Floating Roof Stability This presentation is provided to clarify the issues surrounding the current budget proposal to fund the SC-AST project “Seismic.

Slides:



Advertisements
Similar presentations
The Department of Energy Enterprise Risk Management Model
Advertisements

Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
INPO Update CMBG Meeting June 2013
Visit Us At Booth #306 J2 Engineering, Inc. J2 provides Construction and Environmental Services and is a verified Service-Disabled Veteran-Owned Small.
FDA’s Proposed Rule under FSMA for Preventive Controls
WorkSafe Victoria is a division of the Victorian WorkCover Authority Guidance Note on the Prevention of Bullying and Violence at Work Evaluation results.
1. Glenpool South Tank Farm Glenpool, Oklahoma April 7, 2003 Storage Tank Explosion and Fire ConocoPhillips.
Government Industry R&D Forum March 2005 Pipeline Design & Construction Near Term Focus Future Gaps & Opportunities.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
20th July 2002 Chevron UK full surface tank fire.
Unregulated Low-Stress Hazardous Liquid Pipelines Mike Israni & John Gale Aug 5, 2009.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Designing and Installing Exterior Vapor Distribution Systems INTRODUCTION Course Overview and Objectives.
IRB Determinations 1. AAHRPP Site Visit Results Site visitors observed a real commitment to human subject protections Investigator and research staff.
Roofing Fall Protection The following presentation can be used to satisfy the training requirements of the Fall Protection Standard in the WISHA Safety.
IS Audit Function Knowledge
Pipeline Corrosion Management NACE Houston Section April 9, 2013 Drew Hevle - Manager, Corrosion Control Kinder Morgan Natural Gas Pipeline.
Change Request Management
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
© Copyright 2013, State Impact. Image source: The Center for Land Use Interpretation photo archive. Used with permission.
“How Industry Learns” --- Proposed Project --- Karen Paulk, ConocoPhillips, Chair, Process Safety Group & Ron Chittim, API CRE Chairs & Sponsors Workshop.
NCBIA Committee - Education To provide quality education to code officials and associates, to promote competency and knowledge of the NC State Building.
July, 2012 Catastrophe Insurance Overview AIIF 2012, Baku, Azerbaijan.
Unit 1 Community Capabilities
Special Protection Systems - Market Rule Amendment Submission Presentation to: Market Operations Standing Committee Barbara Reuber, Regulatory Affairs.
Software Project Management
Fall Hazards.
BTS730 Communications Management Chapter 10, Information Technology Management, 5ed.
USAID Environmental Procedures. EA Training Course Tellus Institute 2 USAID Procedures Overview  USAID environmental review requirements are:  A specific.
Chevron Floating Roof Support
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Committee on Refinery Equipment 2008 Spring Meeting Update Wendy Dominguez, Chair, CRE Member, General Committee on Special Programs.
TELVENT IT for a Sustainable and Secure World Alarm Management Gregory Bogle Business Development Manager – Europe Telvent – Oil and Gas Division – EMEAA.
Walking-Working Surfaces: Preventing Falls. Start Safe and Stay Safe In order to Start Safe and Stay Safe in the areas where you walk and work, you should.
Dr. Charles W. Beadling Central Asia Regional Health Security Conference April 2012 Garmisch-Partenkirchen, Germany.
Infrastructure Profile Consider strengths and vulnerabilities of the built environment.
Research & Technology Implementation TxDOT RTI OFFICE.
Linear Buckling Analysis
2013 NWHA CONFERENCE FERC’S RISK-INFORMED DECISION MAKING Doug Johnson – Regional Engineer - Portland From PFMA to Risk Assessment.
Security Policies and Procedures. cs490ns-cotter2 Objectives Define the security policy cycle Explain risk identification Design a security policy –Define.
West Contra Costa USD Tax Rate Setting Process, November 2012 Bond Election, and Current Topics Presentation to the Facilities Subcommittee August.
Jonathan McCoy Regional Property Underwriting Manager Zurich Energy Supply chain insurance and risk assessment Protecting profitability.
Installing Appliances and Interior Vapor Distribution Systems MODULE 1 Introduction.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Pipelines study – final report European Commission, DG Environment Industrial Emissions, Air quality & Noise Unit 1.
BY: Winston G. Smith Environmental Engineer UST/PCB & OPA Enforcement & Compliance Section EPA Region 4.
Project Management “Project Planning & Scheduling” Lecture 07 Resource Person: M. Adeel Anjum.
High Assurance Products in IT Security Rayford B. Vaughn, Mississippi State University Presented by: Nithin Premachandran.
A research proposal is a document written for the purpose of obtaining funding for a research project.
Presentation of Nominations to the World Heritage Committee by the Advisory Bodies Presentation by ICOMOS Paris, January 2013.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
Principal Investigator ESTCP Selection Meeting
Catastrophe Insurance Overview AIIF 2012, Baku, Azerbaijan
Change Request Management
Pipeline Assessment Certification Program (PACP) Benefits of Version 7
Principal Investigator ESTCP Selection Meeting
Achieving Strategic Goals while Supporting Operational Needs
StocExpo 2012 Ross Coulman 15th March 2012.
Overview – Guide to Developing Safety Improvement Plan
2018 Adopted Budget February Financial Plan
Overview – Guide to Developing Safety Improvement Plan
First 8 slides are what was presented in San Fransisco…
Special Education Maintenance of Effort
Principal Investigator ESTCP Selection Meeting
Membership & Professional Standards Committee Fall 2014
Introduction Last comprehensive review was undertaken in 2012/2013
Quality Assurance in Clinical Trials
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

