1 Interstellar Heliopause Probe M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010 Interstellar Heliopause Probe (IHP) System Design.

Slides:



Advertisements
Similar presentations
Israeli Universal Spacecraft Bus Characteristics and Design Trade-Offs
Advertisements

LightSail.
Larry Phillips MAY 13th-17th, 2002 Micro Arcsecond Xray Imaging Mission: Pathfinder (MAXIM-PF) Launch Vehicle Information Final Version.
Comparative Assessment of Human Missions to Mars Damon F. Landau Ph. D. Preliminary Exam September 13, 2005.
Deflecting APOPHIS with a Flotilla of Solar Sails Jean-Yves Prado Olivier Boisard, Alain Perret,Guy Pignolet U3P France.
Thermal StrategySam Heys, RAL EUV Spectrometer Proto-Consortium Meeting November 28th 2001 Coseners House 1 Thermal Strategy Sam Heys Rutherford Appleton.
Towards Low-cost Swedish Planetary Missions S. Barabash 1, O. Norberg 2, J.-E. Wahlund 3, M. Yamauchi 1, S. Grahn 4, S. Persson 4, and L. Blomberg 5 1.
Geospace Electrodynamic Connections (GEC) Mission The GEC mission has been in the formulation phase as part of NASA’s Solar Terrestrial Probe program for.
Институт прикладной математики им. М.В.Келдыша РАН Keldysh Institute of Applied Mathematics, Russian Academy of Sciences.
Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
Payload Design Criteria for the Space Test Program Standard Interface Vehicle (STP-SIV) Mr. Mike Marlow STP-SIV Program Manager Payload Design Criteria.
07/07/2005 Coupling with PF2012: No existing PF “as is” able to accommodate Karin On going study in France to develop a new generation of PF product line.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
1 ESAIL proof of concept mission Juha-Pekka Luntama Pekka Janhunen Petri Toivanen.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
Inner Guides=Text Boundary Outer Guides=Inner Boundary Asteroid Redirect Mission and Human Exploration Michele Gates Human Exploration and Operations Mission.
Attitude Determination and Control
Spacecraft Propulsion Dr Andrew Ketsdever Lesson 13 MAE 5595.
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
A Comparison of Nuclear Thermal to Nuclear Electric Propulsion for Interplanetary Missions Mike Osenar Mentor: LtCol Lawrence.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
S/C System Design Overview Robert G. Melton Department of Aerospace Engineering.
The Pursuit for Efficient S/C Design The Stanford Small Sat Challenge: –Learn system engineering processes –Design, build, test, and fly a CubeSat project.
Samara State Aerospace University (SSAU) Samara 2015 SELECTION OF DESIGN PARAMETERS AND OPTIMIZATION TRAJECTORY OF MOTION OF ELECTRIC PROPULSION SPACECRAFT.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
1 Project Name Solar Sail Project Proposal February 7, 2007 Megan Williams (Team Lead) Eric Blake Jon Braam Raymond Haremza Michael Hiti Kory Jenkins Daniel.
1 NASA’s Goddard Space Flight Center 2005/4/14 LRO/CRaTER Technical Interchange Meeting LRO Mechanical Systems Giulio Rosanova / /
Attitude Determination and Control System
ReVeal Passive Illumination by Radar (PAIR). Overview Payload / Mission Communication Launch Orbit Power Thermal Attitude Propulsion Finance.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
Solar Probe Plus A NASA Mission to Touch the Sun Solar Probe Plus – A Mission to Touch the Sun Rob Decker and Nicky Fox Johns Hopkins Applied Physics Laboratory.
© Lavochkin Association, 2013 Ganymede Lander mission overview.
Recent determination of Gamma with Cassini M.T. Crosta, F. Mignard CNRS-O.C.A. 5th RRFWG, June, Estec.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
Pioneer Anomaly Test – Jonathan Fitt 1 Design Assessment of Lunar, Planetary and Satellite Ranging Applied to Fundamental Physics Jonathan Fitt Friday,
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
14th Feb Page 1 LISA Mission Review Presentati on ESTEC, 14th Feb Prepared by the CDF* Team (*) ESTEC Concurrent Design Facility LISA Mission.
Problem Statement Overview of tasks Requirements for selection test.
STRATEGIES FOR MARS NETWORK MISSIONS VIA AN ALTERNATIVE ENTRY, DESCENT, AND LANDING ARCHITECTURE 10 TH INTERNATIONAL PLANETARY PROBE WORKSHOP June,
III - 1 III. Solar Sail Flight System Technology Session Facilitator: Gregory P. Garbe.
Issue/Revision: 1.0 Reference: Status: For information Only ESA UNCLASSIFIED - For Official Use Solar Orbiter: Launch Options Favouring Data.
Human Exploration of Mars Design Reference Architecture 5
1 Weekly Summary Weekly Summary Formation Flight AEM4332 Spring Semester March 7,2007 Masao SHIMADA.
1 System Architecture Mark Herring (Stephen Merkowitz Presenting)
Competition Sensitive Gabe Karpati June 28, 2001 SuperNova / Acceleration Probe (SNAP) System Overview.
Mission Description Well-designed spacecraft and instruments using high energy launches and gravity assists to escape quickly Could be accomplished by.
Final Version Gary Davis Robert Estes Scott Glubke Propulsion May 13-17, 2002 Micro Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF)
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
Spacecraft Systems Henry Heetderks Space Sciences Laboratory, UCB.
Solar Orbiter EUS: Thermal Design Progress Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Progress Bryan.
ACE Science Workshop March 10 th, 2009 Armin T. Ellis, Deborah Vane, Mark Rokey Jet Propulsion Laboratory.
Orbital Aggregation & Space Infrastructure Systems (OASIS) Background Develop robust and cost effective concepts in support of future space commercialization.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
The Saturn Orbiter: Cassini LAKSHMI SRAVANTHI KOUTHA.
EUMETSAT 2 nd MTG User Consultation Workshop Locarno, April Introduction Observation Payload Imagery Missions (HRFI and FDHSI) Infra-Red Sounding.
AAE 450 Spring 2010 AAE 450 2/11/2010 Kathy Brumbaugh Chris Spreen
Sketch for a telecoms system
Preliminary Platform Design for KuaFu-A
ESA's Ground Station Network Prospects for operations of the Lagrange missions S. Kraft OPS-L , K.-J. Schulz OPS-GS 08/03/2017.
Technical Resource Allocations
A Parametric Study of Interplanetary Mission Using Solar Sail
P2-SWE-X Enhanced Space Weather Monitoring System ESWW13
P2-SWE-X Enhanced Space Weather Monitoring System ESWW13
Overview of the System Accommodation and Mission Design for a Fission Powered Titan Saturn System Mission (TSSM) Robert L. Cataldo1, Steve R. Oleson1,
Scientific Mission Applications
Launch and On-orbit Checkout
Team A Propulsion 1/16/01.
Main information on the «WORLD SPACE OBSERVATORY» project
THERMAL CONTROL SYSTEM
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

