T2.4 Performance Test Running in R78. Timeline T2.4 installed in R76 09-11-2010 First inspection on 16-11-2010 after 200k pulses Little or no wear/dust.

Slides:



Advertisements
Similar presentations
Gas Meter Proximity to Electrical Equipment, Apparatus and Cables. To be applied by PNG Sales, Engineering and Installation operatives when locating 6m3/hr.
Advertisements

MICE Magnetic Investigation of T2 MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
Target Operations A summary of Target Operation to Date Paul Hodgson The University of Sheffield.
Are You Smarter Than a ? th Grader? 1,000,000 5th Level Topic 1 5th Level Topic 2 4th Level Topic 3 4th Level Topic 4 3rd Level Topic 5 3rd Level Topic.
Are You Smarter Than a 5 th Grader? 1,000,000 5th Grade Topic 4th Grade Topic 3rd Grade Topic 2nd Grade Topic 1st Grade Topic 400, , ,000.
The MICE Target Lara Howlett University of Sheffield.
MICE MICE Target Status P J Smith CM 25 Wed 4 th November 2009.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
SURFACE AREA and VOLUME of RECTANGULAR PRISMS and CUBES.
Target Operations A summary of Target Operation to Date Paul Hodgson The University of Sheffield.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Target Monitoring and Control Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
MICE Target Report Chris Booth (for target team) Sheffield 24 th March 2010.
Target Real Time software Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
Prepare DORIS for particle physics again F.Brinker, DESY, March 31 st 2008 Injector chain to Doris and Petra Situation at the IP-region Beam optic Work.
Target Update – Mico Meeting Monday 21 st April 2008 General Expect to obtain new coils for stators anytime New Shafts at RAL for metrology. Will be back.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
(a) (b) (c) (d). What is (1,2,3)  (3,4,2)? (a) (1, 2, 3, 4) (b) (1,2)  (3,4) (c) (1,3,4,2) (d) (3,1)  (4,2)
Are You Smarter Than a 5 th Grader? 1,000,000 5th Grade Topic 1 5th Grade Topic 2 4th Grade Topic 3 4th Grade Topic 4 3rd Grade Topic 5 3rd Grade Topic.
Cylinder Head Motorcycle Engineering (021) Overhaul Cylinder Head (SK-KD – 04)
MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
Label the points where the graph crosses the x-axis. x y Problem 1.
My Star POW By, Andrea Wilkinson A2. Question: *H*H ow many triangles and polygons can I find in a six sided star? *P*P lan: *I*I plan to make a six sided.
Are You Smarter Than a 5 th Grader? 1,000,000 5th Grade TOPIC 1 5th Grade TOPIC2 4th Grade TOPIC3 4th Grade TOPIC4 3rd Grade TOPIC5 3rd Grade TOPIC6.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
MICE Target Development Lara Howlett University of Sheffield.
MICE Target l Jason Tarrant – STFC l Investigative work on T2 with plastic bearings »Stopped after >2 million cycles »Disassembly with photographic investigation.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
Jason Tarrant / November 2008 MICE Target Mechanical Design l Jason Tarrant – STFC l Introduction »Investigations into target shaft failure »Current suspicions.
© 2007 M. Tallman. 6 units² Imagine that you were able to take apart this rectangular prism so that all faces lay flat. It might look similar to this.
Motion Graphs, kinematics - 2
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
MICE Target Failure UKNFIC Meeting Adam Dobbs - when and why 4 th July 2008.
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
High Intensity Beam Test of Beryllium for Target and Beam Window Applications Presented by: Brian Hartsell Contributors: Kavin Ammigan, Patrick Hurh NBI.
3.7 Optimization Problems Buffalo Bill’s Ranch, North Platte, Nebraska Greg Kelly, Hanford High School, Richland, WashingtonPhoto by Vickie Kelly, 1999.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
Condition Monitoring of Generators
Aging White-tailed Deer Using Tooth Replacement and Wear.
BEARINGS Suported by. Introduction Different types of bearing are used extensively throughout our machines to join stationary part to a moving part. Suported.
Target Installation Plan
P. J. Smith on behalf of the MICE target team.
Are You Smarter Than a 5th Grader?
Are You Smarter Than a 5th Grader?
Galaxies 19.3.
Are you SMARTER than GRADER ?th.
Objective I CAN solve systems of equations using elimination with multiplication.
Helsinki T2 status Risto Orava/ on behalf of Kari Kurvinen
Are You Smarter Than a 5th Grader?
This is a front view of the impeller inlet

1. Be able to add and subtract rational functions.
Are You Smarter Than a 5th Grader?
Are You Smarter Than a 5th Grader?
Passitivation Location
15 seconds left 30 seconds left 3 minutes left 2 minutes left 1 minute
Beam dump for J-Parc neutrino facility
Surface Area.
VH Prove out tests with data available
Are You Smarter Than a 5th Grader?
Are You Smarter Than a 5th Grader?
Analysis Drift velocity of the SDD Detector
3.7 Optimization Problems
Presentation transcript:

T2.4 Performance Test Running in R78

Timeline T2.4 installed in R First inspection on after 200k pulses Little or no wear/dust seen Target restarted and run for another 400k 2 nd inspection Total pulses at inspection 615k

1 st inspection – Top Bearing

1 st inspection – Top Shaft

1 st inspection bottom of shaft No material visible in this region Dust Catcher

T2.4 2 nd Inspection – Top Bearing

Top Bearing close up Small amount of Material on side of flat

Top Shaft wear surface Smudge of material on wear area of shaft

Bottom Shaft Dust Catcher No material visible in this region

Odd deposit on top of Stator?

Run 2 Minimum Position Some changes seen Min BCD has drifted upwards over time. Pulse to pulse Variability approx. 0.8mm still well within what is acceptable for MICE Thanks to Ed for new DAQ plots

Run 2 Acceleration Acceleration is flat. Variability acceptable. Note that we think we understand difference between old and new DAQ acceleration values.

Comments No significant wear/dust after 600k pulses No new wear seen on 2 nd inspection Was wear seen on 16 th “bedding in” ? Next inspection on Should be over 1 million pulses on clock