Daniele Piazza PLATO TOU Meeting, Catania, 11.06.2014 PLATO - TOU Mechanical Design & Future Activities Osservatorio Astronomico – Catania June 11 th,

Slides:



Advertisements
Similar presentations
Isabella Pagano PLATO TOUs PM Padova, 1 Feb 20101System &TOUs Team Meeting Organization of the TOU team PLATO System & TOUs.
Advertisements

Isabella Pagano & Roberto Ragazzoni -
Catania 28 Feb – 01 Mar 2011 V.Viotto (INAF - Osservatorio Astronomico di Padova) TOU Breadboard Status and Test.
Telescope Optical Units (TOUs)
PLATO PLATO TOU KO MEETING ‎ H. Rauer (DLR PF) H. Kinter/A. Salado (Kayser-Threde)
Crashworthiness and High Strain Rate Material Testing Test Development for Vehicle Crash Conditions Motivation: The current vehicle design approaches result.
CATANIA Feb 28th - Mar 1st 2011 F. Borsa (INAF - Osservatorio Astronomico di Brera) M. Ghigo (INAF - Osservatorio Astronomico di Brera)
Syntec Technologies: Pushing the Polymer Envelope HRDT™ and patent-pending High Refraction Diamond Turning are trademarks of Syntec Technologies.
Test readiness review ESA ’s prototype BLANC P-E LAMLyon October 2003 Mechanical test plan.
G R LIGO Laboratory1 Advanced LIGO Research and Development David Shoemaker LHO LSC 11 November 2003.
Demetrio Magrin INAF – Astronomical Observatory of Padova Optical Design Catania, 11/06/2014.
Fraught with seeming insurmountable challenges even a year ago, 157-nm lithography seems to be nearing feasibility as a production process. The challenges.
Chapter 13 Embedded Systems
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
PLATO Telescope Optical Units Meeting in Bern March 12 th 2010.
Space Frame Structures for SNAP Bruce C. Bigelow University of Michigan Department of Physics 11/04/04.
Construction of efficient PDP scheme for Distributed Cloud Storage. By Manognya Reddy Kondam.
Change Measurement Workbench Introduction January 2012.
1 Mirror subsystem: telescope structure Functions: Functions: Support mirrors subsystem to S/C Support mirrors subsystem to S/C Accommodate cryostat Accommodate.
13 ° COSMO General Meeting Rome VERSUS2 Priority Project Report and Plan Adriano Raspanti.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Intermediate review - ERC – February 9, 2009 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Job done since.
EUSO BALLOON phase A review CNES, Mechanical design of the instrument approach for integration and tests Peter von Ballmoos, IRAP Toulouse.
T1 task- update Mike Plissi. 2 Motivation  Thermo-elastic noise is higher than the ‘intrinsic’ noise in crystalline materials  There are several sources.
© 2012 xtUML.org Bill Chown – Mentor Graphics Model Driven Engineering.
Southwold Enterprises Co.,Ltd. An outsourcing partner committed to your company.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Potting Optical Elements in Cells Eric Booen December 8 th, 2008 OPTI 521.
GE+ PL INTERFACES, RESSOURCES PLATO PPLC/ESA meeting, Feb 27th 2009.
Simulations of the thermal coating on the BK7 window: where we stood in 2011 Daniele Spiga, INAF/OAB.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Daniele Piazza PLATO TOU Meeting, Catania, PLATO - TOU Mechanical Structure Feasibility Osservatorio Astronomico – Catania June 11 th, 2014.
The PC-group (Klaus Attenkofer)
Roberto Ragazzoni INAF – Astronomical Observatory of Padova PLATO: the TOUs (Telescope Optical Units) Kick Off Meeting KOM-Paris,
ELECTRAAdvantages ELECTRA Advantages Intuitive workflow Electra workflow consistently follows standard Civil engineering design process which intuitively.
Jeff Bolognese p1 Super Nova/Acceleration Probe 16 November 2001 Structural Analysis Jeff Bolognese 16 November 2001.
IRMOS Diffraction Grating Integral Tab Design  Performance of an optical system is highly sensitive to the surface distortion of the optics in the system.
1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.
Modelling the Process and Life Cycle. The Meaning of Process A process: a series of steps involving activities, constrains, and resources that produce.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
Advanced Virgo: Optical Simulation and Design Advanced Virgo review Andreas Freise for the OSD Subsystem.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
ATLAS Database Access Library Local Area LCG3D Meeting Fermilab, Batavia, USA October 21, 2004 Alexandre Vaniachine (ANL)
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Concentric Axial Loading OPTI 521L Kal Kadlec Rachel Ulanch.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
5 Space Technolog y May , 2002FEMCI Workshop Nonlinear Analysis of the ST5 Magnetometer Boom Wayne Chen/Code 542 NASA/GSFC.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Solar Orbiter EUS: Thermal Design Progress Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Progress Bryan.
BSRT UPDATE LMC 02-OCT-2012 F.Roncarolo on behalf of the BSRT team W.Andreazza, E.Bravin, A.Boccardi, J-J.Gras, A.Goldblatt, M.Hamani, T.Lefevre, R.Jones,
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Polymer Matrix Composites Matrix Resins and Composite Fabrication
CPA: Decisions, Issues, Next steps Francesco PIETROPAOLO CERN / INFN-Padova Field Cage CPA and Integration/Installation week, BNL, March 11th, 2016.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Athena Italian and CNES/IRAP Meeting
Rose Navarro HMI Lead Thermal Engineer
News and Introduction from CERN June 15th, 2005
CompSci 280 S Introduction to Software Development
Thermal Analysis in Zemax
MECHANICAL FRAME OF THE MVD
TOU Team PLATO Consortium Campi Bisenzio, 12 Dec 2016.
PLATO Mission: TOU Phase B/C1 preliminary KO meeting:Technical Issues
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
T5.2: Harmonization - Material and Component Reference
TEMPERATURE SENSOR LOCATIONS
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
Overview of Advanced LIGO Coating Status
TRL tables: power conversion and lifetime
Presentation transcript:

Daniele Piazza PLATO TOU Meeting, Catania, PLATO - TOU Mechanical Design & Future Activities Osservatorio Astronomico – Catania June 11 th, 2014

Daniele Piazza PLATO TOU Meeting, Catania, Overview  TOU Mechanical Design Overview  Architecture  Materials  Future Activities  L6 failure: Investigation & design improvement  Architecture consolidation: FPA interface, integration, baffle, …  Modelling activities (FEM & TMM)  Prototype lens mounts  Resources Availability

Daniele Piazza PLATO TOU Meeting, Catania, The TOU consists of:  Structural tube  Machined AlBeMeT part (outstanding combination of properties)  Outside gold coated to minimize radiative coupling  Inside black coated to optimize straylight behavior  Thermal connection between FPA and baffle (which acts as radiator)  Lens mounts and interface parts  Multi-finger design to minimize bonding surface and provide isostaticity to the lenses  Materials choice to match the glasses CTE  Isostatic interface to tube to compensate for CTE mismatch  Isostatic mounts to the S/C optical bench  3-points interface to allow alignment by shimming TOU Mechanical Design (1)

Daniele Piazza PLATO TOU Meeting, Catania, TOU Mechanical Design (2)

Daniele Piazza PLATO TOU Meeting, Catania, Materials  Material choice drivers  Main Structure: combination of properties (, CTE, Cp, E)  Lens Mounts: Minimization of thermo-elastic stresses in the lenses (CTE, E)

Daniele Piazza PLATO TOU Meeting, Catania, Future Activities

Daniele Piazza PLATO TOU Meeting, Catania,  During the DM campaign cracks were observed at the four bonded interfaces of L6.  The failure is reproducibele, therefore workmanship can be excluded.  The root cause nees to be identified.  A plausible hypotesis is an excessive bonding area, which leads to high thermo-elastic stresses in the glass.  The flexibility of the mount has to be verified  Breadboards will be used to prove the improvements implemented. L6 failure: Investigation & design improvement

Daniele Piazza PLATO TOU Meeting, Catania, The following points will be investigated to update and improve the design:  FPA interface  The last FPA developments were not considered.  Optics integration  Accessibility, fixation points of dedicated tooling,...  Baffle interface  Requiements consolidation for the interface to the S/C OB.  Handling interfaces for integration at S/C level. Architecture Consolidation

Daniele Piazza PLATO TOU Meeting, Catania,  Currently, at UBE there is a strong team capable of performing mechanical and thermal modelling.  NASTRAN, ESARAD, SYSTEMA available.  Performing FEM and TMM at the same location allows a more efficient and fast optimization of the overall design.  Such activities will be included in our PRODEX proposal. Modelling activities (FEM & TMM)

Daniele Piazza PLATO TOU Meeting, Catania,  UBE is ready to support prototyping activities, e.g. lens mounts with improved design and/or alternative materials.  Small scale BB are, as well, foreseen to verify envisaged design improvements. Prototyping

Daniele Piazza PLATO TOU Meeting, Catania,  Due to the very high work loat at UBE it is not possible to allocate full time personnel to PLATO right now.  To support PDCR (mid March 2015) some resources will be made available. In particular FEM/TMM.  In the second quarter of 2015 experienced personnel will be available for PLATO. Short-Term Planning & Resurces