COMMUNITY PRESENTATION

Slides:



Advertisements
Similar presentations
FEMA PROGRAMS II Session Name: FEMA Programs II Coastal Hazards Management Course Amends the Stafford Act Establishes a Pre-Disaster Mitigation Program.
Advertisements

Introduction to the London Borough of Lewisham. The London Borough of Lewisham is situated in the south east of London, including the areas of Lewisham,
Management of future floods at Cockermouth LO: To be able to explain how a specific riverine area has been managed.
Adaptation Action Areas Jim Murley South Florida Regional Planning Council AAA Workshop, August 28, 2014.
Foresight Flood and Coastal Defence Project Government Office for Science Department for Innovation, Universities and Skills Overview by: Colin Thorne.
The Risk is Real… Be PREPARED! Robert Billings, PE, PH, CFM Flood Mitigation Project Manager Charlotte-Mecklenburg Storm Water Services May 18, 2011 Briar.
Cuckmere Estuary Options Modelling Study Cuckmere Pathfinder Project Scott Ferguson Landscape, Visitors, Heritage and Economy of the Cuckmere: Evidence.
In coordination with FEMA Scoping Meeting Lake County, California February 19, 2010.
Ch  Know what design frequency means  Know how to delineate a drainage area on a topographic map 2.
National Centre for Risk Analysis and Options Appraisal Risk Assessment, RASP and IMPACT Ian Meadowcroft.
Hebden Bridge A case study considering the contribution of overland flow processes to flood risk in Hebden Bridge, West Yorkshire.
“Floods - Past and Present Issues” Address given to The Royal Scottish Society of Arts 11th February 2002 Edinburgh by Professor George Fleming FREng FRSE.
Somerset County Council Climate Change Strategy Abigail Stretch Sustainable Development Officer.
The Hydrologic (Water) Cycle. Surface Water Oceans Rivers and streams Lakes and ponds Springs – groundwater becomes surface water.
Question of the day: How is a Tucson flood like a redneck divorce?
The Work of Streams. Erosion Usually happen by streams flowing through their channels and lifting loose particles by abrasion, grinding, and by dissolving.
Flood management. Flood Management Floods occur when discharge exceeds bankfull capacity. Water leaves channel to cover adjacent land – the flood plain.
1 Flood Risk Management Session 3 Dr. Heiko Apel Risk Analysis Flood Risk Management.
Making Space for Water Risk Mapping: Coastal Erosion Tuesday 6th June 2007 LGA SIG Geoff Astle, Environment Agency Jonathan Rogers, Halcrow.
Watershed Assessment and River Restoration Strategies
 Prepared for  City of Palm Coast, Florida  June 24, 2014 Drummond Property Acquisition in Connection With The Land Donation of 70 Laramie Drive From.
1 Flood Hazard Analysis Session 1 Dr. Heiko Apel Risk Analysis Flood Hazard Assessment.
ACTIONS TAKEN BY THE COLOMBO MUNICIPAL COUNCIL FOR REDUCING THE RISKS OF NATURAL DISASTERS IN COLOMBO CITY PRESENTED BY OMAR KAMIL CHIEF CITY ADMINISTRATOR.
Principles of Flash Flood Development: An Introduction to Hydrometeorology Anthony Phillips GEOG 490/590 Ball State University  Hazards associated with.
1 The Delta Plan The Delta Plan Presentation to San Joaquin County Dan Ray Delta Stewardship Council June 19, 2012.
James River in Richmond, Virginia looking upriver from the Robert E. Lee bridge. Belle Isle is on the right, November What is happening in this.
Comprehensive Flood Hazard Management Plan PUBLIC MEETINGS April 5-7, 2010 Rochester, Montesano, and Chehalis.
Introduction to Integrated Catchment Modelling. Modeling is now a pre-requisite to understanding the impact of Urban Development Government Directives.
Floods. How are floods caused? BenefitsPitfalls What are the benefits of living on a floodplain? Fertile farm land Flat land for building Historically,
1 Identifying Properties at Risk of Flooding Duncan McLuckie Principal Flood Specialist NSW Office of Environment and Heritage Department of Premier and.
