JERRY DUVALL FEDERAL COMMUNICATIONS COMMISSION Investing in Telecommunications Infrastructure under Uncertainty and Irreversibility: Communications Satellites.

Slides:



Advertisements
Similar presentations
Chapter 15 – Arbitrage and Option Pricing Theory u Arbitrage pricing theory is an alternate to CAPM u Option pricing theory applies to pricing of contingent.
Advertisements

Applying Real Option Theory to Software Architecture Valuation Yuanfang Cai University of Virginia.
Fin351: lecture 5 Other Investment Criteria and Free Cash Flows in Finance Capital Budgeting Decisions.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Capital Budgeting Net Present Value Rule Payback Period Rule
2-1 Copyright © 2006 McGraw Hill Ryerson Limited prepared by: Sujata Madan McGill University Fundamentals of Corporate Finance Third Canadian Edition.
Study Unit 10 Investment Decisions. SU – The Capital Budgeting Process Definition – Planning and controlling investment for long-term projects.
Valuation of Financial Options Ahmad Alanani Canadian Undergraduate Mathematics Conference 2005.
CORPORATE FINANCIAL THEORY Lecture 3. Interest Rate Cash Flow Interest Rate and Cash Flow - REALITY Is not guaranteed Has many different sources.
Last Study Topics What To Discount IM&C Project. Today’s Study Topics Project Analysis Project Interaction – Equivalent Annual Cost – Replacement – Project.
Benoît Poliquin, CFP, CFA – President and Lead Portfolio Manager Option Strategies for your Portfolio.
Real Options The Right to do Something Real. Introduction The classical DCF valuation method involves a comparison between the cost of an investment project.
Project Interactions, Side Costs, and Side Benefits 05/05/08 Ch. 6.
Chapter 4 Real Options and Project Analysis
FIN 453: Cases In Strategic Corporate Finance 1 REAL OPTIONS OLD FASHION IDEAS FOR NEW METHODOLIGIES IN CAPITAL BUDGETING.
FINA 522: Project Finance and Risk Analysis Lecture 12 Updated: 19 May 2007.
Other Investment Criteria and Free Cash Flows in Finance
“Real Estate Principles for the New Economy”: Norman G. Miller and David M. Geltner Chapter 15 Valuation Analysis: Income Discounting, Cap Rates and DCF.
Interactions of investment and financing decisions
4. Project Investment Decision-Making
Three-way choice Option Price Option Value Real Options Calls & Puts Endogenous/Exogenous Option Price Option Value Real Options Calls & Puts Endogenous/Exogenous.
Option Theory and Housing Jeff Kelsh. Housing  Owning a house is a right and not an obligation, therefore it is an option.  Option to buy or rent 
Valuing Securities.
Critique of NPV 04/29/08 Ch Merits and Flaws of NPV We will examine issues that are sometimes problematic for NPV Project Interactions – Mutually.
Intermediate Macroeconomics
10 © 2004 Prentice Hall Business PublishingPrinciples of Economics, 7/eKarl Case, Ray Fair Input Demand: The Capital Market and the Investment Decision.
Common Stock Valuation
The Theory and Estimation of Production
FINANCE 7. Capital Budgeting (2) Professor André Farber Solvay Business School Université Libre de Bruxelles Fall 2007.
Theory of Valuation The value of an asset is the present value of its expected cash flows You expect an asset to provide a stream of cash flows while you.
PVfirm = PVdebt+ PVStock
Bond and Stock Valuation The market value of the firm is the present value of the cash flows generated by the firm’s assets: The cash flows generated by.
Fin351: lecture 4 Other Investment Criteria and discounted Cash Flow Analysis Capital Budgeting Decision.
Chapter 10 - Cash Flows and Other Topics in Capital Budgeting.
Du Pont Titanium Dioxide - Assumptions. Du Pont Titanium Dioxide - Do Nothing.
Discounted Cash Flow (DCF) Analysis Tutorial This presentation is to be used ONLY as a template for DCF Analysis presentations. In no way should it reflect.
Chapter 5 Valuation Concepts. 2 Basic Valuation From “The Time Value of Money” we realize that the value of anything is based on the present value of.
Investment Analysis Lecture: 7 Course Code: MBF702.
McGraw-Hill/Irwin © 2005 The McGraw-Hill Companies, Inc., All Rights Reserved. Supply Decisions.
CAPITAL BUDGETING (REVIEW)
1 EGGC4214 Systems Engineering & Economy Lecture 2 Cost Concepts and Economic Environment.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 11 Capital Budgeting.
1 Distributions to Shareholders: Dividends and Repurchases Corporate Finance Dr. A. DeMaskey.
Chapter 7 Fundamentals of Capital Budgeting. 7-2 Chapter Outline 7.1 Forecasting Earnings 7.2 Determining Free Cash Flow and NPV 7.3 Analyzing the Project.
Making investment decisions with the Net Present Value rule This town's full of money grabbers Go ahead-Bite the Big Apple, don't mind the maggots, huh.
Multi-Period Analysis Present Value Mathematics. Real Estate Values Set by Cash Flows at different points in time. Single period Analysis revisited 
Supply Decisions Chapter 5 Copyright © 2011 by The McGraw-Hill Companies, Inc. All Rights Reserved.McGraw-Hill/Irwin.
1 Practical Problems in Capital Budgeting Lecture 3 Fall 2010 Advanced Corporate Finance FINA 7330 Ronald F. Singer.
14-0 Week 12 Lecture 12 Ross, Westerfield and Jordan 7e Chapter 14 Options and Corporate Finance.
Opportunity Cost of Capital and Capital Budgeting
Capital Budgeting The Capital Budgeting Decision Time Value of Money Methods of Capital Project Evaluation Cash Flows Capital Rationing The Value of a.
CORPORATE FINANCE I ESCP-EAP European Executive MBA
CORPORATE FINANCE III ESCP-EAP - European Executive MBA 24 Nov a.m. London Project Appraisal-Dealing with uncertainty I. Ertürk Senior Fellow in.
12-1 Capital Budgeting and Financial Planning LECTURE 22 Course Instructor: M. Jibran Sheikh.
Lecture 7 and 8 Rules of Capital Budgeting Corporate Finance FINA 4332 Ronald F. Singer Fall, 2010.
Input Demand: The Capital Market and the Investment Decision
Opportunity Cost of Capital and Capital Budgeting Chapter Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
FIN 614: Financial Management Larry Schrenk, Instructor.
Chap 4 Comparing Net Present Value, Decision Trees, and Real Options.
Financial management: lecture 7 Free Cash Flows in Finance Calculate future cash flows.
The Investment Decision Process Determine the required rate of return Evaluate the investment to determine if its market price is consistent with your.
Test Review Econ 322 Test Review Test 1 Chapters 1,2,8,3,4,7.
Lecture 03.0 Project analysis Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved McGraw-Hill/Irwin.
1 Theory of Investment - Rahul Jain. 2 Investment is … most unstable component of GDP. changes in investment are the primary cause of the business cycle.
1 Real Options Ch 13 Fin The traditional NPV rule is a passive approach because … The traditional NPV approach assumes  mangers do not have influence.
Real Option Valuation Lecture XXX.  Moss, Pagano, and Boggess. “Ex Ante Modeling of the Effect of Irreversibility and Uncertainty on Citrus Investments.”
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Capital Budgeting Chapter 11.
Lecture 11 WACC, K p & Valuation Methods Investment Analysis.
Chapter Capital Budgeting C H A P T E R. Chapter Objectives Define capital budgeting. Distinguish between the various techniques of capital budgeting.
Professeur André Farber
Presentation transcript:

JERRY DUVALL FEDERAL COMMUNICATIONS COMMISSION Investing in Telecommunications Infrastructure under Uncertainty and Irreversibility: Communications Satellites as a Case StudyPHOENIX CENTER 1 Presented Before The Phoenix Center Fourth Annual State Educational Retreat Sponsored by The Phoenix Center for Advanced Legal & Economic Policy Studies At Pointe Hilton Tapatio Cliffs Resort Phoenix, Arizona October 18, 2007

Preliminary Remarks 2 The views expressed are those of the speaker and do not necessarily reflect the views of the Federal Communications Commission or its staff. The purpose of the presentation is to:  (1) examine how profit-oriented business firms, such as communications satellite carriers, make profitable decisions respecting sunk-cost, telecommunications capital assets made under uncertainty; and  (2) the possible influence of public policy on both the timing and quantity of investment in such telecommunications infrastructure.

The Investment Decision Without Sunk Costs 3 R t = cash flow or net revenue (gross revenue less expenses) at time t r = discount rate (e.g., weighted average cost of capital) t = time index measured in periods (e.g., years) n = expected life of the investment project (e.g., n years) C 0 = total capital outlay for the investment project at the beginning of the project (i.e., t = 0)

The Investment Decision Without Sunk Costs Net Present Value (NPV) and Capital Budgeting  Definition of NPV of an Investment Project  NPV Decision Rule  Investment in a Communications Satellite  Key Assumptions in Computing NPV and the Application of the NPV Decision Rule  Reversibility  Investment as a “Once-and-for-all” Opportunity  Optimal Investment: The Neoclassical Theory of Investment  Derivation of the Firm’s Demand for Desired Capital Stock  Determination of the Firm’s Equilibrium Capital Stock

NPV Decision Rule 5 NPV ValueDecision NPV > 0Invest NPV < 0Don’t Invest NPV = 0Indifferent

Present Value of Forecast Satellite Net Lease Revenues: Total investment = C 0 = $300; WACC = r = 8.5%; Life = n = 5 years. 6 (1)(2)(3)(4) Year Forecast Net Lease Revenues ($ Millions) (1.085) t [1/2] 1/(1.085) t [(1) x (3)] PV of Forecast Net Lease Revenues ($Millions)

