© K.Fedra 2007 1 DSS for Integrated Water Resources Management (IWRM) Water economics DDr. Kurt Fedra ESS GmbH, Austria

Slides:



Advertisements
Similar presentations
A Primer on Benefit-Cost Analysis Presented to: The Reclaimed Water Technical Committee June 2, 2006 By Bruce Flory, Ph. D. Seattle Public Utilities.
Advertisements

Cost-effective internalisation and international competitiveness External costs of energy and their internalisation in Europe Brussels - Friday, 9 December.
Lecture-1 Financial Decision Making and the Law of one Price
INTRODUCTION TO APPLIED WELFARE ECONOMICS AND BENEFIT-COST ANALYSIS.
The Economics of Environmental Regulations Pollution Tax and Markets for Transferable Pollution Permits.
Hawawini & VialletChapter 7© 2007 Thomson South-Western Chapter 7 ALTERNATIVES TO THE NET PRESENT VALUE RULE.
ICS 442 Software Project Management
Sabina L. Shaikh University of Chicago Economic Valuation of Ecosystems Conference May 29, 2009 Ecosystems and Economics: Progress and Optimism for the.
Issues in Capital Budgeting II
Unit V Costs and Marginal Analysis (Chapter 9). In this chapter, look for the answers to these questions:  Why are implicit as well as explicit costs.
1 OPTIMA INCO-MPC Third Management Board Meeting, May 18/ Gumpoldskirchen DDr. Kurt Fedra Environmental Software & Services GmbH A-2352 Gumpoldskirchen.
Pollution Policy with Imperfect Information (Ch. 8)
EE535: Renewable Energy: Systems, Technology & Economics
CHAPTER 12 THE CAPITAL BUDGETING DECISION Capital Expenditures Decision §CE usually require initial cash outflows in hope of future benefits or cash.
Capital Budgeting Evaluation Technique Pertemuan 7-10 Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
4. Project Investment Decision-Making
COMPLEX INVESTMENT DECISIONS
Economics 101: How to Measure Indirect Values Benjamin S. Rashford Agricultural and Applied Economics University of Wyoming.
Capital Budgeting Investment Rules
BUSINESS ECONOMICS Class 6 1 and 2 December, 2009.
ENVIRONMENTAL BENEFIT COST ANALYSIS Traditional BCA Decision making without environmental values (too difficult to evaluate, subjective, irrelevant) Modern.
The Economics of Water Efficiency: A Review Amman, September 30 / October 4, 2005 Andrea Billi, Giovanni Canitano, Angelo Quarto UNIVERSITY OF ROME “LA.
Farm Management Chapter 20 Land  Control and Use.
Overview of Economic Concepts and Methods Jeffrey K.Lazo, PhD Director – Societal Impacts Program National Center for Atmospheric Research Mahe Island,
 Homework #8 due Next Thursday  Group Outline due Nov. 11 (next Thurs.)
Econ 231: Natural Resources and Environmental Economics SCHOOL OF APPLIED ECONOMICS.
4 C H A P T E R Capital Investment Decisions.
K.Fedra ENV-e-CITY WP 8, T8.3: Business Model (updates, June 2003) DDr. Kurt Fedra ESS GmbH, Austria Environmental.
Valuation of Intangibles. Measuring the value of outcomes (or social surplus) Two basic methods – Revealed preference (observing what people actually.
ACCTG101 Revision MODULES 10 & 11 TIME VALUE OF MONEY & CAPITAL INVESTMENT.
CHAPTER 8 CAPITAL BUDGETING Correia, Mayall, O’Grady & Pang Copyright Skystone © Objectives n At the end of the chapter, you should be able to;
Welfare economics Outline Expressing changes in human well-being (utility) in monetary terms Deciding between monetary measures that are equally theoretically.
Why are economic and financial instruments needed? A presentation made by Noma Neseni, IWSD.
ECONOMIC AND FINANCIAL INSTRUMENTS IWRM for River Basin Organisations.
Hawawini & VialletChapter 71 ALTERNATIVES TO THE NPV RULE.
University of Sunderland CIFM02 Unit 3 COMM02 Project Evaluation Unit 3.
