Progress Report – Design of Native Wetland Nursery Facility Design of Native Wetland Nursery Facility For Metro’s Native Plant Center Prepared by: Portland.

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
Roamingwood Wellhead Protection Capture Zone Prepared by: Mr. Brian Oram, PG, MS Mr. Bill Toothill, MS Wilkes University Geo Environmental Sciences and.
APEX Engineering Ian Braun Andrew Halley Jorge Hernandez Mohamad Haikal Bin Maamor PROPOSED HUALAPAI MUSEUM SITE DESIGN 1.
Preliminary Design of Galvez Estates Subdivision.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
3-1 Utility Conflict Identification and Management Lesson 3.
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
Collection Systems for Community Wastewater Systems CAWPCA Spring Meeting April 26, 2013 Dave Prickett, PE.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Where are the regulations going? Dan Cloak Environmental Consulting May 23, 2011.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
Overview of Urban Drainage Flood Prediction Methods and Approaches J.Y. Chen1 and B.J. Adams2 1. Water Survey Division, Environment Canada 2. Department.
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
Shale Gas Drilling Deep Creek watershed SURFACE DRILLING CONSTRAINTS SPATIAL ANALYSIS EXERCISE.
Hydrologic Theory One of the principal objectives in hydrology is to transform rainfall that has fallen over a watershed area into flows to be expected.
Hydrological Modelling of Small Scale Processes in a Wetland Habitat O. M. JOHANSEN, J.B. JENSEN & M.L. PEDERSEN Aalborg University, Department of Civil.
Environmental Consultants BMI Environmental Services, LLC AN OVERVIEW OF THE WETLANDS REGULATORY PROCESS AS IT RELATES TO THE PROPOSED OCEAN SPRINGS HIGH.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
BASICS OF SURVEYING Ivy Tech Community College. Surveying Definition DEFINITION The art and science of making such measurements as are necessary to determine.
Wes Marshall, P.E. University of Connecticut May 2007 CE 276 Site Design Final Exam Outline.
This training was prepared by the U.S. Department of Agriculture (USDA) team of Sarah Librea-USDA Foreign Agricultural Service (Team Leader), Jon Fripp.
Engineering Hydrology (ECIV 4323)
Fort Bragg Cantonment Area Cape Fear River Basin LIDAR data have been used to create digital contours and topographic maps. 1.A Digital Elevation Model.
Sanitary Engineering Lecture 16
For Stormwater Treatment and Flow Control Dan Cloak Environmental Consulting December 14, 2010 Contra Costa Clean Water Program.
BUILDING YOUR RAIN GARDEN. Garden Location Where does water flow from? Where does water travel or collect? Observe your yard during a rainfall event.
Rural Development Water and Waste Projects: Environmental Requirements John Helgren, P.E. – State Environmental Coordinator Madeline Crowe – Assistant.
FNR 402 – Forest Watershed Management
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
VOLUME CONTROL using Inter-Event Dry Periods by Marty Wanielista, Josh Spence, and Ewoud Hulstein Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA.
Conservation Strategies for Growing Communities. The Growth of Urban Conservation.
Leila Talebi (3/28/2012).  The existing land use of Cincinnati Zoo consists of various types including parking lot, open space areas, and steep wooded.
Rush River Assessment Project Hydrologic Flow Study Sibley County SWCD Presentation to the Minnesota River Research Forum March 10, 2005.
Project Our group collaborated with students at the University of Zacatecas (UAZ) to accomplish the following: 1- Create an accurate hydrologic model which.
Stormwater Management: TCNJ Townhouses South
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Patrick Roach Robert Arena ET-493 Fall 2014 Instructor: Dr. Cris Koutsougeras Advisor: Edward Rode.
Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright North Carolina Department of Public.
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
Soil Quality Measurement Unit: Soil Science Lesson 7.
Patrick Roach Robert Arena ET-493 Fall 2014 Instructor: Cris Koutsougeras Advisor: Edward Rode.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Surface Water Supplies Joe Zulovich Extension Agricultural Engineer Commercial Agriculture Program.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
STORM WATER STORAGE AND TREATMENT
Nashville Zoo at Grassmere Stream and Water Quality Improvements Quality Improvements Littlejohn Engineering Associates, Inc. Civil & Environmental Consultants,
Marin County Watershed Stewardship Program Marin County Department of Public Works.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Environmental Factors In this module, we will discuss: Environmental legislation Environmental hazards Due diligence Conducting an environmental.
City of Pacifica 1. Why is this Project necessary? 2 City has a history of sanitary sewer overflows (SSOs) – January 2008 storm caused SSOs throughout.
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
Village of Naples and Hazlitt 1852 Vineyards Sewer Feasibility Study.
Aaron Cosentino City of Elgin Rob Linke, P.E., CFM Trotter & Associates, Inc. Lord Street Basin CSO Green Infrastructure Retrofit Project November 14,
Comprehensive Thinking and Planning
RESEARCH AND DEMONSTRATION CENTER ON-LOT SYSTEMS AND SMALL FLOW TECHNOLOGIES DELAWARE VALLEY COLLEGE DOYLESTOWN, PA Project Funding Provided by: Pennsylvania.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
RESIDENTIAL RAINWATER HARVESTING PROJECT ALTITUDE ENGINEERING, INC. PRESENTERS: HAYLIE BREWER, ERICA KIESOW,& BRETT HIGHTOWER DATE: APRIL 28 TH,
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
GOOSE CREEK WATERSHED LEVEL I STUDY SCOPING MEETING
USDA -Natural Resources Conservation Service
Effects of persistent drought on Lake Mead and the Las Vegas Valley
Site plan The plat map A plat map is the first step in development of a site plan. It delineates property lines with bearings, dimensions, streets, and.
IRRIGATION PRINCIPLES
Storm Water Storage and Treatment
بسم الله الرحمن الرحيم (وقل ربي زدني علما)
Presentation transcript:

Progress Report – Design of Native Wetland Nursery Facility Design of Native Wetland Nursery Facility For Metro’s Native Plant Center Prepared by: Portland State Department of Civil and Environmental Engineering Senior Design Class, 2009

Department of Civil and Environmental Engineering Senior Design Class Native Wetland Nursery Design for Metro’s Native Plane Center Project Overview Native Plant Center is a Metro-operated nursery in Tualatin, OR Located on south banks of Tualatin River Cultivates native plants for Metro’s various habitat restoration projects Project proposal is to expand the Native Plant Center by building a wetland nursery facility in adjacent lot ProposedWetlandNurserySite NativePlantCenter N

Department of Civil and Environmental Engineering Senior Design Class Native Wetland Nursery Design for Metro’s Native Plane Center Project Scope Design a series of shallow pools that will serve as planting beds for native wetland plants Supply pools using multiple water sources – surface runoff, Tualatin River water rights Pools will have overflow-protection system to guard against damage from extreme storm events Pools will have a water depth control system to accommodate growing requirements for different plant species Proposed facility must allow for access by personnel for planting and harvesting activities Cost will be significant in design considerations

Department of Civil and Environmental Engineering Senior Design Class Native Wetland Nursery Design for Metro’s Native Plane Center Feasibility Study 1.Survey – High resolution elevation contours, setback boundaries, water lines 2.Geotechnical – soil classification/distribution, water infiltration rates 3.Water runoff model – predict flow rates and volumes of water from various intensity storm events 4.Literature review – Overview current design provisions for constructed wetlands, relevant permitting issues and constraints

Department of Civil and Environmental Engineering Senior Design Class Native Wetland Nursery Design for Metro’s Native Plane Center Survey Pools will be constructed by grading, requires high-resolution elevation data (elevation contours from Metro were insufficient for design) Survey conducted with Leica SmartPole™ GPS survey station –simple, quick alternative to total station survey –position resolution capable of 0.02 feet (latitude, longitude, mean sea level) Positions recorded then downloaded into AutoCAD Land Development –Automatic generation of elevation contours from survey data –Allow for 3D visualization of design and development of grading plan

Department of Civil and Environmental Engineering Senior Design Class Native Wetland Nursery Design for Metro’s Native Plane Center Survey Results Contours from MetroNew GPS Survey Contours 10’ Contours 1’ Contours Water line tie-ins SepticSetback

Department of Civil and Environmental Engineering Senior Design Class Native Wetland Nursery Design for Metro’s Native Plane Center Geotechnical Investigation Field/Laboratory Tests Soil samples for soil classification and compaction tests Test infiltration rates on-site where pools will most likely be constructed Infiltration TestSoil Sampling

Department of Civil and Environmental Engineering Senior Design Class Native Wetland Nursery Design for Metro’s Native Plane Center Geotechnical Investigation Results Soil is low-plasticity ML silt, uniformly distributed Measured infiltration rates – in/min (sample A) in/min (sample F) A F A B C D E F Soil collection Sites (0 – 9 ft deep) Infiltration Tests

Department of Civil and Environmental Engineering Senior Design Class Native Wetland Nursery Design for Metro’s Native Plane Center Surface Water Runoff Model Pools will be supplied from multiple sources – (water pump rights, runoff) Surface water runoff model will help establish how much water is available from storm events Surrounding areas were partitioned into different basins Rational model used to predict peak flowrates for 3 cases Case I – runoff from Native Plant Center only Case II –runoff from Native Plant Center and all surrounding areas Case III – runoff from Native Plant Center and field to south Model CaseBasins I1, 2, 3, 4 II1, 2, 3, 4, 5, 6, 7 III1, 2, 3, 4, 7

Department of Civil and Environmental Engineering Senior Design Class Native Wetland Nursery Design for Metro’s Native Plane Center Surface Water Model - Results Case I - Q Longest route (time, min)23.3tctc i (in/hr)Q (cfs) Q2Q Q Q Q Case II - Q Longest route (time, min)41.4tctc i (in/hr)Q (cfs) Q2Q Q Q Q Case III - Q Longest route (time, min)33.6tctc i (in/hr)Q (cfs) Q Q Q Q

Department of Civil and Environmental Engineering Senior Design Class Native Wetland Nursery Design for Metro’s Native Plane Center Feasibility Summary Survey – –Elevation contours sufficient for grading design –Septic tank setback will prohibit construction of pool on north half of proposal site Geotechnical – –Uniform soil type and distribution across site –Infiltration rates too high to allow for sufficient hydraulic residence times for pool – amending soil with bentonite and soil compaction will be necessary Water Model – –Capture of water from neighboring sites may be costly and of low quality –Predicted flow rates from Case I suggest that irrigation from Tualatin River will be required to fill pools

Department of Civil and Environmental Engineering Senior Design Class Native Wetland Nursery Design for Metro’s Native Plane Center Tasks for Spring Term Pool Design – –Finalize specifications for decreasing infiltration rate (bentonite, compactions), Grading, overflow protection, water depth regulation, berm design Cost Estimates – –Addition of french drain for water runoff capture, irrigation piping, possible on-site storage outside of pools Final Proposal – –Design drawings and specifications, budget, feasibility report

Department of Civil and Environmental Engineering Senior Design Class Native Wetland Nursery Design for Metro’s Native Plane Center Special Thanks Marsha Holt-Kingsley – Metro Native Plant Center Coordinator Brad Bogus, PE – Kennedy/Jenks Consultants The survey guy

Department of Civil and Environmental Engineering Senior Design Class Native Wetland Nursery Design for Metro’s Native Plane Center Questions?