Saptarshi Bandyopadhyay Project Manager and System Engineer Pratham, IIT Bombay 15 th May, 2011.

Slides:



Advertisements
Similar presentations
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Advertisements

Pratham, IITB Student Satellite Saptarshi Bandyopadhyay System Engineer, Pratham IIT Bombay 27 th August, 2008.
RockSat-C 2012 CoDR Minnesota Sound Wreckers Conceptual Design Review University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson.
Cory Fulkerson (Project Manager) - Mechanical Engineer John Graham - Computer Engineer Clayton Hooks - Electrical Engineer O’Raphael Okoro - Electrical.
FluxDemon FluxDemonSat Fluxgate Magnetometer Core Technology Demonstrator Feasibility Review Student Design Team: Farita Tasnim, Shivani Upadhayay, Jinny.
Payload Design Criteria for the Space Test Program Standard Interface Vehicle (STP-SIV) Mr. Mike Marlow STP-SIV Program Manager Payload Design Criteria.
BillikenSat – II Pico-Satellite that conforms to the CubeSat standard Team Leader: Darren Pais Electrical Eng.: Ben Corrado Payload: Rob Arechederra MISSION:
Page 1 Aalborg University Communication system for the AAUSAT-II Communication System for the AAUSAT-II Kresten K. Sørensen Department.
Department of Aerospace Engineering IIT Bombay. Contents Design of telemetry, beacon and uplink modules Design and fabrication of final Onboard PCBs Allocation.
By: Deepika Thakur. Conceptual design of the Communication Subsystem.
A student satellite initiative Indian Institute of Technology Madras.
Controllers-system for APS - Cube Sat nano-satellite Instructor: Daniel Alkalay Students: Moshe Emmer & Meir Harar.
EEE440 Modern Communication Systems Satellite Systems.
Icarus Student Satellite Project Hannah Goldberg Dr. Brian Gilchrist BT Cesul Student Space System Fabrication Lab (S 3 FL) University of Michigan, College.
PROJECT ICARUS by Noah Michael, Student Project Manager & Dr. Nikos Mourtos, Faculty Project Manager AE 170A/B Course Instructor.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
Icarus Student Satellite Project
Satellite communications and the environment of space Images: NASA.
US Naval Academy LABsats Bob Bruninga, WB4APR AIAA JHU/APL Educational Seminar 10 Nov 2006.
Communication and Ground Station 12 October 2008.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
BHARATI VIDYAPEETH COLLEGE OF ENGINEERING RITESH ANAND SWAPNIL MISHRA PROJECT GUIDE : Prof. A. V. SUTAR.
Technician Licensing Class Talk to Outer Space Page 99 to 104.
The Pursuit for Efficient S/C Design The Stanford Small Sat Challenge: –Learn system engineering processes –Design, build, test, and fly a CubeSat project.
COMS Transceiver – RF DataTech LRT470 Frequency: MHz Operation: Half-Duplex Max. RF Transmit Power: 750mW Typical Power Draw at 750mW RF: 3.5W Bandwidth:
Pratham IITB Student Satellite
1 Project Name Solar Sail Project Proposal February 7, 2007 Megan Williams (Team Lead) Eric Blake Jon Braam Raymond Haremza Michael Hiti Kory Jenkins Daniel.
Student Satellite Project University of Arizona Team Goals Design, Fabricate, and Analyze a Structure that will Support the Payload –Space Allocation of.
08/09/2015PSC 2009 Christmas Reception1 AMSAT-UK’s first satellite.
