Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.

Slides:



Advertisements
Similar presentations
Mercury Intense Target (MERIT) Update Status of the Target System Design P.T. Spampinato V.B. Graves T.A. Gabriel Muon Collaboration Friday Meeting October.
Advertisements

A Free Jet Hg Target Operating in a High Magnetic Field Intersecting a High Power Proton Beam Van Graves, ORNL P. Spampinato,T. Gabriel, ORNL H. Kirk,
Harold G. Kirk Brookhaven National Laboratory Targetry Plans and Status MUTAC Review FNAL March 17, 2006.
Chubaka Producciones Presenta :.
MERIT Review Meeting: Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug CERN Cryogenics for Experiments Accelerator Technology Department Presented by Adrian.
Hg System Design V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
MERIT Collaboration Meeting ISSUES RELATING TO THE Hg-JET TARGET SYSTEM P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University November 17, 2005.
Harold G. Kirk Brookhaven National Laboratory MERIT Experiment Status NFMCC Collaboration Meeting FNAL March 17-20, 2008.
Harold G. Kirk Brookhaven National Laboratory MERIT Installation Issues CERN Meeting June 20, 2006.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Harold G. Kirk Brookhaven National Laboratory Targetry Program 5 Year Plan H.G. Kirk Muon Collaboration Meeting LBNL February 16, 2005.
Harold G. Kirk Brookhaven National Laboratory Hg Jet Quadrupole Distortions MERIT Collaboration Meeting Princeton November 17, 2005.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
31.March.2004 C. A. Martins, CERN AB/PO 1 Analysis of the possibility of using of a ALICE/LHCb type power converter in TT2A target test by Carlos DE ALMEIDA.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
MERcury Intense Target (MERIT) Overview Van Graves, ORNL Syringe Procurement Kickoff Meeting Airline Hydraulics Bensalem, PA Oct 28, 2005.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
2.April 2004A.Fabich, H.Kirk Summary for proposal of TT2A target test H.Kirk, A.Fabich March 2004 week 9 morning: Cryogenics,
The TT2A Experiment A Proposal to the ISOLDE and Neutron Time of Flight Experiments Committee
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos – CERN, AB Dept. Thanks to: A.Fabich, H.Haseroth,
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Mercury System Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Hg-system Safety.
The MERIT High-Power Target Experiment H. Kirk (BNL) CERN November 1, 2007.
MERIT Experiment Status MERcury Intense Target K. McDonald for the MERIT Collaboration August 30, 2007 TT2/TT2A: MERIT Build.272: Offices & Control Room.
High Power Hg Target Conceptual Design Review Design Requirements, Interfaces, and Schedule P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Target Design Meeting Nozzle & Hg Collection Tests, Design Requirements, Instrumentation, Containment, Windows, Diagnostics, Controls, Base Support Structure,
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005.
Harold G. Kirk Brookhaven National Laboratory The High-power Target Experiment at CERN NUFACT’04 Osaka, Japan July 27, 2004.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Front End Technologies Harold Kirk Brookhaven National Laboratory February 19, 2014.
NTOF11 Collaboration Meeting Non-Design Issues for the Mercury Jet Target P.T. Spampinato V.B. Graves T.A. Gabriel Princeton University April 29-30, 2005.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
Harold G. Kirk Brookhaven National Laboratory Targetry Concept for a Neutrino Factory EMCOG Meeting CERN November 18, 2003.
17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Harold G. Kirk Brookhaven National Laboratory Targetry Concept for a Neutrino Factory Muon Meeting BNL January 26, 2004.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
MERIT Hg System Final Design Review Hg Target System Controls V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma Science &
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN High-Power Targetry Workshop Oak Ridge, TN October 10, 2005.
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Report to MUTAC LBNL April 25, 2005.
Harold G. Kirk Brookhaven National Laboratory Targetry Program Collaboration Meeting Columbia University June 11, 2003.
TT2A Mercury Jet Experiment The Cryogenic System Roger Bennett and Yury Ivanyushenkov CCLRC, Rutherford Appleton laboratory, Chilto, Didcot, Oxon, OX11.
Power controls, Sept. 2006A.Fabich1 MERIT installation: Controls for the 5MW power-supply A.Fabich CERN AB-ATB September 2006.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Harold G. Kirk Brookhaven National Laboratory The E951 Targetry Program Targetry Meeting CERN September 19, 2003.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos Thanks to: A.Fabich, H.Haseroth, F.Haug, J.Lettry,
MERcury Intense Experiment Experiment Layout
Cryoplant Installation Scope
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
MERIT Scientific goals and importance
Target and Horn status report
Teleconference ACS – FREIA 31st October 2017
Status of the cryogenic system for B180
The Proposed TT2A Target Experiment
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
McDonald’s calendar 2007.
Teleconference ACS – FREIA 19th June 2017
Discussion on MERIT Cryogenics Specifications
McDonald’s calendar 2007.
UPPSALA UNIVERSITY_GERSEMI PROJECT
2015 January February March April May June July August September
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005

