ROADWAY SAFETY IMPROVEMENT (RSI) ROAD SAFETY AUDITS & AUDIT REVIEWS CLIFF REUER TRAFFIC & SAFETY ENGINEER SDDOT OFFICE OF PROJECT DEVELOPMENT 605-773-5361.

Slides:



Advertisements
Similar presentations
ACEC Conference March 5, 2012 Trudy Elsner P.E., Metro Maintenance, Engineering Services Sheila Johnson P.E., Metro Maintenance, Traffic Services.
Advertisements

OR 42: County Line Curves Environmental Assessment Purpose and Need February 17, 2009.
December 5, 2011 Presented by: Sue DAgnese Region 1 Traffic Manager Overview of: ROAD SAFETY AUDIT (RSA) PROCESS & APPLICATIONS TV Highway at 185th Ave.
Construction Safety. ODOT Business Plan Moving Ohio into a Prosperous New World.
Presented by Nazir Lalani P.E TRAFFIC SAFETY EVALUATIONS (Pedestrians and Bicyclists)
Hot Springs Public Meeting Reconstruction of US 18 & US 385
Assessing and Managing Risk
A Comprehensive Study on Pavement Edge Line Implementation Presented by: Mark J. Morvant, P.E. Associate Director, Research Louisiana Transportation Research.
Highway Safety & Wildlife: A National Perspective October 24-25, 2005 Patrick Hasson National Technical Service Team Leader Safety and Design FHWA Tel:
NH Route 28 Corridor Safety Audit Preliminary Analysis of Historic and Existing Conditions.
“ Pavement markings can enhance safety since centerlines have been shown to cut crash frequency by 29% compared to roads without them ” Wisconsin Transportation.
6-1 Lesson 6 | Practice RSA. Perform a practice-RSA of a design-stage or an in-service road. Analyze data acquired from site visit or design plans and.
1 SDDOT SAFETY PROGRAM. 2 Who Am I ??? CLIFF REUER TRAFFIC & SAFETY ENIGNEER SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION OFFICE OF PROJECT DEVELOPMENT
Learning Outcomes Identify safety issues unique to local and rural areas. Identify common challenges to improving road safety. Explain why road agencies.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Road Safety Audits Ghazwan al-Haji PhD student ”On whats goes wrong in road design and how to put it right safely”
Access Management: Why And How? An Introduction To Access Management Problems, Principles and Treatments.
Safety Audit Components Safety assessment for risk Management.
Worksession Crash Impediments Ordinance Orange County BCC May 5, 2015.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Safety Project Request received by TDOT Safety Project Request sent to RSAR Coordinator Safety Planning Office completes Letter of Findings for internal.
Road Safety Audit CEDR SG „Road Safety“ Eva M. Eichinger Copenhagen, April, 2004 Road Safety Audit General Introduction Eva M. Eichinger, M.Sc., Ph.D.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Countermeasures That Work Transportation Safety Conference Pierre, SD February 22, 2007.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
1 ADOT Road Safety Assessment Program Presented to NACOG Technical Subcommittee December 4, 2013.
All Roads Transportation Safety (ARTS) Program Hot Spot ODOT Region 1 Kick-Off Meeting March 18, 2015.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
May 1, 2014 East Gude Drive Pedestrian Road Safety Audit Stakeholder Pedestrian Safety Meeting.
Construction Conference Construction Conference NDDOT’s: NDDOT’s: Future Federal Funding Future Federal Funding State Legislative & Budget issues.
Lesson 2 | Road Safety Issues 2-1. Learning Outcomes Define RSA. Explain the need for tools to improve road safety. Explain the role of GORE. Identify.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
Road safety audits on mining operations Damir Vagaja Manager Mining and Resources ARRB Group.
Overview of the DOTD Highway Project Selection Process.
Timothy E. Barnett, P.E., PTOE State Safety Operations Engineer Alabama Department of Transportation.
5-1 Lesson 5 | Common Issues & Challenges. Describe how RSAs address project schedule (time), project cost, and agency liability concerns. Explain the.
Strategic Highway Safety Plan Update Jerry Ortbahn SDDOT Project Development.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
March 20, 2011 Presented by: Sue D’Agnese, Region 1 Traffic Manager Overview of: ROAD SAFETY AUDIT (RSA) PROCESS & APPLICATIONS OR210 Scholls Ferry Rd:
Roadside CE 453 Lecture 23. Sideslopes – Foreslope (Backslope) Design 1.Considerations: Stability and Vehicle Recovery a.if slope “>” 3:1 use barrier.
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
Kansas DOT Research Project Implementation Presented By Rick Kreider (Chief of Research) Created By Susan Barker (T 2 Engineer)
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
Construction zones and traffic control Objective Review extent of problem Identify contractor responsibilites Identify control plan components.
1 THE HIGHWAY SAFETY MANUAL Michael S. Griffith Federal Highway Administration July 26 th, 2004.
Intro to Driving Part 2 Mobility Study guide and Notes.
Road Safety Audits Road School, 2011 Rick Drumm, P.E. Safety Engineer Federal Highway Administration.
Steps 6 to 8 Lesson 4 | The Eight-Step RSA Process 4-86.
Connecting South Dakota and the Nation Access Management Training Brooke White, Access Management Engineer.
2017/2018 Black Spot Program Workshop Jana Geisler Program Development Coordinator Budget and Program Management.
Module 5 Terena Wibecka Lauren Megan Block 1X. Processing Information 1.A driver needs visibility, space, and time to safely operate a vehicle. 2.A vehicle.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
LOW COST SAFETY IMPROVEMENTS Practitioner Workshop The Tools – Identification of High Crash Locations – Session #2.
INDOT Office of Traffic Safety Manager, Mike Holowaty
PRESENTATION OF MONTENEGRO
Regional Road Safety Workshop
Earhart Elementary September 2017
Learning Outcomes Describe ways to incorporate and implement practical safety solutions during projects and maintenance. Identify potential sources of.
Project Status & Right-of-Way Acquisition
Interdisciplinary teams Existing or new roadway
Jefferson County Planning Commission Hearing April 10, 2013
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Highway Safety Team Staff Meeting SMART Portal HSIP Application Demonstration Systemic Safety Improvement (SSI) November 21,2017.
Safety Audit Components
School of Civil Engineering
Alex Henry FDOT District Seven Safety Office
Presentation transcript:

