BOWLINGPARTS.COM Machine parts & services Specials Heavy duty Original standard.

Slides:



Advertisements
Similar presentations
If you drill a hole horizontally through the branch of a tree, you risk weakening the branch. For minimum weakening, drill the hole through the Ch 12-1.
Advertisements

BOWLINGPARTS.COM Machine parts & services Specials Heavy duty Original standard.
Rev. A Control Number XXXXXXXXXXX Effective Date 10/2/2008 Field Work Instructions for Placard replacement Functional Trainer Page 1/4 Revised Date 10/2/2008.
MICE Target Shaft Joint Change l MICE Target Ti shaft »Baseline stock material = drawn tube lower joined to solid upper (rather than manufacture from solid)
Tire Recycling 1. Tire Recycling Line 2 H P Series.
Engineering Drawings & Measurements
Building acoustics Sealing technologies Reinforcement technologies Formwork technologies Spacers Zemdrain®
Tolerance Calculations
Staffan Engström, Ägir Konsult AB Stefan Lindgren, VG Power AB
CSWA
Rolling element bearings A. Lozzi 2012
Bearings.
3 LDC borstplätering LDC Portable Electroplating 1.Cold process: Used at room temperature, no stress or adjustments because.
L1 Support Structure Holding Fixture J. Fast 4/30/03 Revised 8/27/03.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
Determining if a Triangle is Possible. How many different acute triangles can you draw? How many different right scalene triangles can you draw? Recall.
TRAMEC HEAVY DUTY AIR BRAKE HOSE ASSEMBLIES Meets DOT 106 & SAE J1402
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
C F MACHINERY Trade & Services – Import & Export Steel Welded Pipes and Shapes.
CHAPTER 14 Wheel Bearings and Service
Drilling machine.
S.C. KOYO ROMANIA S.A. ALEXANDRIA TELEORMAN
16 LDC borstplätering Tel: Damaged main bearing pocket to an large diesel engine repaired onsite.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
Shafts for rotating machines. Sorting of rotating el. machines According power –Small < 10 kW –middle-class up to 1 MW –big (not correctly specified)
Water jacket to air box crack completed Lower bore repair side A2 needs two more pins and finish work.
Save time and money by purchasing a remanufactured pump. Quality and performance delivered from Ampco pumps.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
SQXF Shell & Yoke Assembly Procedure
Problem-1 A section of commercial steel shafting 2.0 m long between bearings carries a 1000 N pulley at its midpoint, as shown in Figure. The pulley is.
STAINLESS STEEL VESSEL HOUSINGS SANITARY INSTALLATION PARTS SP-AT-3025,3050MHF 정수시스템.
PARAMETRIC MODELING 1.INTRODUCTION TO PARAMETRIC MODELING 2. BASIC FUNCTIONS 3. ADVANCED FUNCTIONS 4. PARAMETRIC AND SMARTEAM.
Customer list includes more than 60% of the major semiconductor manufacturers worldwide.
Perry Lapper Progress. Frame With Actuators Outside Frame.
Activity 1.1.1a Simple Machines
We should abide by the principle of selecting low mobility with the guarantee of construction operation and placing densely. §4.3.4Selection and Classification.
Monolithic suspension assembly procedure (DRAFT) Status 27 th May 2009 LIGO-T v2.
1 Lower Brg Detail Inner cap Bearing Lock Washer 8 = Insulating Tube/ sleeve (slide 6_ * Outer Cap Steel Spacer (slide 4,5) Insulating Spacer (Slide 4,5)
DRIVESHAFTS AND UNIVERSAL JOINTS. CONSTRUCTION u SEAMLESS STEEL TUBING u U-JOINTS AND YOKES u ONE OR TWO PIECE u EXTENSION OF TRANSMISSION OUTPUT SHAFT.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
Handout 10a1 TOLERANCES - Introduction Nearly impossible to make the part to the exact dimension by any means of manufacturing approach  tolerances of.
Educational Services 1 LNN Family Split Case Pumps.
MOTORS PUMPS GEARBOXES VALVES CONTROLS NAHI, LLC - MAIN OFFICE : PROVIDING CUSTOMER DRIVEN SOLUTIONS - Open Loop Pumps Made in USA Models.
The reading is 7.38 mm. The reading is 7.72 mm.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
Activity 4.2.8a Satellite Flight Satellite Robot Construction Guide
Limits and fits.
Major Changes in D27DT Engine
Repair of a slewing bearing
The Rock Cycle.
Status of material tests
Activity on posts at INFN - Milano
MECHANICAL DRAWING WORKING DRAWINGS
Limit, Fit & Tolerance – Numerical Problems
Pin Restrictor System Carbide (threaded) Steel (threaded)
Tubes Dimensions Tube diameters in the range 5/8 in. (16 mm) to 2 in. (50 mm) are used. The smaller diameters 5/8 to 1 in. (16 to 25 mm) are preferred.
Drilling machine.
KIWI PEELER.
Activity 1.1.1a Simple Machines
Woodlane Timber, Hucknall
Activity 4.2.8a Satellite Flight Satellite Robot Construction Guide
MKTG 2016.
Activity 1.1.1a Simple Machines
Microstructures of GaSb grown on SiC and AlN Composite Substrates

Engineering Measurement
LARP Phase II Secondary Collimator RC-0 and RC-1
Modern Automotive Technology PowerPoint for by Russell Krick
Presentation transcript:

BOWLINGPARTS.COM Machine parts & services Specials Heavy duty Original standard

Pivot-Shaft installation part #

Why Pivot-Shaft upgrade?  Original shaft is lower part  Upgrade is upper part  Bendstress up to 3000 N in practice  You need High Quality Steel that is construct for a bendstress up to 5400 N  Spot position guaranteed

Bearing Dimension  All Sleeves and Bearings are prepared for new shaft  New Spacers outside

Pivot Shaft  Shaft is polished  Diameter 17mm  Length is same as original

Shaft Composition

Assembled Pivot

Ready to install….

bowlingparts.com Information :LITO-Techniek Valkstraat KW Overasselt The Netherlands Tel : (0)