1 Interstellar Heliopause Probe M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010 Interstellar Heliopause Probe (IHP) System Design of a Challenging Mission to 200 AU

2 Interstellar Heliopause Probe Overview Study Team Propulsion Trade-Off Mission/Trajectory Analysis Spacecraft Architectural Design Mass and Power Budgets M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010

3 Interstellar Heliopause Probe Study Team - Optical Communication Option M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010

4 Interstellar Heliopause Probe Propulsion Options Assessed for IHP A) High Thrust Chemical Propulsion (CP) (I sp = 320s s; Cryogenic first stage I sp = 470s), incl. Nuclear Thermal Propulsion (NTP) B) Mixed High/Low Thrust Propulsion C) Nuclear Electric Propulsion (NEP) with I sp = 5,000s... 10,000s D) Solar Sail Propulsion (SSP) with a c = mm/s 2 Assumed Launch Mass to GTO for Options A), B) and C): < 3,020 kg Assumed Launch Mass to Earth Escape for Option D):< 2,030 kg (Kourou) M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010

5 Interstellar Heliopause Probe Preliminary Spacecraft Architectural Design for NEP-Concept Power Subsystem + Radiation Shield Payload „Core“ Payload PWRE Booms 2 x 35m Magnetometer Boom 7-8m S/C Bus with Payload Deployable Truss M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010

6 Interstellar Heliopause Probe Propulsion Trade-Off Result High thrust (conventional) propulsion incl. gravity assists proved to be infeasible for 25 year flight time and transported mass of ca. 200 kg Mixed high thrust / low thrust also not feasible NEP scenarios infeasible given the launch vehicle constraint of SOYUZ-FREGAT Solar Sail option was selected as baseline Solar Sail scenarios show performance requirement of 1 mm/s 2 to realize flight times of appr. 25 years to reach 200 AU, i.e. depending on minimum solar approach distance M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010

7 Interstellar Heliopause Probe Scenarios: Low Thrust Solar Sail Propulsion M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010

