2/24/20021 SCP Regulation-- History History –Numerous policies and LTLs have been issued since 1977 with various technical and reporting requirements –

Slides:



Advertisements
Similar presentations
Compliance Dates The final rule was published on January 25, 1995,
Advertisements

EMS Checklist (ISO model)
Lessons Learned from the Application of Risk Management in the Shipment of LNG.
© 2014 HWCG LLC SCAA Annual Meeting 1 HWCG HWCG Mutual Aid.
[Organisation’s Title] Environmental Management System
Field Operations and State-Managed Plugging Overview
DEQ Mission By the end of the decade, Virginians will enjoy cleaner water available for all uses, improved air quality that supports communities and ecosystems,
Summary of NEPA and SEPA Coastal Engineering and Land Use Issues in North Carolina Greenville, NC January 13, 2009 Sean M. Sullivan.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Gas Gathering Update Pipeline Safety – Getting to Zero Pipeline.
1 February 10, 2014 Presented By: Michael E. Parker, P.E. Parker Environmental and Consulting, LLC Hydraulic Fracturing Best Management Practices Comments.
Subpart S - SEMS September 11, 2012 Prepared by: BSEE, Office of Safety Management Author: Jason Mathews.
Louisiana Department of EnvironmentalQuality LDEQ CAM Plan Overview LDEQ’s 27 th Annual Conference on the Environment Cajundome Convention Center Lafayette,
API 6AV1 and API 6A Comparison
1 Before and After Macondo: Offshore Safety and Environmental Regulation in Historical Context Tyler Priest C.T. Bauer College of Business University of.
APAC PBN Seminar F.LECAT (ICAO)
Cover graphic should fill and not exceed the defined grey box. June 27, 2013 Gary Devlin API Subcommittee 18 – Quality Task Group 7: Product Life Cycle.
Cover graphic should fill and not exceed the defined grey box. June 14 th, 2012 Gary Devlin API SC 18 – Quality Product Life Cycle TG7.
Elements of Internal Controls Preventing Fraud, Waste, and Abuse in Urban and Rural Transit Systems.
API Subcommittee 17 Industry Standards for Subsea Equipment
Environmental hazards What are the procedures in your workplace for managing environmental hazards? What is a hazard? How can hazards be managed?
Continuing Review VA Requirements Kevin L. Nellis, M.S., M.T. (A.S.C.P.) Program Analyst Program for Research Integrity Development and Education (PRIDE)
IS-700.A: National Incident Management System, An Introduction
1 ISTOG Position on Pre-conditioning ISTOG Input on Interpretation and Clarification Of NUREG-1482 Sections 3.5 / 3.6.
1 HPHT Equipment Development Process Presented by Jim Raney Based on the work from 6HP.
System-Based SH&E Management Case Study
Ship Recycling Facility Management System IMO Guideline A.962
After Deepwater Horizon: The New Offshore Regulatory Regime 66 th annual Oil and Gas Law Conference Houston, Texas February 20, 2015 Copyright © 2015 by.
By: Gatut Widianoko Weatherford Artificial Lift Systems
Basics of OHSAS Occupational Health & Safety Management System
1 Supplements and Other Changes to an Approved Application By: Richard J. Stec Jr., Ph.D. February 7, 2007.
NIST Special Publication Revision 1
ISO 9000 & TOTAL QUALITY ISO 9000 refers to a group of quality assurance standards established by the International Organization for Standardization.This.
March 26, 2015 Ashley Kish ENVIRONMENT OF CARE RISK REDUCTION PROGRAM.
Current Inspection Process for Operators of Hazardous Liquids Pipelines Rod Seeley OPS SW Region Director May 18, 2005.
ELEMENT 2: DEALING WITH EMERGENCY SITUATIONS. LEARNING OUTCOMES As you go through this element you will acquire the necessary knowledge, skills and attitudes.
ISO/TC67/SC4/WG3 meeting Brazil 10 th may 2006 Surface-Well head and xmass tree Eq. Scope: Standardization of wellheads and xmass trees as used in the.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
Hazards Identification and Risk Assessment
An Industry Response to the Expected Control Room Management Rule Western Regional Gas Conference Daron Moore – El Paso Pipeline Group August 25, 2009.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
API RP 6HP (draft 5.2) Status Presentation Tech Session II Summer Standards Conference.
California Integrated Waste Management Board Update On Long-Term Postclosure Maintenance And Corrective Action Financial Assurances Activities Permitting.
Gulf Coast Environmental Affairs Group
Title V, Preliminary Completeness Review. What do I need to do?  I need to find out if the application contains the required information.  Initial Title.
API 18LCM (Life Cycle Management) Report back to SC17 August 27, 2015 Review Team: Dave Wilkinson, John Strut, Smarty John, David Saul, Peter Moles.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
1 US EPA Straw Proposals for Modifying the 12/2005 draft Policy Statement Jim Hanlon, Director Office of Wastewater Management, OW Expanded Steering Committee.
High Consequence Areas & Pipeline Assessment Intervals Pipeline Safety Trust New Orleans, LA November 20, 2008 Elizabeth Komiskey, P.E. PHMSA/Office of.
Jacques Vanier ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 SAFETY MANAGEMENT SYSTEMS SAFETY PERFORMANCE.
Office of Pipeline Safety Remedial Action Review Protocol Integrity Management Workshop July 23-24, 2002.
OHSAS Occupational health and safety management system.
Health and Safety Executive Health and Safety Executive The Regulatory Framework for UCG– HSE’s perspective Tony Almond Redacted Health and Safety Policy.
To Satisfaction of the Administration Seminar on the Implementation of measures to ensure that safety standards are “to the Satisfaction of the Administration.
1. 2 Cost & Price Analysis Breakout Session # 312 Beverly Arviso, CPA, Fellow, CPCM, CFCM, Arviso, Inc. Melanie Burgess, CPA, CFCM, Burgess Consulting,