Chapter 10 CBA and valuation1 CHAPTER 10 Cost-Benefit Analysis and Valuation.
Economics and Conservation, 2 Fri. April. 29. REVIEW: Cost Benefit Analysis (CBA) Overview Political observation – CBA was mandated for all new USA policies.
10-1 The Basics of Capital Budgeting Should we build this plant?
“Assessing Costs and Benefits of Adaptation: Methods and Data” First Regional Training Workshop – Capacity Building Programme on the Economics of Adaptation.
Economic Assessment of IPM Programs Scott M. Swinton Dept. of Agricultural Economics Michigan State University 4 th National IPM Symposium, Indianapolis,
Conceptual Framework For Financial Reporting
C H A P T E R 4 Capital Investment Decisions Capital Investment Decisions.
Travel Cost Model: an example Sittidaj Pongkivorasin Faculty of Economics, Chulalongkorn University.
Duration 1 hour 30 mins Investment Analysis. Topics to be covered Review of last session Investment background Capital budgeting Methods.
Benefits, costs and income statement. Expenses x Costs Costs - financial accounting: Amount of money which the enterprise used to get benefits. - general.
Introduction A GENERAL MODEL OF SYSTEM OPTIMIZATION.
System Engineering & Economy Analysis Lecturer Maha Muhaisen College of Applied Engineering& Urban Planning.
© K.Fedra DSS for Integrated Water Resources Management (IWRM) Problems, data, instruments DDr. Kurt Fedra ESS GmbH, Austria
Ecosystem Valuation Ecosystem Valuation ES 100: November 17 th, 2006 “We have estimated the current economic value of 17 ecosystem services for 16 biomes,
© K.Fedra DSS for Integrated Water Resources Management (IWRM) Formal decision making, rational choice Formal decision making, rational choice DDr.
Copyright © 2009 Pearson Addison-Wesley. All rights reserved. Chapter 3 Valuing the Environment: Methods.
INVESTMENT DECISION Types of Investment Business Environment - Economic - Political - Social - Technological Resources Available - Human - Managerial -
© K.Fedra DSS for Integrated Water Resources Management (IWRM) Criteria, frameworks DDr. Kurt Fedra ESS GmbH, Austria
Capital Budgeting.
Net Present Value and Other Investment Criteria By : Else Fernanda, SE.Ak., M.Sc. ICFI.
Capital Budgeting: Decision Criteria
Modeling the Market Process: A Review of the Basics Chapter 2 © 2004 Thomson Learning/South-Western.
(i) System Components, Planning and Management Introduction and Basic Components D. Nagesh Kumar, IISc Water Resources Systems Planning and Management:
Introduction to Economics of Water Resources. Public or private Excludability (E): the degree to which users can be excluded Subtractability (S): the.
Project update Each step builds on the previous step Each step builds on the previous step Your problem statement uses your literature review to tell a.
Modeling the Market Process: A Review of the Basics Chapter 2 © 2007 Thomson Learning/South-WesternCallan and Thomas, Environmental Economics and Management,
DSS for Integrated Water Resources Management (IWRM) Success and failure DDr. Kurt Fedra ESS GmbH, Austria Environmental.
Economic valuation OF NATURAL RESOURCES
Capital Budgeting Tools and Technique. What is Capital Budgeting In “Capital budgeting” capital relates to the total funds employs in an enterprise as.
Chapter 4 Measurement PowerPoint Presentation by Matthew Tilling ©2012 John Wiley & Sons Australia Ltd.
THE "COST – BENEFIT" ANALYSIS IN THE MODERN CITY ENVIRONMENT QUALITY MANAGEMENT Prof. Dr. Elena Lazareva, Prof. Dr. Tatiana Anopchenko South Federal University,
Cash Flow Estimation and Risk Analysis
Chapter 6 Principles of Capital Investment
Return to Home Page GEOG 370 May 5,
Presentation transcript:

