Test Beams Around the World (well, a very small world…) CERN (transparencies from Horst Breuker from CERN AIDA meeting) DESY (transparencies from Norbert.

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
ESTB Test Beam Procedures User Support Operations Schedules Carsten Hast March 17 th 2011.
ESTB Test Beam Upgrades Hadrons Shorter bunch length Carsten Hast March 17 th 2011.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
CERN Machine Protection – A Future Safety System? Introduction 1 SMP = Safe Machine Parameters System which receives accelerator.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
SETTING UP YOUR BEAM IN THE EAST AREA The secondary beam lines are controlled partly by local electronics in the EBCR control room, partly from two Linux.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
East Area Secondary Beam Control User Guide Revised version after LS1 L.Gatignon / EN-MEF 5 January 2015.
J.-P. Riunaud PS/AE PSMB 16/09/2002 Report from 59 th SPSC meeting 03/09/2002 OPEN SESSION on Tuesday, 3 September 2002 at 09:00, Main Auditorium 1. Proposal.
WG7: 2014 RD51 Test Beam Brief introduction to the RD51 semi-permanent test beam area H4 (mostly for our Indians colleagues) News & Reminder ( mostly for.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
H8-RD22 Experiment to test Crystal Collimation for the LHC Organized by: Walter Scandale Conducted at CERN Geneva, 27 September 2006 Participants included:
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
W. Scandale 1 Status of UA9 Walter Scandale CERN CC09 5 th workshop on crystal channeling March 2009.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Crystal channeling 2009 A. Afonin, IHEP, Protvino New results of use and research of crystals at U-70. A.Afonin, IHEP, Protvino 4- th Crystal channeling.
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
1 HiGrade Kick-off Welcome to DESY Hamburg Zeuthen.
LHC (and ATLAS) Status and Plans
The East Area Rende Steerenberg, ps/op PS-Days 2001 Evian.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
The End Station Test Beam (ESTB) at SLAC Carsten Hast For the everlasting never giving up SLAC Test Beam Gang R. Erickson, T. Fieguth, C. Hast, J. Jaros,
SLAC End Station A Test Beam ESTB Carsten Hast SLAC National Accelerator Laboratory ALCPG11 Eugene, Oregon March 22 nd, 2011.
GLAST LAT ProjectGlast Collaboration Meeting 2005 R. Bellazzini1 Glast beam test at CERN Glast Collaboration Meeting 2005.
MTE vs CT D.Manglunki for BE/OP - pictures from M.Giovannozzi - details in “Fifty years of the CERN Proton Synchrotron (Vol I)” CERN
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
CERN Test Beam Update and Schedule
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
End Station A Test Beam Facility ESTB Carsten Hast SiD Workshop SLAC, January 16-18, 2013,
CNGS Operation Summary Edda Gschwendtner, CERN. Outline Introduction CNGS Performance Highlights since last NBI 2010 in Japan Issues Summary 2E. Gschwendtner,
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
6 April 2006Malika Meddahi 1 CNGS Project: primary beam 1.Project Overview 2. Proton beam line overview and status 3. Target status 4. Commissioning preparation.
M.Moll, M.Silari, H.Vincke – 3.April Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN:
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Proposal for a test with the pure low-energy e Pasquale Migliozzi INFN Napoli.
Eduardo Nebot del Busto (1) CERN, Geneva, Switzerland (2) The University of Liverpool, Department of physics, Liverpool, U. K (3) The Cockcroft Institute,
05 Novembre years of research in physics European Organization for Nuclear Research.
DESY. Status and Perspectives in Particle Physics Albrecht Wagner Chair of the DESY Directorate.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
Overview on the Proposal for a new GIF, August Page 1 Overview on the Proposal for a new GIF Summary of the document distributed to the users and.
Test Beams: Availability & Plans  KEK  DESY  CERN  Fermilab  SLAC  Other Gene Fisk – Fermilab LCWS_2002 Jeju Do.
1/28 VISITS TO COMPASS / NA58 Seminar for guides 9 March 2005 Susanne Koblitz Gerhard Mallot.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC Calendar for 2004   March   May   30 June -1 July  
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
CERN accelerator chain (operating and approved projects)
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
Page 1 WP10.2: TA DESY- II Test Beam Facility AIDA-2020 First Annual Meeting Norbert Meyners, Marcel Stanitzki, Natalia Potylitsina-Kube DESY.
Outlook by the Physics Coordinator
Accelerator Research and Innovation for European Science and Society
DESY Test Beam Facilities - Status and Plan
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Test beam setup: status report 10/02/2009
EU Institution Board 1 representative of each participating institute
CERN Testbeam facilities
K. Kawagoe (Kobe-U) 30-Mar-2010 LCWS10 in Beijing
A summary of world-wide test beam facilities
End Station Test Beam (ESTB) at SLAC
Present and Future test facilities for High-intensity Targetry CERN
High Energy High Intensity Hadron Beams
Presentation transcript:

