TRAIN OPERATIONS IN THE GARDEN

Slides:



Advertisements
Similar presentations
Create a Detailed CTC Machine Model with JMRI/PanelPro
Advertisements

Railcar 101 The Basics of Railcars: Car Types, Components and Rules
Radio Etiquette Training
Card Order Basics. Card Order Basics What is It? –An advanced scheme for operating a model railroad –Allows for a realistic means of determining what.
TRANSPORTATION PROCEDURES. WHY DO WE DO THIS? Child safety is our top priority Ensures that each child is picked up by a proper parent or guardian every.
National Capital Trackers at York 2014 Justin Krause George Tsakiris Co-Trackmasters.
Model RailRoad Manager Simulate Prototype Operations on your Railroad.
Getting Started in Operations Presented by Bob Weinheimer MMR National Model Railroad Association Mid Central Region Convention April 2012.
Model Railroading Operations 101: Part 4 – Advanced Topics Seminar - Tom Crosthwait President, Mogollon & Southwestern RR & Fred Bock, MMR, Chief Dispatcher,
Operations on the BDMRR Dispatching for the Birmingham District Model RR.
Dr. Abdulr-Razaq SH. Hadde
Or Stop that train going round and round It’s making me giddy!! This presentation will run itself – no batteries required. If you are using Internet Explorer.
Signal Basics. Signals: –Allow for safe operation of trains – protecting your train, other trains, and the equipment –Lets the railroad operate more efficiently.
In this presentation you will:
Local Switching Operations Steve Prevette PNR Vice President Burnt Hills and Big Flats RR
Freight Car Forwarding Steve Prevette Burnt Hills & Big Flats RR Pasco WA Fluor Hanford City University.
Card Order Update Training March TOPICS Operations –Why, What & How –Call Board –Yards & Permissions –Operating Tips –Manifests Interactive Lessons.
Model RailRoad Manager Quick Start: Automated Traffic Generation.
CE 515 Railroad Engineering Line-haul Operations Source: Armstrong Ch 13 “Transportation exists to conquer space and time -”
DC Motors electrical machine1 J 2006.
DCC on the Pacific Southern Brief History House built in 1953 by Bob Latham O-scale layout initially Changed to HO around 1960 Club started in 1964 Layout.
Realistic Operations for Model Railroaders by R. B. Trombley, MMR PSR – NMRA Rev May, 2011.
Traffic Flow Analysis Steve Prevette Burnt Hills & Big Flats RR Pasco WA Fluor Hanford City University.
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 1-6 Monday 11/20.
EE 306 DC MACHINES Hatem Al-Ghannam
DC MACHINES By. Sajid Hussain Qazi DC Motor 2  The direct current (dc) machine can be used as a motor or as a generator.  DC Machine is most.
CE 515 Railroad Engineering Armstrong Chapter 8: Railroad Operation – Moving From Here to There “Transportation exists to conquer space and time -”
TRANSPORTATION PROCEDURES. WHY DO WE DO THIS?  Child safety is our top priority  Ensures that each child is picked up by a proper parent or guardian.
ACACSO Car Service Rules 7 to 12 November 11, 2014.
LEDs IN MODEL RAILROADING Jim Hinds Richmond Controls.
CE 515 Railroad Engineering Unit-Train Operations Special Freight and Package Services Source: Armstrong Ch 14 & 16 “Transportation exists to conquer space.
Using Model Railroad Switch List Software
Model RailRoad Manager Inventory Management. Inventory: Rolling Stock and Everything Else l Locomotive, Freight Cars, Passenger Cars, Caboose, MOW l Trackage.
CHAPTERS 1 and 2 o Advantages of Railroad Concept o Problems Early On o Economics Common Goal o Development of the Country o Common Goal CE 433.
OPERATIONS – A Starter Kit