© K.Fedra DSS for Integrated Water Resources Management (IWRM) Water economics DDr. Kurt Fedra ESS GmbH, Austria Environmental Software & Services A-2352 Gumpoldskirchen DDr. Kurt Fedra ESS GmbH, Austria Environmental Software & Services A-2352 Gumpoldskirchen

© K.Fedra IWRM: Integrated Water Resources Management Problems: Not enough, too much Wrong time and place Insufficient quality Information requirements: How much water is/will be available where and when, of which quality, at which cost ? Problems: Not enough, too much Wrong time and place Insufficient quality Information requirements: How much water is/will be available where and when, of which quality, at which cost ?

© K.Fedra IWRM: Integrated Water Resources Management Inherently multi-attribute, requires the simultaneous consideration of: Surface and groundwater Quantity and quality Watershed and waterbodies Hydrology, environment, policy and socio-economics Multiple sectors, actors, generations Inherently multi-attribute, requires the simultaneous consideration of: Surface and groundwater Quantity and quality Watershed and waterbodies Hydrology, environment, policy and socio-economics Multiple sectors, actors, generations

© K.Fedra Conceptual framework for water economics Dublin Statements: Managing water as an economic good is an important way of achieving efficient and equitable use … EU Water Framework Directive: economic analysis of water uses cost recovery of water services, cost effective combination of measures

© K.Fedra Water resources optimization Design or select policies to Maximize the benefits Minimize the costs Meet the constraints Using multiple criteria in parallel: 1.physical/hydrological 2.monetary (socio-economic) 3.environmental Design or select policies to Maximize the benefits Minimize the costs Meet the constraints Using multiple criteria in parallel: 1.physical/hydrological 2.monetary (socio-economic) 3.environmental

© K.Fedra Socio-economic criteria Benefits of water use vs Multiple criteria (ecological) with explicit cost considerations: –Cost efficiency of use –Cost effective combination of measures –True/full cost of services, cost recovery, water pricing

© K.Fedra WFD Water Economics That the polluter should pay; Take into account the economic and social development of the Community; Carry out an economic analysis of water uses; Use economic instruments as part of the programs of measures; Apply the principle of cost recovery of water services (including environmental and resource costs) in accordance with the polluter pays principle;

© K.Fedra WFD Water Economics Make the relevant calculations necessary for taking into account cost recovery of water services: a) Estimates of the volume, prices and costs associated with water services b) Estimates of relevant investment Make judgments about the most cost effective combination of measures in respect of water uses … based on estimates of the potential costs of such measures.

© K.Fedra Economic valuation Value of water: Market value (pricing) Production benefits (hydropower, agriculture) Repair and replacement Travel costs (observed) Contingent valuation (assumed) Bequest and existence values Value of water: Market value (pricing) Production benefits (hydropower, agriculture) Repair and replacement Travel costs (observed) Contingent valuation (assumed) Bequest and existence values

© K.Fedra Economic valuation Value of water: Market value (pricing) Water is bought and sold:  established market value But: subsidies may lower the cost for water for political reasons. (e.g., low cost for water for domestic use or agriculture). Value of water: Market value (pricing) Water is bought and sold:  established market value But: subsidies may lower the cost for water for political reasons. (e.g., low cost for water for domestic use or agriculture).

© K.Fedra Economic valuation Value of water: Production benefits (hydropower, agriculture) Hydropower: kWh/m3 and m of head Agriculture: fraction of the value of crops: Everything else being equal, how does (crop) production increase with water input ? What is the value of water used ? What would a rational farmer pay ? Value of water: Production benefits (hydropower, agriculture) Hydropower: kWh/m3 and m of head Agriculture: fraction of the value of crops: Everything else being equal, how does (crop) production increase with water input ? What is the value of water used ? What would a rational farmer pay ?

© K.Fedra Economic valuation Production benefits

© K.Fedra Economic valuation Value of water in goods production (producer benefit): WV < TPC (total production cost) WV = TPC – (C 1 +C 2 +C 3, ….C i ) Production depends on TWO indispensible inputs: WHAT is their share of TPC (50%, 100% ???) Value of water in goods production (producer benefit): WV < TPC (total production cost) WV = TPC – (C 1 +C 2 +C 3, ….C i ) Production depends on TWO indispensible inputs: WHAT is their share of TPC (50%, 100% ???)

© K.Fedra Economic valuation Valuing producer’s uses of water: Young, R.A.: Determining the Economic Value of Water (RFF, 2005) Producer welfare (economics), theory of the firm (production functions) Basic residual methods: –Product exhaustion theorem –Economic rents ….. IN SHORT: water input must PAY Valuing producer’s uses of water: Young, R.A.: Determining the Economic Value of Water (RFF, 2005) Producer welfare (economics), theory of the firm (production functions) Basic residual methods: –Product exhaustion theorem –Economic rents ….. IN SHORT: water input must PAY

© K.Fedra Economic valuation Repair and replacement: Value of clean water = cost of treatment Value of a natural habitat (beach, lake, wetland) = cost of “re-building it”, offering an alternative Value of urban water supply: substitution cost (in the extreme, providing bottled water ….) Repair and replacement: Value of clean water = cost of treatment Value of a natural habitat (beach, lake, wetland) = cost of “re-building it”, offering an alternative Value of urban water supply: substitution cost (in the extreme, providing bottled water ….)