APAC PBN Seminar F.LECAT (ICAO)
(Simultaneous operations)
Potential Risks, Limitations, And Failure Mechanisms Arising From Fastener Design, Manufacture, Material, And Coating Selection Prepared for the National.
OHS Staff Introduction Training
ISO 14001:2015 Identifying Aspects And Impacts
Recommended Draft Policy ARIN : Post-IPv4-Free-Pool-Depletion Transfer Policy Staff Introduction.
Identification of Children with Specific Learning Disabilities
Employee Performance Management System
ISO 14001:2004 Aspects And Impacts
GTAC Workshop Block 1 10 July 2018.
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
Hydraulic Fracturing Best Management Practices Comments and Considerations Presented By: Michael E. Parker, P.E. Parker Environmental and Consulting, LLC.
Identification of Children with Specific Learning Disabilities
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Presentation transcript:

2/24/20021 SCP Regulation-- History History –Numerous policies and LTLs have been issued since 1977 with various technical and reporting requirements – OOC has worked with MMS since 1988 –Over 8000 wells (11,000 casing strings) in the GOM have SCP

2/24/20022 SCP Regulation-- History Reported Uncontrolled Well flow—MMS Records –2 wells—underground blowouts (1987, 1992) –1 well—communication with another well—source was shallow water sand (1987) –1 well—flow between prod and inter csg (1976) No injuries have occurred Minor pollution from one incident No reported uncontrolled well flow from subsea wells or hybrid wells

2/24/20023 SCP Regulation-- History When is pressure on the casing an unacceptable risk? –OOC report from 1989 Did not answer the question—set criteria for wells which do not pose a hazard, took no position on wells that did not meet criteria 1000 psi based on imposed gas lift pressure, represents 14-28% of MIYP of common casing designs 20% of MIYP or 1000 psi represents 50% or less of MIYP of the next outer string

2/24/20024 SCP Regulation-- History When is pressure on the casing an unacceptable risk?, Cont’d –LSU Study, July 31, 2001 Technical criteria based on the ratio of casing pressure to its strength and the ability to bleed to zero pressure are arbitrary to some degree