Floating Roof Stability This presentation is provided to clarify the issues surrounding the current budget proposal to fund the SC-AST project “Seismic Sloshing Waves”. Really the project is to do the technical work needed to understand the behavior of floating roofs under any load conditions including sloshing waves. Many floating roofs exist which do not meet the broad API 650 strength requirements outlined in API 650 Appendices C and H. However, the industry takes the vendor communities’ word for it that they have provided sufficient strengh to meet the standards. Many examples and case histories show that this is not the case. By performing this work not only with the basic requirements provide the industry with a tool to easily assess the strength of floating roofs to perform as intended but the work will provide the basis for designs needed in regions and areas subject to seismic activity. Also attached is the original API proposal that was submitted to the CRE during the last meeting cycle.

Pre-Read Background These slides will not be covered on the call; but are provided for background in order to get all on the “same page” prior to the call

Is Your Facility Vulnerable This map shows the basic regions where this work will have the highest impact

Floating Roof Critical to Tank Safety Vaporization stopped Caps fire risk to rim fires (minor events) Reduces fire protection needs (foam, etc) to rim area (not tank area) Prevents escalation to fully involved tank and terminal fires Single most important fire and safety defense of all tank components

Floating Roof Vulnerabilities Floating roofs are vulnerable to: –Sinking –Rain (In Houston, Storm Allison caused over 100 floating roofs to sink) –Gas (as from producing or pipeline operations) –Corrosion –API 650 has performance based rules which have proven to be inadequate

Why Is API 650 Inadequate Rules require 2 flooded compartments plus centerdeck and, 10 inches of rain in 24 hours Performance based rules are fine But nobody knows how to design to the rules Result is the industry depends on vendors for this There have been many suits resulting from sunk floating roofs Industry needs to have simple rules, tables and formulas that ensure roof is strong enough for this This information needs to be in the hands of industry, not just for vendors to use

Seismic Background Seismic technology changed – so codes changed API 650 Appendix E revised accordingly But job is only half complete Seismic Committee intended to address –Tank shell and bottom first (appendix E does this) –Then Floating roof stability (this is current proposal)

Seismic Failure Modes Bottom separates from shell Shell elephant foot Tearing piping Floating roof collapse First 3 covered by new Appendix E (completed) Floating roof (yet to complete)

Seismic waves cause floating roof to lose bouyancy Seismic waves cause failure deck and floating roof sinking This results in full surface fire and tank burndown What we observed in the last major refinery earthquake tank sloshing waves

Ismet Turkey

Ismit, Turkey 1998

CRE Presentation This is where we will start on the conf call

Is Sloshing Wave Floating Roof Risk Real? Hokaido –4 fully involved tank fires –2 fully involved due to floating roof collapse from SWs –50% Ismet Turkey –23 major tank fires –17 due to SWs –>50% Anchorage –Commingled data but many floating roofs collapsed API AST Leadership Committee thinks seismic work not complete API AST Leadership Committee also thinks that seismic sloshing is important and should be completed

Compare this project to other funded work Seismic has 2 major incidents (ismet and hokaido) Emergency venting (comparable funding) –No incidents since about 1990 Tank Settlement –No incidents resulting in fires or serious incidents Support: The above 2 projects not requested by outside institutions or companies Seismic: Requests by Alyeska as well as PAJ with 50% funding guarantee

Current CRE Plan for AST funding 30K for Jacking Tanks in 2006 AST would rather spend this on seismic ($25) because –Jacking not ready yet (results of settlement still in committee for another year) –Jacking is low impact compared to seismic –Jacking is much lest risk than seismic

Business Case At least 25 floating roofs per year sinking in US alone About ½ are due to corrosion; other half water or gas Of the half, about 1/3 are due to inadequate design This is about 4 per year sinking due to inadequate structural stability These would not sink or are preventable if the API Companies had simple means to evaluate floating roof stability Proposed work will result in this deliverable

Business Case Continued The lowerbound estimate for the Ismet and Hokaido Incidents are 100MM$ At least ½ of the floating roofs causing fires would not have occurred Cost savings from these standards would be roughly 30MM$ It is unknown how many fatalities occurred in Ismet, but some costs can be attributed to this By comparison, this work is at least as important than any other project funded in the last 5 years by SCAST when compared on a line basis

Funding Requirements 50 $M for 2006 and 2007 ($100M for 2 year project) PAJ agreed to 50% sharing of costs API funding is $25 for 2006 and 2007 For 2006 –AST has $30M budgeted for “tank jacking” –Cancel or defer this work and fund 2006 SSW with this –Will submit budget item for 2007 to cover balance of work for $25M

Final Statement of Benefit To Cost Benefits –Project has high value seismically vulnerable areas –Chevron and Alyeska support this activity –Work will result in not only adequate floating roofs for seismic areas –Will result in general understanding of floating roofs for other load conditions (gas, rainwater, etc) –Project is leveraged Costs –None in 2006 (deferral of tank jacking) –$25M in 2007