CTC-470 Construction Administration Project Management Concepts.

Slides:



Advertisements
Similar presentations
W E L C O M E.
Advertisements

Project Planning: Assembling a Mortenson “Integrated Work Plan”
Contract CloseOut.
Project Procurement & Contract Administration Jiwei Ma
Standards of Practice Course
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
Program Management Overview (An Introduction)
Project Management November 2, Introduction Eric Lemmons Customer Project/Program Manager III Gary Obernuefemann Business Consulting IV.
Project Management October 2011 Inf Sys 3810 Information Systems Analysis Fall 2011 Understand Project Management principles.
Project Management April 2015 Understand Project Management principles.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Project Close Out CTC-470.
Subcontracting. Subcontractors % of work is subbed –Significant impact on costs and schedule –Want to develop a working relationship with good.
ESTIMATING By Laith Jacob.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Managing Risk to Reduce Construction Claims (And Improve Project Success) Presented by Laurie Dennis, PE, CVS-Life, FSAVE.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
BUSINESS ECONOMICS AND ENTREPRENEURSHIP Aleš Tomek Hal Johnston.
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Cindy L. Menches, Ph.D., P.E., The University of Texas at Austin Electri’ International Annual Meeting, July 2007 Characteristics+ Planning Achieving Performance.
Construction Management: At Risk. PROJECT MANAGEMENT STRUCTURE: Contractual Relationships Owner Architect/Engineer General Contractor Sub Construction.
Summary of Changes to Other OSFC Roles February 21, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Procurement and Construction Management and Oversight What Board Members Need to Know Jerry Smiley, AICP 24 July 2013.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
 Journeyman  Management  Specialization  Teaching  Owning a business.
MULTIPLE PROJECT MANAGEMENT Presented by Clement Contracting Group, Inc. Montgomery, AL.
CONSTRUCTION MANAGEMENT CONSTRUCTION ENGINEERING & MANAGEMENT DEPT
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Project Management April 2013 Inf Sys 3810 Information Systems Analysis Spring 2013 Understand Project Management Principles 1.
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
CON 2001-CVE 4070 Construction Engineering Project Organization & Stakeholders Prof. Ralph V. Locurcio, PE.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Strengthening Partnerships: Shaping the Future Portland, OR June 6 th – 10 th, 2004 Planning for Success Implementing the California EDRS.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
{ Phases of Project & life cycle Prepared by: Syed ShahRukh Haider.
Agency Construction Management :CM NOT AT-RISK
Project Management and Risk. Definitions Project Management: a system of procedures, practices, technologies, skills, and experience needed to manage.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
Project Implementation Management for Success. Focus of Project Management  managing for results,  ensuring sustainability,  stakeholder participation,
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
Cost Estimating. –Process of collecting, analyzing and summarizing data –Prepare educated projection of anticipated cost of project –Prepared by PM or.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Construction Management At Risk Process
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
PM 586 GENIUS Education Expert/PM 586 GENIUS.com FOR MORE CLASSES VISIT
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
The Construction Process TimeCost Linked Schedules Linked Estimating Recipes The Building Model: 5D Concept.
1. WELCOME Project Management Cycle (P.M.C.) What is a project? : What is project management?: Project management life cycle : Phase 1 st : Phase 2 nd.
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
Project Management Processes
CONTRACT DOCUMENTS & CONSTRUCTION
Tracking time spent here with us today WO# Task code: 886
Project Management Processes
The emphasis of Construction Management and Preconstruction Services in the AEC industry Preconstruction Services Construction Management.
Chapter 2 – Review ‘construction management’
Presentation transcript:

CTC-470 Construction Administration Project Management Concepts

Homework Exercise #2

Project Management Concepts Application of knowledge, skills, tools, and techniques to complete project successfully Must balance quality, cost, schedule in a safe work environment –Cannot compromise safety Project Manager –Leader of contractor’s team

Project Manager Responsible for id’ing project requirements –Project site safety –On time –In budget –Must establish a project team –Must establish PM system to monitor execution and resolve issues

Major Phases of Project Project Planning –Evaluate risks –Develop PM structure to do project –Develop Communications structure On site and to other stakeholders

Major Phases of Project Project Start-up –Mobilizing project (office, equipment, labor to site) –Team building –Safety strategies –Initial project submittals to owner –Establish vendor accounts –Material and subcontractor procurement initiated –Project Cost, schedule and QC established

Major Phases of Project Project Control –Control of the project –anticipating risks and problems before they occur –Monitoring documentation for performance and procurement –Cost control and schedule control –Analyze performance reports and look for ways to minimize impacts

Major Phases of Project Project Close out –Completing physical construction of project –Submitting all documentation to owner Test results, warranties, occupancy permits Financial close-out

Major Phases of Project Post Project Analysis –Review all aspects of the project and looks for areas of improvement –Actual vs anticipated cost and schedule –Quality control –Subcontractor performance –Material suppliers –Equipment performance –Labor force preformance

Project Delivery Method Traditional –Owner has contracts with Designer & GC Communications follow lines –GC must go thru owner for all questions to Designer –Designer must go thru Owner with answers Owner Designer Consultants GC Subs

Project Delivery Method Agency Construction Management –Owner has contracts with Designer & GC and Agent Agent oversees project for owner –GC must go thru agent for all questions to Designer –Designer must go thru agent with answers Owner Designer Consultants GC Subs Agent

Project Delivery Method Construction Manager at Risk –Owner has contracts with Designer & CM/GC CM works with designer to finalize design –GC must go thru agent for all questions to Designer –Designer must go thru agent with answers Owner Designer Consultants Construction Manager/GC Subs

Project Delivery Method Design Build –Owner has contract with Design/Build Contractor Contractor does all design and construction in house Owner Design/Build Contractor Design Consultants Subs

Officer in Charge Project Manager Proj EngProcureClerical EstimatingSchedulingSuperintendent SafetyQCSubsForemen Project Management Organization Officer in Charge Project Manager Proj EngProcureClericalEstimatingSchedAccountCost Superintendent SafetyQCSubsForemen

Team Development PM needs to select individuals to fill positions Must get them to work together