GARP®Presentation ALRDC Seminar May 14 th, 2014 Daryl Mazzanti – Garp Services, LLC Wholly owned subsidiary of Evolution Petroleum Corp (EPM- NYSEMKT )

Slides:



Advertisements
Similar presentations
Total Well Management Lynn Rowlan Beam Pumping Workshop Houston, Texas
Advertisements

Slim hole Production Forrest Collier and Bill Hearn.
Oil and Gas Industry Presentation Activities, GHG Emission Sources, and Potential Reductions January 14, 2009.
Innovative Energy Technology July 2014
Chapter 3 COMPLETION.
SAGD ELift Applications
Investigation of New Tool to Unload Liquids from Gas Wells VortexFlowllc.com Cal Whibbs Premier Production.
Evolution Oil Tools Inc. (EOT) was formed in January of 2011 Headquarters in Calgary, Alberta, Canada Manufacturing, Assembly and Testing shops are in.
Salt water system. Function Hot Domestic service Cold Domestic service Fire main Sprinkler system Deck Wash Ballast system Engine and Equipment cooling.
Presented by: Alex Hageman ( Accelerated Production Services, Inc.) May 15 th, 2013 Multiple Stage Hydraulic Jet Pump Presented to ALRDC.
Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 ROD PUMPING OPTIMIZATION ROBERT WITTMAN, VP ENGINEERING FLOTEK INDUSTRIES, INC.
ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Unloading Water from Oil Wells Using Air.
INTEGRATED PRODUCTION SERVICES Wellhead Management from Day 1 December 11, 2001.
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
Inflatable DST Equipment An Overview Presentation.
INFLATABLE DST EQUIPMENT
Training in Oil & Gas Production for BP Technical Interns Section 9 – Chemical treatment system Chemical treatment systems are an important part of many.
ZF-100 The Paraffin & Asphaltene Solution. ZF-100 The Paraffin & Asphaltene Solution 72% Biodegradable, environmentally friendly ZF-100 is an aggressive.
Reciprocating Electric Submersible Pump (RESP)
Enhanced Oil Recovery using Computerized Hydraulic Lift Systems
TwO Stage Artificial Lift System (GARP®) New Improvements Hydraulic Fluid Assist (no Gas Required) Solids Separation & Control Packerless Design Free.
Adjustable Speed Drives (ASD): Failure Reduction and Production Optimization Notes go here. Frank Ochoa 07/25/2007.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Deliquification of Gas Wells using a Multi-Channel System TechCommCorp 219 Blood Rd. Chester, VT (802)
1 New Production Technologies for Lifting Liquids from Horizontal Wells Radius Energy, LLC May, 2015.
By M. Ghareeb (Lufkin Middle East) Luca Ponteggia (Agip, Italy)
Batch Pumping – A New Method to Solve Downhole Liquid Holdup Bill Elmer 2005 Beam Pumping Workshop.
TT Artificial Lift Utilizing CT as a Hollow Sucker Rod Humberto F. Leniek COIL TUBING AMERICAS Dr. William C. Maurer MAURER ENGINEERING INC.
Breakout Session Operator Issues. Attendance 5 Operating Company reps 3 Service Company reps Multi-Vote Gas Lock/Gas Separation (6) Problems setting TAC.
Completing & Producing A Well
Problem Wells Break out Session 2006 International Sucker Rod Pumping Workshop Houston, Texas.
To prevent cavitation:
Gas Lift Design Philosophy for Chevron’s Subsea Developments
Artificial Lift Systems
1 Update on ELift™ SAGD artificial lift Presentation to Artificial Lift & Low-Pressure SAGD Subcommittees Nov 2004 Ken Kisman Ph.D., P.Eng.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
2003 ASME/API GAS-LIFT WORKSHOP Dual Gas Lift – EMEPMI Experience
Installing Plunger Lift in Gas Wells Lessons Learned from Natural Gas STAR from Natural Gas STAR Exploration & Production, Gulf Coast Environmental Affairs.
Facilities Engineering *1 st draft By: Saha. Development options ProposalDevelopment OptionEstimated Cost (Mil) A FPSO converted to Tanker Hull 300 kbo.
Gas Well De-Liquification Workshop Denver, Colorado February 27 - March 1, 2006 Problem Identification, Candidate Selection, & Selection of Artificial.
Fuel injector The fuel is delivered by the fuel pumps to the fuel injectors or fuel valves. For the fuel to burn completely at the correct time, it must.
ALRDC Seminar New and Novel Artificial Lift Technologies ConocoPhillips, Houston, Texas May 14, 2014 Downhole Counterbalance Effect Tool Patent Pending.
NUMERICAL MODEL FOR THE PREDICTION OF FLUID PRODUCTION AND GAS CONSUPTION OF GAS CHAMBER PUMPS PDVSA INTEVEP Fall 2001 ASME/API Gas Lift Workshop Aberdeen.
Robert Lestz - Chevron 28 Feb 2006 Impact of Surface Facilities on Addressing Liquid Loading Breakout Session.
ARTIFICIAL LIFT METHODS
3rd Annual Appalachian Basin Gas Well Deliquification Seminar Marietta College, Marietta, Ohio June 4 - 6, 2012 Selection of Artificial Lift Method Breakout.
Submitted by Pradeep pataskar Roll no.11031M02034.
Introduction to Well Completions
Lecture 10 Production Engineering
Optimization of Liquid-Rich Shale Gas Wells using Multi-Channel Production Tubing Technology Commercialization Corp. 219 Blood Rd. Chester, VT 05143
Gas Lift Design Philosophy for Subsea Developments 2001 European Gas Lift Workshop.
Fluid Mechanics for Chemical Engineers Arif Hussain (Lecturer)
Dewatering Flowlines with Foamers C. Passucci, K.C. Hester, A. di Lullo Flow Assurance: Ensuring Production Today, Creating Solutions for Tomorrow.
Cost Effective Offset Well Frac-hit Protection Solution
Enhanced Plunger Lift System plunger Lift for the 21st Century
Seating Nipple By-Pass System
A PROPOSAL TO TRANSPORT FLUIDS FROM WELLHEAD TO FLOW STATION USING A GAS DISPLACEMENT PUMP. Juan Carlos Brown, 6th July 2017.
Areas of cooperation of RPF Factory “Izmeron”
Artificial Lift System And Sucker Rod Pumps
TUHWALP Introduction Cem Sarica.
STV-4 Series Rotary Lock Traveling Valve Eliminates ALL Gas Lock!
Fantail Well Services, LLC
New Oil and Gas Drilling and Production Technologies
Deviated Rod Pumped Failure Methods
CHAIR - JIM BENNETT EXXONMOBIL
Mohr Separations Research, Inc.
WELL COMPLETION AND STIMULATION BY BHARAT KUMAR HARANI ASSISTANT PROFESSOR DAWOOD UNIVERSITY OF ENGINEERING & TECHNOLOGY, KARACHI.
High Liquid Volume Plunger Lift in the Permian Basin
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
Presentation transcript:

GARP®Presentation ALRDC Seminar May 14 th, 2014 Daryl Mazzanti – Garp Services, LLC Wholly owned subsidiary of Evolution Petroleum Corp (EPM- NYSEMKT )

Outline Intro What is GARP®? What problem does it solve? Why is this a problem? Why choose rod pump and gas lift? How does it work? Results to date Pros / Cons Help from Industry

What is GARP® ? Gas Assisted Rod Pump Combination of two of the oil industry’s most reliable, understood, and popular forms of artificial lift (Rod Pumps and Gas Lift)

What problem does it solve ? Reduces back pressure over conventional forms of lift currently placed above deviated sections in horizontal wells and in vertical wells that are too deep to pump or have extended perforated intervals. This practice leads to production rate reduction, pre- mature abandonment, and a loss of reserves and leases

Why do operators do this? Operators are hesitant to place lift equipment in deviated sections and into perforated intervals due to inefficiencies and high operating costs associated with gas interference, solids issues, and wear and tear on tubulars

Why choose rod pump and gas lift? Rod pump -Well known/understood -Readily available parts -Workovers can be less expensive than other forms of lift -Lowers reservoir pressure better than other forms of lift Gas Lift -Well known/understood. Low maintenance costs (downhole) -Not affected by deviated section, solids, or gas locking -For short lift distances, provides a very efficient form of lift without exerting high back pressure on the reservoir -More effective in lifting deep reservoirs than other methods

GARP® First Generation Design Designed for 7” csg or larger Applicable to mainly older horizontal wells Dual wellhead w/ two adjacent tubing strings one for gas injection and one for the rod pump Requires a small two stage compressor Gas lift raises liquids a short distance from the deviated section to above the pump. Gas breaks out and rises to the surface, liquids fall and are trapped by a packer. Once they rise above the pump, they enter the pump chamber and are transported to the surface.

GARP®for Big Bore Wells (7” csg or larger)

GARP® Slim Hole Design Second Generation designed for wells with 4-1/2” casing or larger Applicable to nearly all vertical wells and modern horizontal wells Utilizes concentric tubing arrangement with a single wellhead Works with same principals as the larger bore design

G

When should GARP® be installed? GARP is most effective when other forms of artificial lift become inefficient or stop working due to liquid loading below the artificial lift equipment

GARP in the life of a well Flowing Artificial Lift -High Volume- Gas lift/ESP/Jet/PCP -Med- Low Volume – Rod Pump / Plunger/ Stop Cock/ Soap GARP® - not tested yet for rate acceleration in non-marginal wells Abandonment

Results to Date Has only been installed on company owned marginal wells Morgan Kovar #1 – Austin Chalk Horizontal well in Fayette County, Texas Selected Lands #2 – Georgetown/Buda Horizontal well in Grimes County, Texas Philips #1 – Austin Chalk Horizontal well in Grimes County, Texas Currently installing GARP® on a 10 well horizontal pilot program with an operator in the Giddings Field

Morgan Kovar #1 Rate vs Time

Morgan Kovar #1 Rate vs Cum

Selected Lands #2 Rate vs Time

Selected Lands #2 Rate vs Cum

Philips #1 Rate vs Time

Philips #1 Rate vs Cum

Advantages of GARP® Economically recovers reserves currently being left behind Significantly extends the life of leases A very efficient gas separation design allows rod pumps to be used in gassy wells The injection string in both designs can be utilized for a much more efficient placement of chemicals (corrosion, scale, salt) Combines two of the most well established forms of artificial lift capitalizing on specific strengths and minimizing weaknesses In the Slim hole version, a standing valve prevents load water from chemical/paraffin treatments from over-whelming low pressured reservoirs. This same design also allows the pump to be flushed using load water from casing injection to free stuck pumps.

Disadvantages of GARP® Does not overcome inherent limitations of rod pumps, i.e. solids production, wear and tear on moving parts, paraffin, etc. More costly to install than rod pumps alone since another tubing string is needed; however, most of these costs are tangible. Typical costs are ~ $100-$125K (not incl pumping unit, rods, pump) A pressured gas source is necessary. A small compressor can be built for ~$35,000 or it can be rented for ~$1700/mo.

Help from Industry Need opportunities to expand the technology Wells outside of the Giddings Austin Chalk Area Vertical oil or gas wells with extended perforated intervals Vertical oil/gas wells too deep to rod pump Rate acceleration test in non-marginal wells Willing to do pilot programs for no fee