Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD. 20771 301-286-2213 FAX 301-286-0343 -

Slides:



Advertisements
Similar presentations
Larry Phillips MAY 13th-17th, 2002 Micro Arcsecond Xray Imaging Mission: Pathfinder (MAXIM-PF) Launch Vehicle Information Final Version.
Advertisements

Magellan – Venus1:48 scale Score all fold lines and cut out the parts. The actual Magellan spacecraft was virtually all white – some model parts are blacked.
Mechanical Systems Analysis Branch/Code 542 Goddard Space Flight Center Analysis of Damping Treatments Applied to the MAP Spacecraft Scott Gordon Code.
Launch Vehicles. LAUNCH SYSTEM CONCEPTS SHROUD PROTECTS THE SPACECRAFT SHROUD PROTECTS THE SPACECRAFT MAIN VEHICLE PRIMARY LIQUID OR SOLID ROCKET PROPELLANT.
1 Interstellar Heliopause Probe M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010 Interstellar Heliopause Probe (IHP) System Design.
Payload Design Criteria for the Space Test Program Standard Interface Vehicle (STP-SIV) Mr. Mike Marlow STP-SIV Program Manager Payload Design Criteria.
Delta II –7920 Fitup Study Model TMA-56 f10 optics In-Line configuration Delta II Launch Vehicle 7920 H 10L Composite Fairing.
AAE450 Spring 2009 Mass Savings and Finite Element Analysis (FEA) Preparation for Orbital Transfer Vehicle (OTV) 100 gram Case Tim Rebold STRC [Tim Rebold]
1 Atlas Truss Adapter & Launch Vehicle Details (all I can find in the Atlas Mission Planner’s Guide and Standard Interface Spec) David Robinson/543 7/18/08.
Spacecraft Subsystem Introduction to Space Systems and Spacecraft Design Space Systems Design.
Gateway to Space AJ - 1 Mechanical System Design & the StarLight Project Andy Jarski Mechanical Systems Engineer Ball Aerospace & Technologies.
Rocket Power – Part 2 Introduction to Rockets and Missiles Scott Schoneman 4 Nov 03.
Constellation Orion Visible Light Constellation Orion Infrared Light.
Final Version Bob G. Beaman May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Electrical Power System (EPS)
Observatory - Overview July 13 & 14, 2010MMS I&T Pre-CDR Peer Review 1 Single Observatory Stowed.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
Student Satellite Project University of Arizona Team Goals Design, Fabricate, and Analyze a Structure that will Support the Payload –Space Allocation of.
1 Mirror subsystem: telescope structure Functions: Functions: Support mirrors subsystem to S/C Support mirrors subsystem to S/C Accommodate cryostat Accommodate.
1 NASA’s Goddard Space Flight Center 2005/4/14 LRO/CRaTER Technical Interchange Meeting LRO Mechanical Systems Giulio Rosanova / /
Bob G. Beaman June 28, 2001 Electrical Power System SuperNova / Acceleration Probe (SNAP)
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
ReVeal Passive Illumination by Radar (PAIR). Overview Payload / Mission Communication Launch Orbit Power Thermal Attitude Propulsion Finance.
Chapter 24 Space Vehicular Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Mars Reconnaissance Orbiter1:48 scale READ ALL THE INSTRUCTIONS AND INSPECT THE PARTS SHEETS FIRST. Score fold lines and cut out the parts. High Gain Antenna.
Satellites and Launch Vehicles. “Gee Whiz” Facts Number of satellites currently in orbit is over 900 Satellites orbit at altitudes from 100 miles (Low.
Determinate Space Frame Telescope Structures for SNAP Bruce C. Bigelow University of Michigan Department of Physics 7/28/04.
GSFC 5 Space Technology “Tomorrow’s Technology Today” ST5 PDR June 19-20, 2001 Launch Vehicle Services Section 18.0 Clyde Woodall Launch Vehicle Manager.
© Lavochkin Association, 2013 Ganymede Lander mission overview.
Galactic Bulge Time On Target May These charts examine the compatibility of a 500 day microlensing program with a 6 month SNe observing program.
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
AAE450 Spring 2009 Finite Element Analysis (FEA) for Orbital Transfer Vehicle (OTV) Tim Rebold STRC [Tim Rebold] [STRC] [1]
AAE450 Spring 2009 Support structure for Orbital Transfer Vehicle (OTV) Tim Rebold STRC [Tim Rebold] [STRC] [1]
Spacecraft Interface/Handling Ring Robert Besuner 12 August 2004.
LAUNCH VEHICLE DOWNSELECT A Wide Variety of Launch Systems Are Available Today Initial Downselect Constraint Based Upon UMRM Requirements Primary Payload.
1 The slides in this collection are all related and should be useful in preparing a presentation on SIM PlanetQuest. Note, however, that there is some.
Juno Mission To Jupiter NASA New Frontiers Program Launch Date: Aug. 5, 11:34 a.m. EDT Launch Period: Aug. 5 – 26 (~60 min window) Launch Vehicle: Atlas.
Henry Heetderks Space Sciences Laboratory, UCB
NASA/Air Force Cost Model presented by Keith Smith Science Applications International Corporation 2002 SCEA National Conference June
Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing.
Final Version Dick Bolt Code 302 May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Success.
1 About this model This model employs 3 inverted ‘bipods’ for baffle. Bipods in quotes because legs are not pinned at ends, but are fixed-fixed. No skins.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
Lower Baffle Robert Besuner 26 August Background/Purpose This study follows on to 12 August study of the Spacecraft Interface/Handling Ring. —In.
Jeff Bolognese p1 Super Nova/Acceleration Probe 16 November 2001 Structural Analysis Jeff Bolognese 16 November 2001.
1 System Architecture Mark Herring (Stephen Merkowitz Presenting)
Competition Sensitive Gabe Karpati June 28, 2001 SuperNova / Acceleration Probe (SNAP) System Overview.
Small Satellite Conference - GEMS Presentation August 12, 2009 Big Astrophysics in A Small Package Erin Walter GEMS Spacecraft Lead/Orbital.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
20c - 1 NASA’s Goddard Space Flight Center Propulsion Chuck Zakrwski NASA/GSFC Code 597 August 16-17, 2005.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
WFIRST Large-cell structure concept design Preview Work in progress 3/4/2016Robin Lafever1.
EXTP Accomodation Study Hong Bin, Zhang Long Institute of Spacecraft System Engineering. CAST Oct 27th, 2015.
Be P16102 Constrain Subsystems House Internals Provide Access Mount components securely Stow Solar Panels Gather Solar Energy Expose Panels before Deployment.
ACE Science Workshop March 10 th, 2009 Armin T. Ellis, Deborah Vane, Mark Rokey Jet Propulsion Laboratory.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
Ares V an Enabling Capability for Future Space Science Missions H. Philip Stahl, Ph.D. NASA MSFC.
 From SmallSat to CubeSat: Reducing Mass Size and Cost Jeremy Straub 1, Ronald Fevig 2, Todd Borzych 2, Chris Church 2, Curt Holmer 2, Martin Hynes 2,
Date of download: 5/29/2016 Copyright © 2016 SPIE. All rights reserved. Drawing of the Space Infrared Telescope for Cosmology and Astrophysics (SPICA)
AAE 450 Spring 2010 AAE 450 2/11/2010 Kathy Brumbaugh Chris Spreen
Spacecraft Technology Structure
Planetary Lander PDR Team Name
GLAST Large Area Telescope:
Integrated Thermal Analysis of the Iodine Satellite (iSAT) from Preliminary to Critical Design Review October 20th 2016 Stephanie Mauro NASA Marshall Space.
1. Introduction and Overview
Henry Heetderks Space Sciences Laboratory, UCB
Inputs on HPM EPS, SEP Stage Block II configuration, and comments on 10/2 presentation package Tim Sarver-Verhey 10/1/2001.
Mars Rover CDR Team Name
THERMAL CONTROL SYSTEM
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX

Overview See if the dual spacecraft MAXIM configuration can be accommodated on a single U.S. launch vehicle. Present a trade study comparing launch vehicles Present a concept that can meet mission requirements: - Launch and orbit configuration * Payload Instruments placements * Structural mass summary

Spacecraft Mechanical Overview The baseline will be 2 Mission Unique Spacecraft ( MUS): - Use of commercial parts and subsystems - Accommodate the Detector Instruments and Optic Instruments - Provide accommodations for a dual wing fixed solar array panels (total area= 6 meters ^2), for the detector spacecraft. - Provide accommodations for a fixed semi ring solar array panels (total area= 7 meters ^2), for the optic spacecraft. - The Optics spacecraft will interface to the Delta IV 5m dia. X 19.8 m long/ PAF - The core structure will be made-up of aluminum honeycomb panels, aluminum truss, fittings, brackets, diagonals and stringers. Note- Due to the time element in preparing this presentation, I baseline aluminum material, however due to the thermal sensitivity the structure material most likely would be composite. This would increase cost and fabrication complexity, but would decrease mass. In either case, this is do-able in the design. Mechanical Overview (continue) Spacecraft Description: The general shape is circle, cylindrical, square, rectangular, hexagonal, octagonal. The size is 4m by 3 m long. Interfaces to the launch via 3712 PAF, and is launch on DELTA The core structure will be made-up of aluminum honeycomb panels, truss, ring fitting, brackets, diagonals, and stringers. The spacecraft is considered an Open-Architecture-Configuration. ƀ The subsystems are mounted externally on structural members ƀ They are expose and cover with thermal blankets. The spacecraft is considered an Closed-Architecture-Configuration. ƀ The subsystems are mounted internally on structural members ƀ These subsystems are mounted shear panels, thrust tube or radials.

