1 The Regulatory Authority for electricity and gas:, The Regulatory Authority for electricity and gas: objectives, tasks, independence, accountability.

Slides:



Advertisements
Similar presentations
Empowering People Managing Tradeoffs in Electricity, Oil and Gas Smita Nakhooda Isabel Munilla World Resources Institute 19 Nov 2007.
Advertisements

Implications for the Regions EU-Regional Policy 1 Governance White Paper Introduction Adoption of White Paper on European Governance, July 25, 2001 Aim:
Auditing, Assurance and Governance in Local Government
Jose Braz, ERGEG Conference on Implementing the 3rd Package 11th December 2008 The Agency for the Cooperation of European Energy Regulators.
The fundamentals of EC competition law
GRI NW Stakeholder Group Meeting – 25 November 2011 GRI NW Stakeholder Group Meeting 25 November 2011 Kristóf Kovács The 2014 target and the role of the.
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY Introduction to the Albanian Public Procurement System Central Asia Regional Public Procurement.
Transposition of Consumer Rights ERGEG Monitoring Report Christina Veigl-Guthann, ERGEG Task Force Chair.
Designing independent & accountable regulatory authorities for high quality regulation Regulation of the Irish energy and communciations sectors: some.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
1 Reform of the EU regulatory framework for electronic communications What it means for Access to Emergency Services Reform of the EU regulatory framework.
Recent Trends in Energy Regulation IEA-FTS of Russia Workshop on Global Energy Market Scenarios Paris, 28 May 2009 Kieran McNamara Country Studies Division.
Towards Regional Independent Operators – a main driver for successful market integration.
EU Third Package: background and recent developments 15 th April 2010 UNC Panel European Strategy team.
The Italian Institutional Design for Administrative Simplification HIGH LEVEL REGIONAL SEMINAR ON “STRATEGIES, TOOLS AND CAPACITIES FOR ADMINISTRATIVE.
ZHRC/HTI Financial Management Training
Guido Pier Paolo Bortoni President of Italian Regulatory Authority for Electricity Gas and Water (AEEGSI) UNIVERSAL ENERGY ACCESS A Focus on Universal.
RETHINKING THE ELECTRICITY GRID RETHINKING THE ELECTRICITY GRID 14 May 2012 Presented by: PATRICIA DE SUZZONI ADVISOR TO THE CHAIR OF CRE (French Energy.
0 - Press Conference - Introduction by Mr. Willy Bosmans, President of Eurogas 19 May, 2005, Hotel Hilton Vienna.
Accountability in Finnish administration, introduction Visa Paajanen,
22 February 2007 ERGEG approach to the internal energy market Nick Thompson – Ofgem IFIEC Europe Energy Forum, 22 February 2007.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Empowering People The Electricity Governance Initiative PRAYAS- PUNE ENERGYGROUP Smita Nakhooda 11 May 2007 New York CSD 15.
1 THE THIRD ENERGY PACKAGE – THE ENERGY COMMUNITY APPROACH Energy Community Secretariat 20 th Forum of the Croatian Energy Association and WEC National.
STRUCTURE AND FUNCTIONS OF COMPETITION AGENCIES. GENERAL STRUCTURE OF CA CAs differ in size, structure and complexity The structure depicts power distribution.
How will the Third Liberalization package influence the framework of the regulators? Dr. Annegret Groebel Managing Director and Head of International Coordination.
CEBS in Brief. The Lamfalussy approach The Lamfalussy approach was first implemented in the securities field following the recommendations of the Committee.
Rome Energy Meeting 2008 Rome, November 2008 Investments Opportunities and Project Finance in the Energy Market Luigi Marsullo President Finpublic.
Supervision and regulation of banking system duty is given to a autonomous organization called Banking Regulation and Supervision Agency. BRSA is public.
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
The European regulatory framework and the role of European Energy Regulators in creating an internal energy market Eric DYEVRE Annual conference of Russian.