2/24/20025 SCP Regulation-- History OCS Order 6, Aug 28, RulemakingLTL 1991LTL 1994 Wellhead Equipment Connections to permit fluid to be pumped between any 2 strings of csg Wellhead equipped--all annuli monitored for SCP Wellhead equipped so that all annuli can be monitored for SCP Monitoring None MonthlyNot specified Reporting NoneImmediate notification to Dist. Supervisor All csg pressure (except drive or structural) immediately reported to Dist Supervisor Testing Wells showing SCP on the casinghead or leaking gas or oil between the prod csg and next string: well killed and pump pressure applied. If casinghead pressure reflects pump pressure the casing is condemned. None< 20% Yield and Bleed to 0 --Not submitted to MMS --Rerun psi on inter or prod psi on cond or surf >20% Yield/ Do Not Bleed to 0 --Submit to MMS for approval < 20% Yield and Bleed to psi on inter or prod psi on cond or surf >20% Yield or Do Not Bleed to 0 --Submit to MMS Region office for approval Subsea Wells Remote --same as above Manual—2 year interval

2/24/20026 SCP Regulation— Proposed Rule Fixed Platform Wells –Technical Criteria Arbitrary basis—assumes all pressure is a hazard, no distinction between pressure sources No distinction between pressure containing casing and structural casing Testing protocols are extremely prescriptive Imposes a different criteria for non active wells versus active wells that doesn’t appear to be based on risk

2/24/20027 SCP Regulation— Proposed Rule Fixed Platform Wells, Cont’d –Process Very burdensome on both MMS and Industry Technical basis for monitoring and diagnostic test requirements is unclear Timeframe for submitting the diagnostic tests is unrealistic

2/24/20028 SCP Regulation— Proposed Rule Subsea Wellheads –Confusion between wellhead and tree –Potential hazards are not the same as for platform wells –Imposition of dry wellhead regulations on wet wellheads does not have a sound technical basis –Impacts the design of the subsea system, not just the wellhead –Subsea systems are not of consistent design and application

2/24/20029 SCP Regulation— Proposed Rule Floating System (Hybrid Wells) –Subsea wellhead, dry tree –Little experience with this type well –Systems are not of a consistent design –No technical or risk basis for proposed limits –Limits the development of hardware and operating practices

2/24/ SCP Regulation— OOC Proposal When does pressure on the casing pose an unacceptable risk? –3 Prong Approach Third party study of casing pressure and risk Develop an API RP on casing pressure Re-evaluate risk study used as a basis for API Spec 17D subsea wellhead design

2/24/ SCP Regulation— OOC Proposal When does pressure on the casing pose an unacceptable risk?, Cont’d –Develop a risk based recommended practice based on the findings from the 3 rd party study Risk to personnel, equipment, environment Casing design Pressure source Monitoring Testing protocols Diagnostics Remediation Documentation

2/24/ SCP Regulation— OOC Proposal When does pressure on the casing pose an unacceptable risk?, Cont’d –Address all types of wells and pressures appropriately Fixed Platform Subsea Hybrid SCP and Unsustained casing pressure

2/24/ SCP Regulation— OOC Proposal When does pressure on the casing pose an unacceptable risk?, Cont’d –Monitoring Requirements for Subsea Wellheads Re-evaluate risk associated with wellhead design in API Spec 17D

2/24/ SCP Regulation— OOC Proposal Reporting procedure –Work with MMS to establish appropriate reporting procedures that are not overly burdensome on MMS or Industry

2/24/ SCP Regulation— OOC Proposal MMS either withdraw proposed rulemaking or hold it in abeyance until RP is developed Existing LTL (1994) remain in effect for platform wells until RP is completed and adopted into regulation Subsea wells and hybrid wells continue to be handled on a case-by-case through the DWOP process

2/24/ SCP RP for Each Well Type Typical Well Schematics Description of Hardware Summary of Design Elements Other Considerations Potential Sources of Pressure Potential Leak Paths Monitoring and Diagnostic Methods Intervention/Remediation Methods Risk Assessment (by contractor)

2/24/ SCP RP Time Line