B&O CAR CARD AND WAY BILL OPERATIONS. INTRODUCTION To date, the B&O model railroad has directly written switch-lists for movement of cars. By moving to.
Model Railroading Operations 101: Part 4 – Advanced Topics Seminar Tom Crosthwait President, Mogollon & Southwestern RR & Fred Bock, MMR, Chief Dispatcher,
Office of Railroad, Pipeline and Hazardous Materials Safety Collision of Metrolink Passenger Train 111 and Union Pacific Freight Train LOF65-12 Signal.
R. J. Corman Railroad Group 1 Greg Deakle Director – Port and Waterway Intermodal Operations.
9/13/20151 The flow of electrons M Tommasi. 9/13/20152 Electric current Static electricity is the…….. The flow of e - in a wire is called an electric.
Click when ready... Team round This round will last for approximately 2 hours. There will be no break. If you wish to leave for a toilet break or to.
Model Railroad Operations Prepared by Dick Roberts, MMR My thoughts on the subject, presented with the assistance of all those operators who have gone.
Lecture 12.  The ISBN 10-digit uses a reverse weighting system: multiply the first digit by 10, the second by 9, the third by 8 and so on until the check.
X Hobitton/The Shire and Bag End. Gandalf and the Dwarves drop in on Bilbo unexpectedly, and his adventure begins… Hobitton/The Shire and Bag End. Gandalf.
Any path along which electrons can flow is a circuit.
THUNDERBIRD ACADEMY Building Tomorrow’s Leader Today.
DC Machines.
Erie Consolidated Lime Co.Lakeview Building Materials SW Yard Throat SW 97 - Lakeview West Dame MouldingDonco Twistboard Products East Lakeview West.
© ART 2012 TWS. © ART 2012  Provide an easy-to-use system to manage key information about train movements through the network  Manage track workers.
CONSOLIDATION OF RAILROADS What is Consolidation? What is Consolidation? Bringing several in to one. Bringing several in to one. Consolidation leads to.
CHAPTER 8 RAILROAD OPERATIONS. The “Average” Freight Train !!! No Contract Rates Paperwork Path (EDI) Demurrage Two Primary Documents.
Flashlights. Question: If you remove the 2 batteries from a working flashlight and reinstall them backward so that they make good contact inside, will.
1 BLUE SIGNAL PROTECTION Blue Signal Protection of Workmen This rule outlines the requirements for protecting railroad workmen who are inspecting,
Concepts of Engineering and Technology Copyright © Texas Education Agency, All rights reserved. 1.
What Will We Do If Our Oil Supply Runs Out?. What Will We Do Click here to get an answer! If Our Oil Supply Runs Out?
Operations on the Pennsylvania Southern Railroad Presented by Bob Weinheimer 2009 Version.
Electricity and Circuits I can describe an electrical circuit as a continuous loop of conducting materials. I can combine simple components in a series.
 Every sign’s shape and color have special meaning  Regulatory Signs: Signs that set limits, or give commands.  Example: stop sign, Yield, One Way,
+ Electric Circuits Series Circuits. + A Battery and a Bulb A flashlight consists of a reflector cap, a light bulb, batteries, and a barrel-shaped housing.
CE2303 Railway Engineering
Richmond Railroad Museum
Do It Yourself Timetable
Burnt Hills and Big Flats Railroad Employee Training
TRIODE TUBES.
Fry Word Test First 300 words in 25 word groups
An Introduction to VEX IQ Programming with Modkit
Operations on the Pennsylvania Southern Railroad Presented by Bob Weinheimer MMR National Model Railroad Association Cleveland 2014 July, 2014.
Series & Parallel Circuits
Second Grade Sight Words
Andy Stobie’s Indoor G scale layout
Presentation transcript:

TRAIN OPERATIONS IN THE GARDEN DONALD NUTE http://laketownandshire.net 2009 SEGRS

What do you do in an operating session? Run trains with a purpose. Transport passengers and/or freight from point of origin to destination. Construct trains with cars headed in the same direction. Pick up and drop off cars at industries. Arrange for trains to meet and/or pass each other.

Three questions that need to be answered to operate trains. How do I design my layout for the kind of operations I want? How will the trains be controlled? How will cars be dispatched?

How do I design my layout for the kind of operations I want? Real railroads operate from point-to-point. For operations on garden railroads, shorter trains seem to work best. Some shortline railroads like the ET&WC only operated one train on their line at a time. Many railroads operate several trains at once, sometimes in different divisions.

Simple one train operation

Adding Industries and Stretching the Line

Passing Siding for Two or Three Trains

How will the trains be controlled? DC – traditional track power – block wiring for multiple trains. DCC – Digital Command Control track power – simple wiring for multiple trains. Battery power with radio control – no wiring, cheaper aluminum track can be used. Live steam – probably not feasible.

DC – traditional track power – block wiring for multiple trains. Track is powered with low voltage DC current. Direction and speed controlled by changing polarity and voltage of current. Remote control possible without modifying locomotives. Simple wiring for one locomotive. Track must be divided into blocks for multiple locomotives.

DC block wiring with engine parking.

DC block wiring with passing sidings

Digital Command Control – running your trains instead of your track. Track is powered with low voltage AC current instead of DC current. Digital signals are sent over the track to decoders in each locomotive. Multiple trains can go at different speeds in different directions. Must install a decoder in each locomotive. Only need one track block.

Battery power with radio control. Track is not powered. Batteries must be carried in locomotive or in battery car behind locomotive. Multiple trains can go at different speeds in different directions. Must install a radio receiver in each locomotive. Batteries must be recharged.

How will cars be dispatched? Switch Lists Way Bills Simplified Way bills Paperless Car-Routing System

Switch list Leave Hobbiton at 8:00 with LT&S 1234 boxcar MERR 5678 gondola Arrive Mirkwood Forest at 8:30 pickup LT&S flatcar 9012 at Lumber Camp pickup LT&S flatcar 3456 at Lumber Camp Arrive Mines of Moria at 8:47 drop MERR 5678 at Coal Mine Arrive Lake Town 3 at 9:13 drop LT&S 1234 at Industrial Supply drop LT&S 9012 at Lumber Mill drop LT&S 3456 at Lumber Mill

Way Bills Car #: 1234 Owner: LT&S Car type: boxcar Load: widgets Destination: Industrial Supply, Laketown Car #: 5678 Owner: MERR Car type: gondola Load: empty Destination: Coal Mine, Mines of Moria

Simplified Waybills LT&S 1234 boxcar Hobbiton, Widget Factory Laketown, Industrial Supply Laketown, Lumber Mill Hobbiton, Pallet and Crate MERR 5678 gondola Mines of Moria, Coal Mine Hobbition, Widget Factory Laketown, Lumber Mill

Paperless Car-Routing System Assign a different color to each town or major industrial siding. Assign a letter to each industry. Prepare train cards with instructions and town/industry codes. Prepare tags (steel washers work well for garden railroads) with appropriate color-letter combinations. Place an appropriate tag on each car.

Train cards – a simple example

Train cards – town/industry side Hobbiton A. Pallet and Crate B. Widget Factory Mirkwood Forest C. Lumber Camp Misty Mountains D. Coal Mine Lake Town E. Lumber Mill F. Industrial Supply

Train cards – instruction side Train 100, east-bound, starts in Hobbiton and ends in Laketown. Drop off all cars routed for Mirkwood Forest and the Mines of Moria as you reach the sidings. Deliver cars to Laketown industries. Leave your engine on the Industrial Supply siding and give this card to the dispatcher.

Train cards – instruction side Train 101, west-bound, starts in Laketown and ends in Hobbiton. Drop off all cars routed for Mirkwood Forest and the Mines of Moria as you reach the sidings. Deliver cars to Hobbiton industries. Leave your engine on the Widget Factory siding and give this card to the dispatcher.

Colored washers indicate car destination

A loop-to-loop design lets you turn engines.

A loop-to-loop design with a turntable can operate as two divisions.

Yard design for operations Switching problems can be fun, but they are a pain in the neck during an operating session. DON’T BUILD A SWITCHING PROBLEM INTO YOUR LAYOUT. Real railroads arranged track to make switching as easy as the circumstances would allow. Design your yards for easy switching.

Simple “yards”

Rivendell Yard on the Lake Town & Shire

No-Switching Operating Session

No-Switching Operating Session This is a good mode when you have a lot of operators with little experience. Assign one train to each operator. Each train stops at each passing siding or reverse loop until the dispatcher gives it clearance to go to the next passing siding or reverse loop. No cars are switched.

Multiple operating modes on the Lake Town and Shire No Switching mode Two Divisions mode End-to-End mode

Operations on the Laketown & Shire DCC track power; manual switching. Monthly operating sessions. Ages six and up. Two-man crews for switching modes. Paperless Routing System. Dispatcher moves routing tags as needed. Separate loop for training and very young operators.