Recognition: the national centre and the ENIC Network Seminar on the recognition of qualifications Baku, 22 April 2005 Gunnar Vaht Head of the Estonian.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
Regulatory Impact Analysis – Lebanon Working Group IV: Focus Group on Public Service Delivery, Public-Private Partnership and Regulatory Reform Amman,
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY - ANRE Challenges in transitioning to a liberalised, competitive market – Romanian experience.
Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009.
European Commission Introduction to the Community Programme for Employment and Social Solidarity PROGRESS
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
1 GIE Annual Conference Madrid, November 2007 Investing in Europe‘s Future – the Role of Regulators David Halldearn Senior Adviser, European Affairs.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
The New EU Directives Oftel Forum 25/04/02 Heather Clayton.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
The Italian Statistical System 88 th DGINS The future of the European Statistical System Palermo, Italy Palazzo dei Normanni 19 th -20 th September 2002.
1 The Regulatory Authority for electricity and gas: an overview of the legislation The Regulatory Authority for electricity and gas: an overview of the.
Overview of NER and its Future Business Direction Presentation to Standing Committee on Minerals and Energy Parliament 09 May 2001.
Legal developments in the Polish Power Sector Arkadiusz Krasnodębski.
Arnsburger Str. 64, Frankfurt, Germany Tel , Fax Internet:
The Energy Package:– The New Regulatory Framework for Europe International Energy Conference, 12 March 2008 David Halldearn Senior Advisor European Affairs.
For a better built environment 1 Council for the Built Environment.
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
European Labour Law Institutions and their Competencies JUDr. Jana Komendová, Ph.D.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
EU Politics CHAPTER 13: Other Institutions. Outline 1) European Economic and Social Committee (EESC) 2) Committee of the Regions (CoR) 3) European Agencies.
European Insurance and Occupational Pensions Authority Introduction Press Briefing Frankfurt, 10 January 2011.
Energy Community Secretariat Committee on Industry, Research and Energy, European Parliament Energy Community Activities and Outlook for the Future Brussels,
New approach in EU Accession Negotiations: Rule of Law Brussels, May 2013 Sandra Pernar Government of the Republic of Croatia Office for Cooperation.
2016 SWA Meeting of Ministers of Water, Sanitation and Hygiene: Technical Meeting Addis Ababa, Ethiopia, 17 March National accountability mechanisms in.
Autorità per l’energia elettrica e il gas Energy efficiency certificate trading: Food for thought from a recently launched Italian scheme Roberto Malaman,
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY Eighth Regional Public Procurement Forum May, 22-25, 2012 Tirana
Reforms in the Albanian Public Procurement System 7 th Regional Public Procurement Forum Tbilisi, Georgia May 16-19, 2011 PUBLIC PROCUREMENT AGENCY 1.
Harmonised use of accreditation for assessing the competence of various Conformity Assessment Bodies Dr Andreas Steinhorst, EA ERA workshop 13 April 2016,
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 10 – Information society and media.
The Role of the Economic and Social Council of Bulgaria for the Development of Civil Dialogue and New Forms of Consultations Prof. Lalko Dulevski President.
The 3rd package for the internal energy market
Workshop on Regulatory Governance 7 April 2016, Riga, Latvia
Institutions of European Union
European Insurance and Occupational Pensions Authority Introduction
Prof. Lalko Dulevski President of the ESC of Bulgaria
Senior Manager, MEDREG Secretariat
Presentation transcript:

1 The Regulatory Authority for electricity and gas:, The Regulatory Authority for electricity and gas: objectives, tasks, independence, accountability and organisation Fabio Tambone Head of Institutional International affairs 4 th of March 2010

2 THE ITALIAN REGULATOR FOR ELECTRICITY AND GAS role: from where and the evolution independence, autonomy and accountability reporting and dialogue three year plan international commitment third EU energy package Italian regulator: facts and figures AEEG

3 The Regulator sets its own organisation its internal rules and procedures for overall decision-making based on criteria of transparency The Government sets rules and procedures for individual decision-making in order to maximise guarantees Independence, autonomy, accountability (1/3)

4 Independence, autonomy, accountability (2/3) Board appointment: – proposal by the Council of Ministers, approval by two- thirds majority of the relevant Parliamentary Committees – mandate 7-year terms not renewable Financing: –AEEG financed by levy directly from regulated entities which it sets by Law (1/1000 as a maximum of annual revenues, currently fixed at 0,3/1000) –yearly report on financial activities, which audited by Italy’s Court of Accounts Difference between the Board and the operational structure: –AEEG Board (5 Members) defines, addresses and controls all the activities, while the operational structure is in charge of operative and management tasks

5 Independence, autonomy, accountability (3/3) Accountability: –appeal procedure: judgment of first instance in front of Administrative Court; as judgment of second instance in front of the Council of State who delivers final decisions –obligation each year to submit an annual report on the activities to the Parliament and to the Prime Minister –ex-post auditing of accounts by Corte dei conti (National Auditing Office) Transparency: –publication of decisions on AEEG’s website and in the Italian Official Journal –yearly general public hearings –three year Strategic rolling Plan –hearings with stakeholders (companies, consumers, environmentalists, trade unions and business groups) periodically to collect relevant issues and interests and occasionally before major decisions (i.e. tariff reforms) –hearings with Parliamentary Committees (e.g. in case of Parliamentary investigations) to give advice on specific subjects.

6 Regulatory Authority for Electricity and Gas (AEEG) The framework of accountability in AEEG advice, proposals and Annual Report Laws and general policy guidelines Antitrust Competition infring. State Council Regional Administrative Court Regional Administrative Court appeals sentences appeals European Commission active participation directives CEER ERGEG advice and notice complaints Consumers associations & other stakeholders hearings Regulated companies data and information regulation requests for advice Parliament Government & Ministers Government & Ministers President of the Republic formal appointments proposal for appointments approval (2/3) of proposal

7 Reporting and Dialogue (1/2) Institutions: Annual Report Hearings Recommendations

8 Reporting and Dialogue (2/2) Other stakeholders Public Consultation  from 1997 to 2007 have been launched 209 public consultations Regulatory Impact Analysis  in 2007 five RIA were made on: social tariffs, the new regulatory tariff period for electricity service; tariffs for gas distribution; definition of the new load profiling for the electricity service Three years and annual plans Hearings, seminars, forum, focus group

9 Three Year Plan (1/4) National and international scenarios Strategic objectives  operational objectives

10 Three Year Plan (2/4) A) Promoting the development of competitive markets A1 Developing and harmonising the electricity and gas markets A2 Promoting the adequacy of supply and containing the market power in the hands of dominant operators A3 Promoting the setting up of transnational electricity and gas markets A4 Guaranteeing transparent and non-discriminatory access to the regulated infrastructures B) Supporting and promoting the efficiency and affordability of infrastructural services B1 Promoting the adequacy, efficiency and security of infrastructures B2 Guaranteeing the affordability of network services B3 Promoting the efficiency of metering activities

11 C) Protecting energy service clients C1 Managing the complete opening up of the markets from the demand side C2 Guaranteeing universal service and protecting specific client categories C3 Improving service quality levels D) Promoting the rational use of energy and contribute to environmental protection D1 Supporting and disseminating energy efficiency for end use D2 Contributing to sustainable development choices E) Guaranteeing the implementation of regulatory discipline E1 Overseeing the correct application of legislation by regulated subjects E2 Ensuring the implementation of regulatory discipline Three Year Plan (3/4)

12 F) Fostering dialogue with other system actors F1 Developing relationships with institutional subjects F2 Underpinning tools for consultation and dialogue with operators and consumers F3 Strengthening Regulatory Impact Analysis (RIA) F4 Bolstering communication and relationships with the mass media G) Increasing the Authority’s functional and operational efficiency G1 Supporting the development of human resources G2 Improving organisational and financial efficiency. Three Year Plan (4/4)

13 International Commitment CEER/ERGEG Regional Initiatives (Central South ERI, South South- East GRI) SEE/ ECRB MEDREG Twinning Projects (Lithuania,Czech,Turkey,Ukraine) FSR IERN

14 Third EU energy package NRAs’ harmonization towards adequate levels of power, independence, autonomy, accountability. EU Agency of Energy regulators, based on coherent characteristics such as independence, power, accountability.

15 Setting up: 4 December 1996 Operations start: 23 April 1997 Headquarter:Milan Subsidiary office:Rome Staff: currently 134 (max allowed: 180 of which 120 permanent contract) Expenditure in 2007: 38.7 million € Italian Regulator: facts and figures

16 Organisation: current structure