FluxDemon FluxDemonSat Fluxgate Magnetometer Core Technology Demonstrator Feasibility Review Student Design Team: Farita Tasnim, Shivani Upadhayay, Jinny.
High Altitude Scientific Ballooning (Near Space Engineering)
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
Different Coverage Patterns for a Single Satellite and Constellation of Satellites in Real Time with the STK Pedro A. Capó-Lugo Graduate Student Dr. Peter.
FluxDemon FluxDemonSat Fluxgate Magnetometer Core Technology Demonstrator Feasibility Review Student Design Team: Farita Tasnim, Shivani Upadhayay, Jinny.
2.4 GHz CubeSat Communications System Robert Bui Communications Subsystem Lead.
COMT 3911 Satellite Basics COMT 391 Wireless. COMT 3912 Satellite Components Satellite Subsystems –Telemetry, Tracking, and Control –Electrical Power.
September 20th TJ Faculty Presentation 2006
Technician Licensing Class Talk to Outer Space Lake Area Radio Klub Spring 2012.
Space Engineering 2 © Dr. X Wu, Space Engineering 2 Lecture 1.
By: Christiano Daniel Abadi. Deliverables/Achievements in Spring 2000: 8 Systems Engineering Documents Overall and power budgets Gantt Chart for Preliminary.
DINO PDR 23 October 2015 DINO Systems Team Jeff Parker Anthony Lowrey.
Paul Butler Lauriston Girls’ School.  The FUNcube-1 satellite was designed and built by members of the volunteer amateur satellite organisations AMSAT-UK.
Week 7 Status Updates. Statement of Work: To design and prototype an attitude control system (ACS) for a Cube-Sat. This ACS will align the Cube-Sat with.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
1 University of Maryland DYMAFLEX SHOT II Pre-Flight Presentation June 29, 2012.
Inphase III, Implementation is the main task to be done, starting from the converters designed and simulated in phase II and, going through tests of these.
VSSEC-KDS CanSat France Team Project Manager/Teacher Milorad Cerovac (KDS) KDS Students (Grade 12) Jarred Gerson Kieran Hirsh Josh Marlow Yarden.
Haripriya Head, Integration Team Pratham, IIT Bombay 19 th June, 2010.
Technician Licensing Class Talk to Outer Space Valid July 1, 2014 Through June 30, 2018.
Designing a Communications System for Eagle Lisa Ferguson Dr. Gary Yale, Dr. Ed Post Arizona Statewide Symposium Announcements April 12, 2014.
Idaho Near Space Engineering – Idaho RISE – Brandy Holmes Project Manager David Atkinson Electrical &Computer Engineering Idaho RISE Faculty Coordinator.
EagleSat-1 Continuing Embry-Riddle’s CubeSat Satellite Development Program
Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
Spacecraft Technology Structure
Korea Aerospace Research Institute (KARI)
Simulation-to-Flight 1 Additional Resources:
USNA Standard CubeSat Bus USNA-P1 CubeSat (USNA-14)
USNA Next Generation Ground Station
MSU Solar Physics NSF REU Final Presentation
The COEP Satellite project launched by ISRO
Polar Orbiting INfrared Tracking Receiver Overall Mission Review
Technician Licensing Class
Groundstation workshop : A Flashback
CubeSat vs. Science Instrument Complexity
EagleSat 2 – Mission and Development Overview
System Engineering (Pratham and beyond)
Command and Data Handling
<Your Team # > Your Team Name Here
Presentation transcript:

Saptarshi Bandyopadhyay Project Manager and System Engineer Pratham, IIT Bombay 15 th May, 2011

Student satellite – The Idea!  Aim - To develop a satellite in  a time frame of 2-3 years  be of low cost  low mass (< 10kgs)  launch it into orbit  COTS instruments to reduce costs  Success of mission attached to process of learning, not just final output  Satellites are test-beds for new technology that need space qualification 1.MINI – SPUTNIK 2.ASUSAT 3.NCUBE 4.SSETI 5.AAU Cubesat 6.SNOE 7.ICARUS 8.CATSAT 9.DTUSAT 10.MEROPE 11.COMPASS 12.SEEDS

Mission Statement for Pratham Acquiring knowledge in Satellite and Space Technology. Have the Satellite entirely designed by the student body of IIT Bombay. Have the Satellite launched; measure TEC of the Ionosphere above IITB. Involve students from other universities in our Satellite project.  Create a learning experience of working on a real life multi-disciplinary complex system. Learning enhancement through CDIO (Conceive, Design, Integrate and Operate).

Information about Pratham  Weight: ~10 kgs  Size: 260mm X 260mm X 260mm  Payload: Measuring TEC  Orbit: 10:30 polar sun-synchronous, 817km altitude  Downlink at 2 frequencies  Uplink used as kill switch  4 months mission life

Payload Control PRATHAM Power OBC Thermal Student Team Size: 7 (usually 25) Departments: Aerospace Chemical Civil Computer Science Electrical Physics Mechanical Social Goal Structure Quality Team Integration Team Comm. Core Group (10 members) Core Group (10 members)

Technical Mentors  Prof K. Sudhakar (Aero)  Prof P. M. Mujumdar (Aero)  Prof H. Arya (Aero)  Prof H. B. Hablani (Aero)  Prof S. P. Bhat (Aero)  Prof K. Chatterjee (Elec)  Prof B. G. Fernandes (Elec)  Prof K. N. Iyer (Mech)  Dr K P Ray (SAMEER)  Prof Madhu N. Belur (Elec)  Prof Krithi Ramamritham (CS)  Prof R. K. Pant (Aero)  Prof K. K. Isaac (IIST)  Prof U. N. Gaitonde (Mech)  Prof R. K. Shevgaonkar (PU)  Prof R. N. Banavar (Syscon)  Prof D. K. Sharma (Elec)  Prof R. P. Shimpi (Aero)  Prof Girish Kumar (Elec)  Prof Kavi Arya (CS)  Prof B Bandyopadhyay (Syscon)  Prof C. Amarnath (Mech)

Documentation and Reviews Work done by Pratham Team Once every week Reviewed by the Team Once every month Reviewed by the IITB Faculty Once every 2-3 months Reviewed by the ISAC Engineers End of Design Phase Once every 6-10 months Rigorous reviews by the IITB Faculty Mentors & ISAC Engineers IITB Faculty Mentors: 30 Departments: Aerospace Computer Science Electrical Mechanical Systems and Controls  Major emphasis on documentation since “We want to preserve our knowledge”  All our documents are available on our website

Timeline Concept feasibility proved to IITB Aug 2007 Requirements Capture Phase finished Apr 2008 Conceptual Design Phase finished Aug 2008 Preliminary Design Phase finished Dec 2009 Signed MoU with ISRO Sept 2009 Detailed Design Phase Aug 2010 Launch End of 2011 Oct 07 Sept 08Sept 09 Mar Team Size = Two stage selection process Quiz & Presentation Continuity Plan Documentation Apr 11

D Region E Region F1 Region F2 Region IONOSPHERE Payload Sub-System  Measure Total Electron Count of the Ionosphere over India and France  Expected TEC value is 25±5 TECU (resolution of 0.1 TECU, SNR of 500)  2 polarized radio signals are transmitted parallely  Faraday rotation changes their angle of polarization  The difference in their polarization angles is measured at the ground station

Communication Sub-System  Low bit rate Beacon ( MHz)  CW transmitter, 0.6 Watt power  Resonant Helical/Non-resonant Monopole of 18 cm  High bit rate (1.2kbps) Monopole for downlink of data ( MHz)  FSK transmitter, 0.6 Watt power  Resonant Monopole of 17 cm  NO telecommand  Kill Switch (Uplink) added to satisfy IARU’s constraint for getting license  Resonant Monopole of 17 cm Beacon Crossed Yagi Rotor Base Station

OBC, ADCS and Power OBC Circuit SENSORS SunSensor (LEOS) GPS (ACCORD) Magnetometer (Honeywell) ACTUATOR Magnetorquer ATTITUDE CONTROL Solar Panels On 4 sides (ISAC) Battery (ISAC) Power Circuit

Systems Engineering  System and Sub-System Requirements  Mission Design  Weight Budget  Configuration Layout  Connectivity Diagram  Integration Sequence Mechanical Subsystems  Structural simulation of the satellite under launch loads  Thermal design of the satellite  Integration with IBL230V2 LVI

Testing and Quality Assurance  Electrical Quality ~0.98  From quality calculations, at the end of mission life  Mechanical QA ~1  Validated by testing  Level 1 testing done by individual Subsystems  On Board Computer In Loop Simulations (OILS)  Level 2 testing of Power, OBC, Controls, and Communication  Clean Room built (100,000 class)

Interaction with students from other universities  National Ground station workshops  11 participating universities building Ground Station for Pratham  MHRD Virtual Experiments  2 papers published at the International Astronautical Congress 2010 in Prague  Collaboration with IPGP and Paris Diderot

Organizations Supporting Pratham  ISRO  ISAC  VSSC  IIT Bombay  IRCC  CDEEP  AEA  SAMEER  TIFR  Boeing