National-scale quantified analysis of future flood risk in the UK Paul Sayers Head of Floods and Water Management HR Wallingford, UK Jim Hall Professor.
FLOODPLAIN MANAGEMENT AND THE U.S. ARMY CORPS OF ENGINEERS Paul Bourget Directorate of Research and Development Headquarters, U.S. Army Corps of Engineers.
Hydrologic Hazards at the Earth’s Surface
MAXWELL AZONGO AYELIYA. FLOOD This is the natural overflow or overbanks flow of a river. flood is a natural event that can have far reaching effects on.
Alde & Ore Estuary Partnership A partnership set up by the community for the community to protect homes, businesses and our environment from flooding.
What is the hydrological cycle? Key Theme: Rivers Precipitation Condensation Surface Runoff Transpiration Infiltration Throughflow Evaporation Groundwater.
Creek Upgrade Option Meeting with directly affected property owners - Area 3.
Mitigation Directorate FEMA’s Mitigation Directorate and Hurricane Emergency Management The Mitigation Directorate supports Hurricane risk assessment and.
Overview of the Community Rating System Tom Brett.
Meandering Rivers WHAT IS A MEANDER?. Formation of Meanders.
Bath and North East Somerset – The place to live, work and visit Local Flood Representative Meeting 08 October 2015.
FLOODS IN GHANA June 5, 2015 Walter Hays, Global Alliance for Disaster Reduction, Vienna, Virginia, USA Walter Hays, Global Alliance for Disaster Reduction,
2 nd Generation Flood Map Tim Jolley (Head of Hydrology, SEPA) Flooding Issues and Advisory Committee 21 April 2005 Scottish Executive.
Chapter 21 Water Supply, Use and Management. Groundwater and Streams Groundwater –Water found below the Earth’s surface, within the zone of saturation,
March Urban Flood Risk Management. March Objectives Understand the Nature of Flooding & Flood Damage Alleviation Understand the Nature of.
FLOODS IN REPUBLIC OF GEORGIA June 13-15, 2015 Walter Hays, Global Alliance for Disaster Reduction, Vienna, Virginia, USA Walter Hays, Global Alliance.
Planning Commission Study Session: Preferred Plan July 23, 2015.
SURF BEACH CATCHMENT, KIAMA Floodplain Risk Management Study & Draft Plan Community Information Newsletter March 2016 The study area investigated in the.
The River. Natural flowing watercourse, usually freshwater, flowing towards an ocean, a lake, a sea, or another river A river could flow into the ground.
Preliminary Engineering Analysis and Design Foxcroft Colony and Mosby Woods Condominiums Prepared for: City Council Work Session November 3, 2015.
City Council Workshop March 27, 2014 Debbie Vascik, CFM Cahoon Consulting.
MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION Protecting Maine’s Air, Land and Water MAINE.
Watersheds and River Basins
Local Flood Risk Management Strategy
Presentation - Streams
Flood management.
Continuing Authorities Program
COMMISSION FOR HYDROLOGY (CHy)
Introduction to the London Borough of Lewisham
Hazards Planning and Risk Management Flood Frequency Analysis
LT Creek Floodplain Risk Management Study & Plan
Selecting the Level of Involvement
MANAGING YOUR FLOOD RISK All stakeholders contribute to risk reduction
Flood Frequency Analysis
Coastal Management Activities Mr Daly
River Basin Planning & Flood Risk Management in Scotland
Floods and Flood Routing
The Work of Streams.
Mark Adamson Office of Public Works 27th February, 2019
Presentation transcript:

COMMUNITY PRESENTATION FOR TUGGERAH LAKES FLOODPLAIN RISK MANAGEMENT STUDY AND PLAN Presented by - Lara Critchley Senior Planning Engineer (Hydrology) Natural Resources 16 March 2010

Why are we here?? Council is preparing a floodplain risk management plan (the Plan) for the area you live, work or socialise in. An important part of formalising the plan is Community Consultation and community input.

