief Sub is run in the DST string to effectively allow the upper and lower packers to equalize while running in and out of the well. Squeeze Relief Sub

Component Overview Run in the DST string to provide a means of jarring and freeing of stuck tools in the event of downhole issues. Functions by applying an over-pull to the string. When the tool is pulled into tension, a metering system inside the Jars slowly extends until a free point is reached. TD Hydraulic Jars 1 of 2

Component Overview Once the free point is reached, the tools provide the effect of a hammer striking an anvil. This gives a downhole “jar” to the tools. The Jars can be functioned several times if required. TD Hydraulic Jars 2 of 2

Component Overview Designed for use in extremely rare emergency systems where the DST DHA is stuck and unable to be freed using conventional methods. This tool allows you to back- off the stuck BHA with several hand rotations and pull out of the hole allowing recovery of all tools located above the Safety Joint. Safety Joint 1 of 2

Component Overview The lower portion of the DST string can be recovered with larger Jars or fishing tools once the BHA is recovered. Safety Joint 2 of 2

Component Overview Designed to inflate the upper and lower packers. Capable of multiple inflation and deflations in one trip. Functions through the rotation of the DST string aided by the drag string. Dual action piston provides superior pumping capabilities for faster inflation times. Downhole Inflate Pump UP DOWN

Component Overview To be run directly below the Downhole Inflate Pump. Used to filter out debris, and allow only clean drilling fluid to enter the pump and inflate the packers. Screen

Component Overview This assembly provides the upper seal for selective zonal isolation. Inflated by pressure supplied from the Downhole Inflate Pump. The bottom Sub on the packer also provides communication point from the string to the formation of interest. Upper Inflatable Packer

Component Overview Used to space out the packers in order to achieve the appropriate testing interval in the formation of interest. In addition, the Interval Spacing conveys pressure from the upper packer to the lower packer. Interval Spacing with Bypass Pipe 1 of 2

Component Overview Housed in the Interval Spacing is the Bypass Pipe, which allows communication from the upper packer to the lower packer. This prevents the string from getting differentially stuck. Interval Spacing with Bypass Pipe 2 of 2

Component Overview The Bottom Packer assembly provides the bottom seal for selective zonal isolation. The packer is inflated by pressure supplied from the Downhole Inflate Pump. Bottom Inflate Packer

Component Overview Placed at the bottom of the DST string to provide an anchor for the Downhole Inflate Pump. The Drag String stops the bottom of the BHA from rotating. This allows the remainder of test string to be rotated which functions the pump and inflates the packers. Drag Spring 1 of 2

Component Overview The Drag String aids in communication between the upper and lower packer to prevent the BHA from getting differentially stuck. Drag Spring 2 of 2

Contact Information Dylan Winkler – International Sales Manager T C Curtis Makar – Operations Manager T ext 2259 C