8 Interstellar Heliopause Probe Optimized Transfer Result & Navigation Strategy Strategy: „Dual Solar Photonic Assist“  1 st aphelion: 1.05 AU  1 st perihelion: 0.51 AU  2 nd aphelion: 5.76 AU  2 nd perihelion: 0.25 AU Note: Trajectory not optimized for escape asymptote direction to nose of Heliopause ODYSSEE Low-Thrust Optimization, 2004 M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010

9 Interstellar Heliopause Probe Evolution of Solar Distance Total time of Flight:25.5 years Cruise Phase until 5 AU:6.7 years (Sail jettisoned) Max. Sail Turn Rates: 28.6°/ day, or 1.2°/hour Conclusions: it pays off to spend more time in the inner solar system by increasing the orbit eccentricity Sail jettisoned M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010

10 Interstellar Heliopause Probe IHP Launch Configuration HGA RTG LV Adapter Deployable Booms Sail Container LGA HIPS Fairing M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010

11 Interstellar Heliopause Probe Sail Deployed 20m Central Control Mast 2DOF Gimbal Boom Deployed Sail Container (open) IHP Platform M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010

12 Interstellar Heliopause Probe Spacecraft Architectural Design: Science Mode 35m Plasma- Wave Experiment Boom 8m Magnetometer Boom Highly Integrated Payload Suite M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010

13 Interstellar Heliopause Probe IHP Science Payload Total of 8 instruments accommodated Total mass: 20.9 kg incl. subsystem margin M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010

14 Interstellar Heliopause Probe M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010 Platform Concept (incl. Science Platform)

15 Interstellar Heliopause Probe M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010 AOCS Maximum turn rate sailing mode:29°/day (heliocentric, near sun) Pointing stability science mode:0.5° Life time: sailing mode:ca. 6.5 years science mode:ca. 19 years Minimum mechanical complexity Sailcraft controllability for first natural frequency of Hz Coherent AOCS design for sailing mode and science mode (sensors etc.) Need to design two different ADCS for IHP

16 Interstellar Heliopause Probe M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010 Sail Control Schemes Trade-Off

17 Interstellar Heliopause Probe M. Leipold, Kayser-Threde GmbH IHP AOCS Architecture ISSS 2010, New York, July 19 – 22, 2010

18 Interstellar Heliopause Probe M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010 IHP Sail ADCS Analysis IHP Sail Configuration Moments of inertia = (433000, , ) kg-m 2 cm-cp offset = m (0.25% of 210 meter sail edge) SRP Thrust = F max =  PA = N where,  is the sail efficiency (1.8 assumption), P is the SRP constant P = x N/m 2 at 1 AU, A is the projection area (210 x 210 m 2 ) N SRP, SRP Disturbance torque = F (cm-cp) =0.189 N-m Angular momentum storage/dumping > (N SRP )(3600 s)= 680 N-m-s per hour Use a 0.65 deg/s spin rate for 0.5 deg pointing accuracy, 1-2 rpm

19 Interstellar Heliopause Probe M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010 Intermediate ACS-Results: - MATLAB Simulations - 35 deg in 6 hrs - 20m Mast x 210 m kg science s/c kg total mass - Gimbal angle < 5 deg

20 Interstellar Heliopause Probe Launch Vehicle Accommodation on SOYUZ-FREGAT (Fairing Type ST) SOYUZ-FREGAT M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010

21 Interstellar Heliopause Probe IHP Mass Budget: Platform + Sail M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010

22 Interstellar Heliopause Probe Summary IHP showed that advanced Solar Sails can outperform Nuclear Electric Propulsion for High-  v Missions in Deep Space IHP provided important results for sailcraft ACS simulations and sail controllability IHP helped to define the technology requirements and the definition of a solar sail technology roadmap for ESA

23 Interstellar Heliopause Probe Thermal Control Concept High temperature MLI with reflective outer layer effective emittance: total area: ca. 4 m² Bus Radiators: black coated Size: 0.1m² each RTG: black coated decoupled from bus RTG shield: reflective Couplings: Bus – Radiator: 2 Heat pipes per radiator; C = 2.5 W/K each Bus – RTG: 0.1 W/K each Bus – Antenna: 0.25 W/K Instruments – Radiator: 0.07 W/K total Instruments – Boom: 0.09 W/K total Instrument Radiator: black coated Size: 0.08m² M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010

24 Interstellar Heliopause Probe Operations Candidate Ground Stations New Norcia Villafranca del Castillo, Spain Weilheim, Germany Only small modifications are required for ground stations Downlink Data Rate at Ka Band: 1 kbps downlink during cruise phase up to 6 AU 200 bps downlink up to 200 AU 4h per week contact time planned (average) M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010