Key Assumptions in NPV Analysis 7 Reversibility  Investment in capital assets can be easily sold to other users  Investment is not sunk Investment as a “Once-and-for-all” Opportunity  If the firm declines to invest in a project, it cannot reconsider the decision

Optimal Investment Jorgenson (1963); Hall and Jorgenson (1967) 8 Firm’s Demand for Desired Capital Stock  Neoclassical Economics Embeds NPV Rule  Maximize Present Value of the Firm’s Infinitely Long Flow of Net Revenues where p = unit price of the Q units sold by the firm; s is the uniform wage rate paid to L units of labor; q is the price of I units of capital goods. (1)

Dynamic Optimization Problem 9 Maximize present discounted value of net revenues over an infinite time horizon where Constraint (3) is the production function and Constraint (4) holds that the rate of growth of the firms capital stock is just equal to investment less replacement where  is the rate of economic depreciation. (2) (3) (4)

Solution to the Dynamic Constrained Optimization Problem 10 Profit maximizing quantity of labor is determined where the marginal product of labor equals the wage rate (s/p). Profit maximizing quantity of capital (equilibrium desired capital stock) is determined where the marginal product of capital equals the price of capital, q, multiplied by the user cost of capital, then divided by the unit price of output. The user cost of capital is the implicit rental price for one unit of capital per unit of time. (5) (6)

Equilibrium Capital Stock 11 The profit maximizing firm increases the size of the its capital stock to the point where the value of the marginal increment of its capital stock (pMP K ) equals the user cost of capital (uc). (7) (8)

Equilibrium Capital Stock 12

Investing with Uncertainty and Irreversibility 13 Real Options Paradigm  Uncertainty over future profit streams  Irreversibility, i.e., sunk cost nature of many investments in durable assets  Choice of timing, i.e., the opportunity to delay The interaction of these three factors requires more stringent hurdles than basic NPV analysis Timing is critical

Real Options: Investing vs. Opportunity to Invest 14 The Opportunity to Invest  The opportunity to invest is a call option The Investment Decision  The Exercise of that option Definition: An option is defined as the right, without an associated symmetric obligation to buy (if a call) or sell (if a put) a specified asset (e.g., common stock) by paying a pre-specified price (the exercise or strike price) on or before a specified date (the expiration or maturity date).

Real Options: Investing vs. Opportunity to Invest 15 When to exercise the option? “... Because of the uncertainty, the option has a time premium or holding value: it should not be exercised as soon as it is ‘in the money,’ even though doing so has a positive NPV. The optimal exercise point comes only when the option is sufficiently ‘deep in the money,’ i.e., the NPV of exercise is large enough to offset the value of waiting for more information. This conclusion is probably the most widely known ‘result’ of the real options literature. Dixit and Pindyck (2000)

Example (Pindyck 1991) 16 Factory Cost = I 1 unit per period No operating cost P 0 = $100 P 1 = q($150) + (1-q)$50, and doesn’t change thereon Assume:  I = $800  q = 0.30  Interest rate = 10% Invest Now? Invest Later No cost or revenues in Year 0. Investment made in Year 1 only if P 1 = $150.

Example 17 If “invest today” or “never invest”, the firm invests ($300 payoff) If $800 reversible, then invest today and sell the asset in the second period if price falls to $50 Real Options  Irreversibility  Ability to Wait Value of the Flexibility Option  $386 - $300 = $86

Multiple Options and Managerial Flexibility 18 Defer Abandon Expand Switch Correct [project] valuation thus requires an expanded NPV rule encompassing both sources of a real investment opportunity’s value, the passive NPV of expected cash flows, and a value component for the combined value of the flexibility represented by the project’s real options. Trigeorgis (1993) Expanded NPV = Passive NPV + Combined Option Value

Real Options in the Satellite Industry 19 Economic Characteristics  Investments are Lumpy, Large, and Sunk  Flow of Net Revenue is Uncertain Given Long Life (  15 years)

Alternative Designs 20 Traditional Satellite Design  Estimate capacity requirements using market studies and “best guesses”  Number of subscribers  Average Usage per subscriber  Design constellation of satellites to meet the fixed capacity  Operations methods used to estimate a Pareto Front

Pareto Front 21 Design to K*. What if demand is K A ? What if demand is K B ?

Flexible Satellite Design 22 Staged Deployment  Managerial Flexibility  Reduced Risk of Capacity Excess or Shortfall Track the Pareto Front

Flexible Design 23 May not track the Pareto Front exactly due to embedded technologies Embedding flexibility may be difficult and costly Demand is modeled as a stochastic process and integrated into the design process Staged deployment is treated as a Real Option

Public Policy 24 Encourage Investment in Satellite Systems  Lower rates of interest  Lower tax rates on business revenues (lowers user cost of capital)  pMP K = uc/(1 - t)  Lower taxes on personal income increases spending  Increased public sector spending on satellites  Clear and consistent policies to reduce uncertainty

Public Policy 25 Discourage Investment in Satellite Systems  Higher rates of interest  Lack of Clarity and consistent in public policies  Build-out or Milestone Rules  Reductions in Public Sector spending on satellite services