Test Beams Around the World (well, a very small world…) CERN (transparencies from Horst Breuker from CERN AIDA meeting) DESY (transparencies from Norbert Meiners for ALCPG11) Carsten Hast March 17 th 2011

Test Beams in Europe European AIDA initiative AIDA: Advanced European Infrastructures for Detectors and Accelerators 2011 to 2014 funds 28 Million Euros (8M from the EU) Funds among many other things access to the test beams at CERN and DESY It’s a European initiative but not a closed club, so in order to participate hook up with your friends abroad… 2 C.Hast, ESTB workshop SLAC, March 2011

Beam Facilities at CERN North Area SPS Test Beams East Area PS Test Beams

East Area PS Test Beams

*) Intensity is for 1% momentum bite, nominal target and ppp on target and intensity collimator(s) wide opened.  Spill 400 ms (could be > 500 ms at 20 GeV/c)  Some more intensity control exists for the primary beam ( ) and via the target efficiency (~ ). Typical Beam Parameters

CERN Test Beam 2010 AIDA Shifts : –600 (8h) in Test Beams –200 (8h) in Irradiation Facility Users at PS Test Beams : 20 Groups Users at SPS Test Beams : 46 Groups Users at Irradiation Facility : 18 Groups To apply for beam time and more info go to: 6 C.Hast, ESTB workshop SLAC, March 2011

CERN Schedule Test beams are available PS T9, T10, T11, SPS H2, H4, H6, H : begin May to mid November 2012 : begin May to mid November 2013 : no beams at all at CERN 2014 : maybe beams from the PS from mid of the year; Horst Breuker does not expect beams from the SPS 2015 : begin May to mid November everything depends on the performance of the LHC and its experiments; They have to reach 10 fb-1 in the run which started last weekend...

DESY Test Beam Facilities - Status and Plan Norbert Meyners, DESY ALCPG Workshop 2011 Eugene, March 19-23, 2011

Norbert Meyners, DESY Test Beam ALCPG 2011, Eugene, March 19-23, DESY Test Beam DESY provides three test beam lines with 1-5 (-6) GeV/c electrons Very simple system, no beam optics, just momentum selection via dipole magnet. Bremsstrahlung beam generated by a carbon fibre in the circulating beam of the electron/positron synchrotron DESY II. Photons are converted to electron/positron pairs with a metal plate. Beam is spread out into a horizontal fan with a dipole magnet. Collimator cuts out final beam.

Norbert Meyners, DESY Test Beam ALCPG 2011, Eugene, March 19-23, Test Beam Layout T21 T22 T24T24/1 MD Magnet MVD Telescope PCMAG AIDA Telescope

Norbert Meyners, DESY Test Beam ALCPG 2011, Eugene, March 19-23, Facilities for Test Beam User All three test beam lines have Interlock systems Magnet control Patch panels with preinstalled cables Gas warning systems Fast internet connection (DHCP) (100Mbit / 1Gbit possible) The user can ask for: Translation stages Premixed gases Big Dipole Magnet (1T) Superconducting Magnet (1T) Beam Telescopes: MVD Telescope MVD Telescope AIDA Telescope AIDA Telescope The users typically bring: Data Acquisition incl. computers Trigger scintillators

Norbert Meyners, DESY Test Beam ALCPG 2011, Eugene, March 19-23, Review User Groups 53 Weeks scheduled Severe accident Vacuum leak at one carbon fibre holder Unfortunately two were dismantled  lost two beams for 5 weeks (May/June)  Luckily we could squeeze all user in one beam area (24) Water leak at dipole magnet (24) (end May)  1 user lost 1 day  Provisional fix stayed until regular maintenance week Uff!  Exchange dipole magnet   Design and build new fibre holders   Installation in summer 2011 Leak Fibres Fibre Current Fibre Target

Norbert Meyners, DESY Test Beam ALCPG 2011, Eugene, March 19-23, Summary DESY test beam is running: Feb July 10 and Aug Dec. 21; 2011 Users can apply for beam time through DESY test beam coordinators  up to three weeks possible, longer terms negotiable testbeam.desy.de You can apply for test beam time at DESY Or contact: You can apply for financial support See aida.web.cern.ch

Summary Test Beams available: 2011 CERN, DESY, FNAL and a little bit ESTB 2012 CERN, DESY, ESTB (possibly hadrons later in ‘12) 2013 DESY, ESTB, FNAL 2014 CERN (maybe), DESY, ESTB, FNAL 2015 CERN, DESY, ESTB, FNAL ESTB will be a much appreciated addition to the dwindling portfolio of possible test beams 14 C.Hast, ESTB workshop SLAC, March 2011