Launch Vehicle Trade Study Based on Performance to C3 = 0; Mass = 4100kg; Volume = 3.25 dia X 14.5 m Access Mode Candidates  No Foreign Launch Vehicles Investigated (Space Policy-buy American)  Delta II and III do not meet C3 performance requirements  Delta IV:  S,M, M+(4,2 &5,2 config.) do not meet C3 performance requirements  M+ (5,4) config. meets C3 performance requirements but does not meet fairing volume envelope  Heavy meets C3 performance requirements and fairing volume envelope  Atlas V:  Core and core plus 2 strap-on do not meet C3 performance requirements  Core plus 4 or 5 strap-on meet C3 performance requirements but does not meet fairing volume envelop for the 5m short or medium PLF  Heavy meets C3 performance requirements and fairing volume envelope  Lockheed Martin studying (via a KSC task) whether the stretched version of the medium PLF (5.4 m dia.X 26.5 m) can be used on the medium EELV launch vehicles (Results expected in a couple of months)  Boeing studying (via a KSC task) whether the heavy fairing (5 m dia. X 19.8 m) can be used on the medium EELV launch vehicles (Results expected in a couple of months)

Launch Vehicle Performance Baselined 8/18/99

For this study the Delta IV/5m/19.8m was baseline Launch vehicle will: Meet lift-off (mass) requirements +20% (actually approx.. 50%, as of 8/19 AM) Meets volume requirements LAUNCH VEHICLE

Delta IV (H) 5m diameter x 19.8m long Launch Fairing Removed Detector Spacecraft (2.2m) Optics Instruments (10m) Optic Spacecraft Systems (2.2m) Baffling LAUNCH CONFIGURATION 15.5 m 16.4 m Payload Spacecraft

ORBIT CONFIGURATION Optic Spacecraft Detector Spacecraft Solar Array (7 m^2, projected area)

Different views of the Optic space- craft Spacecraft sub- System This view the spacecraft subsystems removed OPTIC SPACECRAFT (DIFFERENT VIEWS)

This is the far end away from the detector spacecraft This is the viewing end toward the detector spacecraft Solar Array Propulsion Tanks (4) OPTIC SPACECRAFT (ON ORBIT)

Range lasers (4) Aspect Interferometer Walter Telescope Aspect Interferometer Walter Telescope Electronics X-Ray Interferometer OPTIC Instrument (rotated) OPTIC Instrument with support structure Note- The X-Ray Interferometer has been removed form clarity OPTIC INSTRUMENT

Stowed Orbit Payload Spacecraft Spacecraft Subsystems are mounted in this volume Fixed Solar Array (6m^2 shown) DETECTOR SPACECRAFT

Detector / CCD/ QC Cryogenics and Baffle Range Sensors and Baffle DETECTOR PAYLOAD INSTRUMENTS

Detector Baffle Range Sensors Range Sensors Baffle Detector / CCD/ QC Cryogenics Enlarged View of Baffle DETECTOR SPACECRAFT Payload Volume

TOP LEVEL SPACECRAFT BUS MASS SUMMARY Mass(kg)/per unit Total Mass(kg)

TOP LEVEL SPACECRAFT BUS MASS SUMMARY Mass(kg)/per unit Total Mass(kg) Amendment 8/20/99

SYSTEM LEVEL MASS SUMMARY (preliminary)

Conclusions: Mechanically this mission is feasible: - As of this phase of the study the dual spacecraft configuration can be accommodated on a single launch vehicle. * Using the Delta IV, DIV-H 5 m diameter x 19.8 m long fairing * Meets the minimum 20% mass margin * Meets the volume margin Launching two spacecraft always lower the frequencies due to the two separations, however with the extra mass margins you can increase the structural integrity of the structure by adding structural members and increasing cross sectional areas. The separation system between the Optic spacecraft and Detector spacecraft has yet to be worked out. This is not a trivial matter, I’m not aware of a 3 m + diameter marman ring at this time. Note- According with the Titan IV folks, anything that fit's inside this fairing the PAF can handle with reference to C.G. locations.