ROADWAY SAFETY IMPROVEMENT (RSI) ROAD SAFETY AUDITS & AUDIT REVIEWS CLIFF REUER TRAFFIC & SAFETY ENGINEER SDDOT OFFICE OF PROJECT DEVELOPMENT

Roadway Safety Improvement (RSI) 90% Federal funds. Locations with above average number of accidents. Accident records search – 5 accidents in 3 year period. Locations submitted by Regions, Class 1 Cities, & Highway Patrol.

Conducting RSI Inspection Look for accident pattern. Analyze collision diagram. Calculate accident rate > 2.0. Benefit Cost > On site inspection by RSI Team. Program in STIP.

Accident in South Dakota

Class 1 Cities with 5 + Inter

City of Pierre Inter

City of Rapid City Inter

I-190/West Blvd & SD44/Omaha

I-190/West Blvd & SD44/Omaha – p.1

I-190/West Blvd & SD44/Omaha – p.2

I-190/West Blvd & SD44/Omaha

City of Pierre Mid Block

Rural Crashes State System

Crash Summary (Rural I-90 E. of S. Falls)

Crash Summary (I-90 E. of S. Falls - p2 )

Crash Details ( Rural I-90 E. of S. Falls) P 1 of 3

Rural Off State System

Animal Crashes Rural – State & Local (2005) Green = Wild Purple = Domestic Total = 5011

Rural Animal Hits Near Sioux Falls

Road Safety Audit (RSA) A Road Safety Audit is an examination of a future roadway project, by an independent audit team, focusing solely on safety.

Road Safety Audit Review (RSAR) A Road Safety Audit Review is an examination of an existing roadway, by an independent audit team, focusing solely on safety issues. RSA & RSAR are proactive while historical safety programs are reactive.

Conducting the Audit/Review Is a Formal Process. Tailored to your issues. Both processes use an independent audit team approach. Team should consist of Traffic/Safety, Design, Construction & Maintenance expertise, SDLTAP…… If on Local Roads – Local entity should be represented

Conducting the Audit/Review (2) Audit can include on site review. Audit Review is an on site review. Audit results in a report to the designer. Audit Review report to the owner.

Use of Crash Data The RSA & RSAR use crash data as background information. Funding through the federal program still tied to crashes. South Dakota has funding in State Transportation Improvement Program (STIP) to address RSAR findings.

Audit of Proposed Project Conduct when designer has plans % complete or before plans review process. Designer reviews and presents plans to audit team.

Audit Considerations Design standards used. Need for acceleration & deceleration lanes. Review turning templates. Parking removal. Access management. Sight restrictions

Audit Review of Existing Roads Used to identify safety deficiencies of existing roads. Are safety needs of road users being met? Has the use of the roadway changed over time. Have standards changed. May be performed on a newly opened road.

Audit Review Considerations Steep in slopes. Edge drop off. Sight distance restrictions. Need for safety pipe ends. Obstacles in clear zone/right of way. Surface defects Signing and striping deficiencies

Audit Review Findings Divided into three categories –Immediate safety improvements that should be made – Vegetation, Delineation in clear zone, signing. –Low cost improvements that could have a positive impact on safety – Signing, Clear the clear zone. –High cost improvements that should be considered when funds are available for a major rehabilitation – Construction, Re- construction.

Liability Concerns Can we be sued? List of needs protected by Sec 409. Best not to ignore safety related items. Defense - Creates plan to be completed as funds become available.

Summary RSA & RSAR can be applied to all roads. Can be proactive – don’t have to wait for accidents. Can identify design changes & low cost fixes. Can be used as a punch list for short term fixes and in planning long term needs. Liability should not be a concern.

QUESTIONS ??