1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Data Capturing Infrastructure Stathis Plitsos, AUEB-RC.

Slides:



Advertisements
Similar presentations
A Virtual Power Quality Test Lab Victor Wong Senior Vice President, Transmission Sarawak Energy Berhad.
Advertisements

Taavi Tamberg What is screen? Device User Interface Information Service Innovation.
1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 WP1 “Service monitoring the energy patterns of processes:
Project Stages. Stages Planning Initial Data Collection Situation Evaluation Solution Definition Implementation of Solution Conclusion.
DESIGN AND IMPLEMENTATION OF SOFTWARE COMPONENTS FOR A REMOTE LABORATORY J. Fernandez, J. Crespo, R. Barber, J. Carretero University Carlos III of Madrid.
Experience, Technology and Focus in Mid Market CRM Soffront Asset management: An Overview.
© 2002 ABB Automation Technology Products AB BSE ppt Industrial IT The Aspect Object Architecture Overview.
UML Static diagrams. Static View: UML Component Diagram Component diagrams show the organization and dependencies among software components. Component:
Ganesh Subramanian 22/12/2010
CREMU PROJECT remote control of human movement Ph.D. Barbara Re.
Modified by: Masud-Ul-Hasan and Ahmad Al-Yamani 1 Chapter 11 Network Management (Selected Topics)
Eng. Giorgetti Alessandro Software Artisan SID s.r.l.
1 Objective of today’s lesson S oftware engineering occurs as a consequence of a process called system engineering. Instead of concentrating solely on.
Trying to connect WBSs with people and phases Relevant questions to my work: How the re 8 -planning will affect the work in progress? Priorities to capture.
Show case Presentation Presented by Thamsanqa Ncube (I.T LECTURER)
Telecom Grade Cloud Computing László Szilágyi 26 April 2013.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Instituto de Investigaciones Eléctricas
Periskal at a glance Software company, head office Belgium, sister companies in Serbia, Rumania and Ukraine Since 1990, focus on Inland ECDIS systems.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Overview of activities of the first six months and of the.
Cullen College of Engineering RFID-Based Solutions for Piping Technology Piping Tech & UH July, 2007.
Chapter 1: Introduction to oerating system
Prajaks Jitngernmadan Kanuengnij Kubola Faculty of Informatics, Burapha University IEC 2015 July 22 nd, 2015.
Liam Newcombe BCS Data Centre Specialist Group Secretary Energy Efficient Data Centres.
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 WP2 “Design and implementation of infrastructure capturing.
1 Advanced topics in OpenCIM 1.CIM: The need and the solution.CIM: The need and the solution. 2.Architecture overview.Architecture overview. 3.How Open.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
INDRIYA TECHNOLOGIES PRIVATE LIMITED BELEIVING IN A SMARTER AND GREENER WORLD.
Demonstrators and Pan-European Services Laboratory WP5 session.
+ SUH Incorporated Executive Briefing. + SUH Business Opportunity I.T. solutions are needed to improve SUH’s ability to operate Sales Support team would.
Vehicle Usage Tracker (VUT) The ideal statistic generator for the common car enthusiast Team Members: Michael Aitken – ATKMIC006 Andrew Woods – WDSAND001.
Theme: Multimedia Sound ProductionUFCFY Multimedia Sound Production.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Group Case Study.
CSE 102 Introduction to Computer Engineering What is Computer Engineering?
Introduction to Grids By: Fetahi Z. Wuhib [CSD2004-Team19]
What is Enterprise Architecture March Enterprise Architecture Architecture –the fundamental organization of a system, embodied in its components,
Data Communications and Networks Chapter 9 – Distributed Systems ICT-BVF8.1- Data Communications and Network Trainer: Dr. Abbes Sebihi.
Amagees Tech Corp value added services Data Management and Infrastructure.
WASP Airborne Data Processor Laboratory for Imaging Algorithms and Systems Chester F. Carlson Center for Imaging Science Rochester Institute of Technology.
B. RAMMAMURTHY Connected Vehicle Technology 6/6/2014 cse651 1.
Physical Views Component: A component is a physical unit of implementation with well-defined interfaces that is intended to be used as a replaceable part.
© Copyright 2014 TONE SOFTWARE CORPORATION. Confidential and Proprietary. All rights reserved. ® Operator Training – Release Introduction ReliaTel.
Course Overview This course encourages candidates to develop their knowledge and understanding of computer systems, the principles of computing (including.
Real Time Systems Lab. 1 AV1394 Board : Now and Future Real Time Systems Lab. Myung Jin (Daniel), Lee.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
“Business first, technology's the tool.”. The Application Hosting business model is based on a very simple idea:  Install application software on powerful.
BMTS Computer and Systems Pre-requisites :CT140 –Computer Skills Nature Of the Course: This course deals about the fundamentals of Computer such.
Firewall Issues Research Group First meeting yesterday, GGF 14 Mailing list: Projects page:
OPERATES SCADA OPERATION SYSTEM Explain the operational SCADA
Software Engineering (1)
COMP532 IT INFRASTRUCTURE
NEWS LAB 薛智文 嵌入式系統暨無線網路實驗室
WP1 – Smart City Energy Assessment and User Requirements
University of Napoli Federico II
Connected Vehicle Technology
Hands-On Lab Component for Wireless Information Systems Courses based on the GENI wireless research facilities Thanasis Korakis Polytechnic Institute.
Enterprise Systems Management – ESM821S
Catherine Murphy-O’Connor – Eduardo Jiménez
INDRIYA TECHNOLOGIES PRIVATE LIMITED
Smart System for Charging Electrical Meters
INDRIYA TECHNOLOGIES PRIVATE LIMITED
RKL Remote key loading.
Geospatial Service Architecture Viewpoints
CT 1306 Communication Networks Management Lab
Modular Edge-connected data centers
Modular Edge-connected data centers
 Is a machine that is able to take information (input), do some work on (process), and to make new information (output) COMPUTER.
Modular Edge-connected data centers
Presentation transcript:

1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Data Capturing Infrastructure Stathis Plitsos, AUEB-RC

2 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Architecture High point of view

3 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Architecture drill down

4 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Data Acquisition / Collection ARTISAN must be able to deal with two different cases – Embody existing Energy Management Systems, e.g. Barco-Vision ‘Energy-Master’ – Use ‘open-solutions’

5 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Embody Existing EMSs Data Acquisition module able to – Collect energy consumption data from the installed EMS; – Send these data to Data Repositories Layer.

6 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Barco-Vision EMS Components

7 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Using ‘Open Solutions’ Embody different types of metering equipment compliant with international standards Metering devices – ABB – Schneider-Electric – ….

8 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ABB

9 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Schneider-Electric

10 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Next steps Focus on two topics 1.Software 1.Develop an additional tool that embodies existing EMSs and their software issues (e.g., MC’s case) 2.Lab testing of any software developed so far. 2.Hardware 1.Installation of metering devices where needed (e.g., Piacenza) 2.Testing of software with real data.

11 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Time-plan (indicative) Main goal: to show ARTISAN Service 1 in the 1 st review meeting; Hence: real-time energy data capturing has to be implemented until end of September; Same applies for the installation of metering devices and the interconnection with the EMS of the users. 11