Continuous Flow Intersection March, 2007. Why are we here? Discuss Continuous Flow Intersection compared to Standard Intersection Update permit status.

Slides:



Advertisements
Similar presentations
NICHOLS SCHOOL TRAFFIC OPERATIONS STUDY. Existing Operations Examined Data Collection  On-site Count Collection of Representative Traffic Conditions.
Advertisements

Fixed Time Signal Coordination
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
Transportation Engineering
INTRODUCTION TO TRANSPORT Lecture 3 Introduction to Transport Lecture 4: Traffic Signal.
City of Little Rock Public Works – Traffic Engineering Division City of Little Rock City of Little Rock Dallas Phasing Implementation Rodney Parham Road.
ECGD 4121 – Transportation Engineering I
At-Grade Intersection
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
Progressive Signal Systems. Coordinated Systems Two or more intersections Signals have a fixed time relationship to one another Progression can be achieved.
CTC-340 Signals - Basics. Terms & Definitions (review) Cycle - Cycle Length - Interval -. change interval - clearance interval- change + clearance = Yi.
Gresham Traffic Signal System Optimization A Comprehensive Evaluation of Corridor Performance After Deploying Adaptive Signal Control.
Lecture #6 Chapter 16: Principles of Intersection Signalization.
Lec 15, Ch.8, pp : Signal Timing (Objective)
Signals. Laneage Coding Examples.
Traffic Signal Warrants
CE 7670: Advanced Traffic Signal Systems
Highway Capacity Software Based on the Highway Capacity Manual (HCM) Special Report 209 Transportation Research Board (TRB), National Research Council.
Signal Timing Design Example Problems. Intersection of Michigan Avenue and Hewitt Road.
Chapter 17: Basic principles of intersection signalization (objectives) Chapter objectives: By the end of this chapter the student will be able to: Explain.
Unconventional Arterial Intersection Design University of Maryland Advanced Transportation Day Aug. 28th 2014 Traffic Safety and Operations Lab University.
CEE – Spring 2005 Lectures 16, 17 (Handouts, Chapter 24) Signal Timing and Coordination.
Lecture #11 Signal Coordination: Chapter 22. Objectives Factors affecting coordination Basic theory of signal coordination Application to arterial progression.
CEE – Spring 2005 Lectures 10 to 11 (Chapters 21, 22) Analysis of Signalized Intersections.
Module 5 Displaced Left Turn (DLT) Intersections
Transportation Engineering
Transportation Engineering
Signalized Intersection Delay Monitoring for Signal Retiming SafeTrip-21 Safe and Efficient Travel through Innovation and Partnership in the 21 st Century.
Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.
The Basics of CFI ABMB CFI.avi  At-Grade Intersection  Left-turns happen in advance of the main intersection  Movements occur simultaneously  This.
Center for Advanced Transportation Education and Research University of Nevada, Reno Presenter: Cui Zhou University of Nevada, Reno Center for Advanced.
Alternative Solution ONE Changes Phases from 4 to 6 based on the traffic demand of different movements; Optimizes Timing accordingly to minimize the overall.
AP Exam 2006 Open Ended Problem #2 Graphing Calculator Permitted.
ROUNDABOUT CHARACTERISTICS TTE DEFINITIONS TRAFFIC CIRCLE: u Any intersection designed around a central island ROUNDABOUT: u A traffic circle with.
Tshwane Line 1 Traffic Simulation Results October 2012.
INTRODUCTION An intersection is the general area where two or more highways join or cross, including the roadway and roadside facilities for traffic movements.
Grade separation.
Introduction to Transport
University of Minnesota Intersection Decision Support Research - Results of Crash Analysis University of Minnesota Intersection Decision Support Research.
Traffic Signal Timing Design Part II. Slide 2 What to do?  Distribute volume among lanes to Identify lane utilization Determine need for lane adjustment.
Problem 4: Okeechobee Road Stopped Control Analysis.
Roundabout Feasibility: Analysis Framework and Design Considerations Presented By: Jason D. Pack, P.E. Fred Choa, P.E.
Problem 4: Clifton Country Rd/Route 146 Intersection Base Case Phasing and Volumes Analysis Plans Description of Analyses Overarching Issues 4a: AM peak.
MIDCAP Maryland Intersection and Interchange Design & Capacity Analysis Program.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Case Study 1 Problem 3 Styner/Lauder Intersection Moscow, Idaho.
Consideration of Dual Left Turns at 82 nd Street Intersections & at 50 th Street Intersections City of Lubbock Citizens Traffic Commission By: Jere Hart.
Continuous Flow Intersection March, Why are we here? Discuss Continuous Flow Intersection compared to Standard Intersection Update permit status.
Chapter 191 Chapter 19: Elements of Intersection Design and Layout Make an initial sizing of the intersection Make an initial sizing of the intersection.
INTERSECTION MODEL COMPONENTS TTE 6815 K. Courage.
Problem 6: Route 146 Arterial Study We’re going to look at 7 intersections simultaneously: the Shenendehowa Campus entrance, Moe Road, Maxwell Drive, Clifton.
Lesson 2.3 Today’s Objectives: Describe the difference between broken yellow lines and broken white lines. Explain the differences between a shared left-turn.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
NC-54 at Farrington as Offset Intersection
Traffic System Management for “Tulkarem”
Lane Volume Allocation
2a. Fully actuated signal - Improved T intersection
Applied Technology and Traffic Analysis Program(ATTAP) MIDCAP & MUID
FM 518 By-pass Traffic Review
Highway capacity and Level of Service Analysis
Transportation Engineering Basic Queuing Theory February 18, 2011
Unsignalized Intersections
ARTERIAL INTERCHANGE Four exit ramp, split level (SPUI)
CE 3500 Transportation Engineering Saturation flow and signal LOS
Highway Engineering CE 431
BACKGROUND METHODOLOGY RESULTS OBJECTIVES CONTACT
The number in each lane indicates
Transportation Engineering Calculating Signal Delay February 23, 2011
Presentation transcript:

Continuous Flow Intersection March, 2007

Why are we here? Discuss Continuous Flow Intersection compared to Standard Intersection Update permit status Answer your questions

What is this and why?

CFI Benefits CFI is an at-grade design that provides comparable levels of vehicular flow to grade-separated interchanges at a fraction of the cost—and dramatic, long-term improvements over conventional at-grade approaches – ABMB Engineers

Benefits of CFI Improved Level of Service (LOS) Less Delay Increased Capacity More Mainline Green Time Existing: 80 sec out of 150, 53% Traditional: 54 sec out of 115, 47% CFI: 74 sec out of 115, 64%

Benefits of CFI Provides relief to entire system Gravois (MO 30) Gravois Bluffs Overall LOS D reduced LOS C Lower cost than grade separation More consecutive movements

Level Of Service Basically, average time each vehicle is stopped at a signal

Level Of Service Existing (current): LOS C, Delay 24.6 sec/veh Traditional LOS D, Delay 35.4 sec/veh CFI LOS B, Delay 17.3 sec/veh

Level Of Service % Increase in Traffic Traditional LOS F, Delay sec/veh CFI LOS C, Delay 29.5 sec/veh

Level Of Service WB PM Peak Hour - 2,890 veh/hr Traditional Delay sec/veh => 88.4 hours CFI Delay 29.5 sec/veh => 23.7 hours

Consultant’s Conclusion “Both types of intersection configurations studied (continuous flow, dual lefts)…will provide the necessary capacity to accommodate the projected 2010 peak hour volumes. However, the dual left-turn lane concept would operated to LOS F during peak hours, whereas the continuous flow intersection concept would operate at LOS C during these hours. Therefore, the latter configuration would accommodate greater thru traffic volumes along Hwy 30 in the future.”

How Does It Work?

CFI Left Turns

CFI Cycle

Traditional Cycle

Questions? Contact Information: MoDOT Customer Service ASK-MODOT