DR HOUSE PROJECT Development of Rapid Highly-specialized Operative Units for Structural Evaluation DR HOUSE PROJECT – Patras Exercise, 2-5 October 2012.

Slides:



Advertisements
Similar presentations
Client Resource Requisition Position Mapping & Sourcing the Resumes Prospect Evaluation & Screening & Scheduling the Interviews.
Advertisements

Patras RUnUP Thematic Network Closing Conference Dr. Ioannis Kostopoulos 12 May 2011.
DR HOUSE PROJECT Development of Rapid Highly-specialized Operative Units for Structural Evaluation DR HOUSE PROJECT – Patras Exercise, 2-5 October 2012.
DR HOUSE PROJECT Development of Rapid Highly-specialized Operative Units for Structural Evaluation DR HOUSE PROJECT – Patras Exercise, 2-5 October 2012.
MODULE 3. MANAGING EMERGENCY RESPONSE Dick Evans.
Chapter 29 Mass-Casualty Incident Management. Chapter 29: Mass-Casualty Incident Management 2 Discuss the various environmental hazards that affect the.
Dealing with Different Student Abilities: “Thinking outside the Answer Box” Mary Sanseverino UVic Dept of Computer Science June 10, 2003.
Exercise Exercise3.1 8 Exercise3.1 9 Exercise
Exercise Exercise Exercise Exercise
Exercise Exercise Exercise Exercise
Exercise Exercise6.1 7 Exercise6.1 8 Exercise6.1 9.
Hellenic Open University (HOU) Founded in 1997 Greek State University that provides distance education in both undergraduate and postgraduate levels The.
Enhancing Volunteer Awareness and education against Natural Disasters through E-learning (EVANDE) Dr C. Fassoulas, Project Coordinator Natural History.
Work programme Identifies eligible actions for financial assistance on a yearly basis under Union CP Mechanism in prevention, preparedness and public awareness.
T EAM STEPPS 05.2 Mod Page 1 Introduction Mod Page 1 1 Module 1 Introduction Tower Team Building Exercise* *This exercise was developed by.
MATILDA Project Bruxelles, 20 January 2015 Kick off meeting for the selected projects under the 2014 Call for proposals for prevention and preparedness.
Letter of intent By to predefined format (Word file, see guidelines) Chair Scientific Committee Coordination EO To all members of.
The Integrated Pilot Comprehensive Exercise (IPCE) Briefing to the U.S. Nuclear Regulatory Commission’s 21st Annual Regulatory Information Conference Marc.
1 The National Research Center for Border Security and Immigration (BSI)
Multidimensional Security in the Americas. INTRODUCTION 1.Where are we today? 2.Achievements (How and where?) 3.Our future 4.Realities.
Mass-Casualty Incident Management PART-III. Chapter 29: Mass-Casualty Incident Management 2 Discuss the various environmental hazards that affect the.
Objectives 4 Understand the importance of communication in projects 4 Understand the need and importance of project management.
© 2014, Florida Department of Education. All Rights Reserved. Florida Principles and Standards for Quality Charter School Authorizing Building.
NONPROFITS VOTE 2014 CAMPAIGN: AN OVERVIEW Presented by.
Section 4.7 Inverse Trigonometric Functions Pg
COMPLETING A LEADERSHIP OBSERVATION MARZANO SCHOOL LEADERSHIP
Unit 7: Task Force Demobilization & After Action Considerations.
© 2014 The Litaker Group LLC All Rights Reserved Draft Document Not for Release or Distribution Texas Department of State Health Services Disaster Behavioral.
Copernicus Gesellschaft © Copernicus Gesellschaft The Two-Stage Publication Process for Journals published by Copernicus Gesellschaft Foster scientific.
Ministry of Defence Sweden SWEDISH CIVIL PROTECTION.
October 11 st Period  Novel selection: read by Oct. 16, AR Test  Show time!
1 Crisis Management and Communication Dr. Joy Smith and Ms. Robin Denny.
1 st Special Nursery School of Patras Greece. Our school is situated at Patras, middle of Greece, 200 km west of Athens.
IAEA International Atomic Energy Agency Arusha, Tanzania Uganda Dr. Akisophel Kisolo Project Counterpart 2 – 5 December 2013 RAF9038 Final Coordination.
EVALUATING INVERSE TRIG EXPRESSIONS WITH COMPOSITIONS AND VARIABLES DR. SHILDNECK.
Contact Us.
BSA 385 Week 5 Team Assignment Smith Software Testing Environment Paper And Presentation Check this A+ tutorial guideline at
BSA 411 Week 5 Team Assignment Business System Analysis Methodology Plan Paper and Presentation Learning Team Business System Analysis Methodology Plan.
BSA 502 Week 3 Team Assignment Human Resources Paper ( Riordan Manufacturing) The paper discuss the existing HR systems within Riordan Manufacturing, Inc.
BSA 502 Week 4 Team Assignment Operations and Logistics Systems Paper (Riordan Manufacturing) Check this A+ tutorial guideline at
BSA 502 Week 5 Team Assignment Legal Issues (Riordan Manufacturing) Check this A+ tutorial guideline at 502/BSA-502-Week-5-Team-Assignment-
BSA 502 Week 6 Final Team Assignment Business Systems Paper and Presentation (Riordan Manufacturing) Learning Team Riordan Manufacturing Paper Finalize.
… is a Federation of Mediterranean NGOs
Workshop activities with animals during lessons
International Conference SMART CITIES & MOBILITY AS A SERVICE
How To Add A Xerox Printer To Google Chrome
ASSIGNMENT NO.-2.
Frio River Cabins - Frio Vacation Homes - Frio Country Resort
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses

HUM 200 Enthusiastic Studysnaptutorial.com
Customize Your Jewelry Christine K Jewelry
Supervisor Mentor Program
PHY105 Observing the Night Sky
TITLE - TITLE - TITLE Subtitle – Subtitle - Subtitle
Migration and resettlement
The system of state aid control in the Czech Republic
Itcoinitcoin ASAS. 4 I4 I,
LAMAS Working Group December 2013
Subtracting Real Numbers
2018 ALL-CITY FOOTBALL: OPEN DIVISION
Executive Order No. 23 Update Air & Waste Management Association Conference November 16, 2018 Presentation will focus on the latest policy development.
DISTAFF MEDIA WORKING GROUP
Dr. Popi KONIDARI Assistant to the Project Coordinator
Regional Coordination Group on SDG4-Education 2030 (West and Central Africa) Retreat UNESCO Regional Office Dakar, 8 December 2016.
October 2014 Star Data Prior to the C.A.F.E. Reading Initiative these were the results attained.
Graphic Design Semester 1 Final Exam
Firebase Vs. MongoDB: Choose the Best Database of 2019
Meet Us
Contact Us
Presentation transcript:

DR HOUSE PROJECT Development of Rapid Highly-specialized Operative Units for Structural Evaluation DR HOUSE PROJECT – Patras Exercise, 2-5 October 2012 DR HOUSE PROJECT Development of Rapid Highly-specialized Operative Units for Structural Evaluation THE LEMA

DR HOUSE PROJECT Development of Rapid Highly-specialized Operative Units for Structural Evaluation DR HOUSE PROJECT – Patras Exercise, 2-5 October 2012 DR HOUSE PROJECT Development of Rapid Highly-specialized Operative Units for Structural Evaluation

DR HOUSE PROJECT Development of Rapid Highly-specialized Operative Units for Structural Evaluation DR HOUSE PROJECT – Patras Exercise, 2-5 October 2012 Always in strict contact with ICPD International Unit LO General Secretariat for Civil Protection Port formalities Data flow to Athens

DR HOUSE PROJECT Development of Rapid Highly-specialized Operative Units for Structural Evaluation DR HOUSE PROJECT – Patras Exercise, 2-5 October 2012 Western Greece Civil Protection General support to the exercise Contacts with Police and Port Authorities Police Escort from Patras Port to BoO and from BoO to Patras Port

DR HOUSE PROJECT Development of Rapid Highly-specialized Operative Units for Structural Evaluation DR HOUSE PROJECT – Patras Exercise, 2-5 October 2012 Service for Rehabilitation (YAS) and local offices (TAS) Technical activities Pre-team meeting (TLs and ICPD Coordination) Meeting with BSA for team composition (1 st day) Debriefing meeting with BSA module (1 st day) Debriefing meeting with ASA module (1 st day) Debriefing meeting with STC module (1 st day) Meeting with BSA for building assignment (2 nd day) Final meeting with TLs (2 nd day)

DR HOUSE PROJECT Development of Rapid Highly-specialized Operative Units for Structural Evaluation DR HOUSE PROJECT – Patras Exercise, 2-5 October 2012 Pre-team meeting (TLs and ICPD Coordination)

DR HOUSE PROJECT Development of Rapid Highly-specialized Operative Units for Structural Evaluation DR HOUSE PROJECT – Patras Exercise, 2-5 October 2012 Meeting with BSA module

DR HOUSE PROJECT Development of Rapid Highly-specialized Operative Units for Structural Evaluation DR HOUSE PROJECT – Patras Exercise, 2-5 October 2012 Team composition

DR HOUSE PROJECT Development of Rapid Highly-specialized Operative Units for Structural Evaluation DR HOUSE PROJECT – Patras Exercise, 2-5 October 2012 Debriefing meeting with BSA module (1 st day) Back