The study area covers all the areas (not just the flood prone areas) around Tuggerah Lake, Budgewoi Lake and Lake Munmorah.

Glossary: Flood – relatively high stream flow which overtops the natural or artificial banks in any part of a stream, river, channel, estuary lake or dam, and/or – local overland flooding associated with drainage before entering a watercourse, and or coastal inundation resulting from super elevated sea levels and or waves overtopping coastline defences excluding tsunami.

Glossary cont: Floodplain: - this is the area subject to inundation by floods up to and including the Probable Maximum Flood (PMF) event. Also referred to as flood prone land. PMF: - is the largest flood that could possibly occur at a particular location, usually estimated from probable maximum precipitation

Porters Creek flooding - October 2004

Ourimbah Creek and Tuggerah Lakes flooding – June 2007

Wyong River flooding - June 2007

Urban flooding – Wyong town centre June 2007

Flood Photos: Urban nuisance flooding - June 2007

What is a Floodplain Risk Management Plan? a management plan developed in accordance with the principles and guidelines of the NSW Floodplain Development Manual (2005). The plan includes information on how particular areas of floodprone land should be managed to achieve specific objectives as well as managing the existing flood risk.

Why do we need a Floodplain Risk Management Plan for Tuggerah Lakes? Reduce the social and financial costs from the risks associated with occupying the floodplain Increase the sustainable benefits of using the floodplain; and Improve or maintain floodplain ecosystems dependent on flood inundation

Steps Involved in Formalising Floodplain Risk Management Study and Plan Formation of a Floodplain Risk Management Committee Plan Adoption and Implementation Floodplain Risk Management Plan Data Collection Floodplain Risk Management Study Flood Study

Flood Study – Tuggerah Lakes catchment Completed in 1994; Design flood levels for PMF, 1%, 5%, 20% and 50% AEP design storm events; Approximately 8,700 properties are affected by flood planning level, Approximately 2,800 properties with floor levels below the flood planning level.

Floodplain Risk Management Study Study for the Tuggerah Lakes area is currently being carried out by WMAWater Analyse all factors and risks associated with flooding Analyse potential risk management options

Flood Risk Management Options Property Modification Measures: Zoning, Voluntary House Raising, Building and Development Controls, Flood proofing Building Response Modification Measures: Community Awareness, Flood Prediction and Warning, Local Flood Plan, Evacuation Arrangements Flood Modification Measures: Retarding Basins, Levees, Channel Improvements, Flood Gates, Opening or dredging the Entrance channel

Floor above Flood Planning Level Property Modification Measures: Floor above Flood Planning Level

Inappropriate Planning Property Modification Measures: Inappropriate Planning

Property Modification Measures: Voluntary house raising so the floor level is above Flood Planning Level

Flood Modification Measures: Culvert upgrades

Flood Modification Measures: Flood Levee at Maclean

How can you help? As an inhabitant of the Tuggerah Lakes area, the community has a key role in the preparation, implementation and success of the Floodplain Risk Management Plan. How? By providing any information in relation to historic flood events or flooding experiences, and/or suggestions of how Council can manage flood prone land.

What are the outcomes of the Plan? Develop a Plan that Reduces flood risk to the community Increases community resilience to flood risk Introduce planning controls that are specific to all flood prone areas in Tuggerah Lakes area. Create greater community awareness that Council is actively involved with floodplain management Provide information for preparing Local Flood Plans – for SES.

Where to from here? Final draft of plan public exhibition for review and comment, Final report and plan  sent to Council for adoption. Adopted plan  implement recommendations, such as planning controls and construction works. The Plan will be reviewed every 5 years

TUGGERAH LAKES FLOODPLAIN RISK MANAGEMENT STUDY AND PLAN Any Questions???

THANK YOU