© K.Fedra Economic valuation Travel costs (observed behavior) Measures the value of “environmental (non- market) service functions”, recreation: Asks visitors about the costs of visiting (travel cost) some environmental feature. High level of uncertainty: diverse personal reasons for visiting specific sites ! Basic idea: social constructivism Travel costs (observed behavior) Measures the value of “environmental (non- market) service functions”, recreation: Asks visitors about the costs of visiting (travel cost) some environmental feature. High level of uncertainty: diverse personal reasons for visiting specific sites ! Basic idea: social constructivism

© K.Fedra Travel cost method Count visitorsCount visitors Interview:Interview: –Determine distance traveled (travel cost based on mileage) –Determine other expenditures Estimate total expenditures from recreational users == value of the resourceEstimate total expenditures from recreational users == value of the resource Count visitorsCount visitors Interview:Interview: –Determine distance traveled (travel cost based on mileage) –Determine other expenditures Estimate total expenditures from recreational users == value of the resourceEstimate total expenditures from recreational users == value of the resource

© K.Fedra Travel cost method: uncertainty An experimental program allowing US national parks … to raise their fees has significantly boosted revenues without affecting the number of visitors = substantial increase in the “travel cost”

© K.Fedra Travel cost method: uncertainty Four agencies reported... recreational fee revenues nearly doubled from 93 M$ in 1996 to 179 M$ in (= + 92%) Number of visitors to sites with higher fees increased by 5%. (IHT, December 5, 1998) DID THE “intrinsic” VALUE OF THE PARKS DOUBLE ? (positivist answer: NO, constructivsit answer: YES !)

© K.Fedra Economic valuation Contingent valuation (CVM) Assumed “market”, ask stakeholders about: willingness to pay Easy and flexible Very uncertain, biased Basic idea: social constructivism Contingent valuation (CVM) Assumed “market”, ask stakeholders about: willingness to pay Easy and flexible Very uncertain, biased Basic idea: social constructivism

© K.Fedra Money and time For DSS, need to evaluate and compare costs and benefits at different point in time, long project life times: discount rate (shadow price of capital) Net Present Value, Annual Equivalent Cost For DSS, need to evaluate and compare costs and benefits at different point in time, long project life times: discount rate (shadow price of capital) Net Present Value, Annual Equivalent Cost

© K.Fedra 2007 NPV net present value compound interest equation: compound interest equation: V t = V 0 (1+r) t V t = V 0 (1+r) t V t value at end of year tV t value at end of year t V 0 present valueV 0 present value r interest rater interest rate t time in yearst time in years

© K.Fedra 2007 NPV Net Present Value V t V t V 0 = V 0 = (1+r) t (1+r) t for example, the NPV of 1,000,000 US$ to be received or due in 25 years at 8% interest or discount rate is …..

© K.Fedra 2007 NPV net present value V t V t V 0 = V 0 = (1+r) t (1+r) t for example, the NPV of 1,000,000 US$ to be received or due in 25 years at 8% interest or discount rate is ….. 146,018 (or 14.6 %) 146,018 (or 14.6 %)

© K.Fedra Discounting future payments

© K.Fedra 2007 NPV net present value where: n - project duration duration r - discount rate Ct - the net cash flow (income) at time t. C0 – initial capital outlay t - the time of the cash flow

© K.Fedra 2007 NPV net present value Assume a hydroelectric project: Building costs 28 M $ Power benefits 2 M $/year Life time 25 years Discount rate 6% Project NPV 3.5 M $

© K.Fedra 2007 NPV net present value Assume a hydroelectric project: Building costs 28 M $ Power benefits 2 M $/year Life time 25 years Discount rate 8% Project NPV M $

© K.Fedra 2007 EAC equivalent annual cost Calculate annual investment cost: where: i = interest rate (fraction) n = number of years

© K.Fedra 2007 EAC equivalent annual cost Investment: 150,000 Life time:8 years OMR:7,500/year Discount rate:5% Capital Recovery factor ( 5/8 ): Annual capital cost: 23,250 EAC: 23,250 +7,500 = 30,750

© K.Fedra Estimating benefits and costs Economic valuation with CVM, TCM: Not to get it “right” (highly subjective, error prone, theoretically questionable)Not to get it “right” (highly subjective, error prone, theoretically questionable) But to get it organised, structured, complete, consistent, plausibleBut to get it organised, structured, complete, consistent, plausible

© K.Fedra 2007 Economy of decision making The effort in making a decision must be small compared to the expected benefit, cost, or risk. Simple decisions: can fully be automated (thermostat, traffic light) Complex decisions: regulations, DSS