Harold G. Kirk The Funding Profile

Harold G. Kirk High Field Pulsed Solenoid l 80 o K Operation l 15 T with 5.5 MW Pulsed Power l 15 cm warm bore l 1 m long beam pipe Peter Titus, MIT

Harold G. Kirk Pulsed Solenoid Milestones Delivery to MIT December 05 Reception Testing January 06 Integration Testing September 06 Ship to CERN November 06 Installation at CERN December 06

Harold G. Kirk The Hg Jet System Double Containment System, with snout inserted into magnet. Mercury inventory ~ 20 liters. Hydraulic system can deliver up to 1000 psi, to propel mercury at > 20 m/s

Harold G. Kirk Hg Jet System Milestones Delivery of Hydraulics February 06 Containment Vessels May 06 Optics Delivery June 06 System integration at ORNL June-July 06 Integration Testing at MIT September 06 Ship to CERN November 06 Installation at CERN December 06

Harold G. Kirk Target Test Site at CERN

Harold G. Kirk The Tunnel Complex TT10 TT2 TT2A ISR (Control Room Location) MERIT Hyd Pump & Controls in TT2

Harold G. Kirk Surface above the ISR 6000 l Dewar Access Route Two 18kV sub-stations One 18kV Sub-station

Harold G. Kirk Power Converter (From SPPS Transfer Line) 8000 Adc, 1000 Vdc Global view Rectifier bridges Passive filter Passive filter capacitors self capacitors DC output Strategy: Refurbishment of the West Area Power Converter, making it compatible with the project requirements

Harold G. Kirk Power Supply Milestones Site Preparations January 06 Relocate and Install February 06 DC Cabling February 06 AC Cabling March 06 Refurbish PS March-April 06 Interlocks September 06 Commissioning October 06

Harold G. Kirk Cryosytem Layout LN 2 and N 2 gas stored on the surface. Cold valve box in the TT2 tunnel. Exhaust gas vented into TT10 tunnel through filtration system. ~ 150 liters of LN 2 per Magnet pulse. Magnet flushed with N 2 prior to each pulse, to minimize activation of N 2.

Harold G. Kirk Cryogenics Process and Instrumentation

Harold G. Kirk Cryogenic System Milestones TT10 Vent Installation January 06 Cold Valve Box Fabrication April-July 06 Control System Development January-June 06 Surface Preparations May 06 Transfer Line Installation July 06 Cold Valve Box Testing October 06 Heater System Installation September 06 Cold Valve Box Installation November 06 Commissioning December 06

Harold G. Kirk Project Major Sub-systems FY05 Q4 FY06 Q1 FY06 Q2 FY06 Q3 FY06 Q4 FY07 Q1 Magnet Magnet Delivery Receiving Testing Integration Testing Shipping Installation Hg Jet System Fabrication Nozzle Development Optical Diagnostics System Testing ORNL System Testing MIT Shipping Installation

Harold G. Kirk CERN Infrastructure FY05 Q4 FY06 Q1 FY06 Q2 FY06 Q3 FY06 Q4 FY07 Q1 Power Supply Site Preparations Installation DC Cabling AC Cabling Interlocks Commissioning Cryogenics TT10 Vent Cold Valve Box Fab. System Testing CERN Surface Preparations Tunnel Installations Commissioning