Schedule Margin July 2013 NAVY CEVM 2 Outline Definition Program Management Perspective Background Policy/Standards Managing/monitoring Summary.
OPSM 639, C. Akkan Monitoring Progress How does a project get one year late? … One day at a time –Frederick P. Brooks MBWA: Management by Walking Around.
4/29/2015SFSU Auxiliary Business Services 1 How to Read Your Financial Statements Presented by San Francisco State University Auxiliary Business Services.
1 EVM Policy July 2013 NAVY CEVM 2 Outline DoDI DFARS DFARS DFARS June 2012 AT&L Policy Letter.
Provisional Billing Rates
Reference Guide Module 5: Billing November 2014 Reference Guide Module 5: Billing November 2014.
This presentation is designed to provide you information about Budget Transfers You can advance to the next screen at any time by hitting the forward.
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
1 Estimating Costs At Completion Review this tutorial and the Project Pyramid Exercise until you are fully comfortable with how to calculate an estimate.
What options do states have? What is Georgia planning to do? What are some of the other states doing? What are the possible implications to permit fees?
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
Copyright © Cengage Learning. All rights reserved. Chapter 3 Measuring Business Income.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e PPNM’s/PNM’s Date: 29 Dec 2006.
Consolidated Financial Statements – Intra-Entity Asset Transactions
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
PURPOSE OF PAYROLL CERTIFICATION 1 The Payroll Certification is an important tool for Fiscal Officers and/or Delegates. It’s purpose is to allow Fiscal.
Reporting on the Federal Financial Report “SF-425” Presented by HOMELESS GRANT AND PER DIEM PROGRAM and The Financial Service Center 1.
Measuring Business Income 3. Profitability Measurement: Issues and Ethics OBJECTIVE 1: Define net income, and explain the assumptions underlying income.
Billie Smith GSFC Procurement Operations Division December 8, 2004 Prenegotiation Position and Price Negotiation Memorandums.
IASB EMERGING ECONOMIES GROUP 7th MEETING May 28-29, 2014 National Organization for Financial Accounting and Reporting Standards Russia ISSUE FOR DISCUSSON:
Software Project Management (SPM)
Management & Development of Complex Projects Course Code - 706
EVM Home Page = = “One Book” DAU POC: (703) (DSN 655) Address: Revised.
POLICY & OVERSIGHT DIVISION (POD) February 2014 MILESTONE ACQUISITION PLANS TRAINING 1.
Chapter 14 Prepared by Richard J. Campbell Copyright 2011, Wiley and Sons Auditing Inventory Processes: Tracking and Costing Products in the Land Development.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Felix Sanchez Estimating the Budget and Cost (Part 1) Project Management for ARA Engineers and Scientists Developing a Bottoms Up Estimate.
Budget Planning & Development Presented by: Elizabeth Bay, Senior Budget Analyst Tammy Anthony, Assistant Budget Director Mary Simon, Senior Budget Director.
Project Cost Management
1 1 Nunn-McCurdy Legislation/Program Impacts Della McPhail Chief Financial Officer 308 ARSW DISTRIBUTION STATEMENT A: Approved for public release; distribution.
Rabbanai T. Morgan Chief, Contingency Contracting Element February 2005 Letter Contracts.
Angelica R. Armenta FAR Study Group – Jan Only contracting officers acting within the scope of their authority are empowered to execute contract.
Introducing Project Management Update December 2011.
 Funding Sources  Account Characteristics  Annual vs. Fiscal Allocation  Free and Cash Balances  Expenditures and Codes  Expense & Revenue Transfers.
Management & Development of Complex Projects Course Code - 706
ARIN VCalgary, Canada Members Meeting Agenda April 5, :30 Doors Open - Continental Breakfast 9:00 Meeting Called to Order 9:05 Adoption of Meeting.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
UCSF Medical Group Financial Process October 2, 2006.
Of Financial Accounting, 3e CORNERSTONES. © 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part,
Suppliers on Contract Purchase Order for Services.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
Lab-Wide Earned Value Management System Project Core Team Meeting May 28, 2008 Dean A. Hoffer.
1 Chapter 8 karvaytMélKMerag nig kareFVIr)aykarN_ nig karbiTKMerag Project Evaluation, Reporting, and Termination.
Information Technology Project Management, Six th Edition Kathy Schwalbe Copyright Disampaikan Oleh : Wiwid Dolianto S.Kom, MT Universitas Muhammadiyah.
E ARNED V ALUE M ANAGEMENT ‘G OLD C ARD ’ Projected Slip ? Management Reserve Cost Variance Schedule Variance ACWP Cum BCWP Cum BCWS Cum $ EAC Time Now.
Fiscal and Grants Management Presented by: Brian Jones, Director Office of Federal and State Grants Management 2012.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
EVM Home Page = Address: DAU POC: (703) (DSN 655) Revised December 2006 TERMINOLOGY.
Performance Measurement Baseline Contract Price (Project Price)
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Schedule Margin July 2013 NAVY CEVM
CONTRACT ADMINISTRATION
Performance Measurement Baseline Contract Price (Project Price)
Insurance IFRS Seminar December 2, 2016 Bill Horbatt Session 33
Contracting Officer Podcast Slides
Mastering Change Control
Letter Contracts Rabbanai T. Morgan
Purchase Order for Services
Schedule Margin July 2013 NAVY CEVM
Overview of Compliance, Surveillance, and Integrated Baseline Reviews
Schedule Margin July 2013 NAVY CEVM
Recognition of Scope Change in the IPMR July 2013 NAVY CEVM
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
Purchase Order for Services
Second Avenue Subway Project Execution Strategy
Presentation transcript:

Recognition of Scope Change in the IPMR July 2013 NAVY CEVM

2 Definitions IPMR requirements Example with scope added Example with scope removed (de-scope) Authorized Unpriced Work (AUW) Summary Outline

3 De-Scope – The removal of a specific scope of work from the contract (may be partially completed or all in future) Definitized – Work scope is “definitized” when the contract has been officially modified for the agreed upon scope & value Negotiated Cost – The contractually agreed upon cost of the definitized effort. This excludes fee Authorized Unpriced Work (AUW) – Budget/Work scope that has been authorized in writing by the Procuring Contracting Officer (PCO), but has not yet been definitized. It is typically supported by a Rough Order of Magnitude (ROM) estimate or Engineering Change Proposal (ECP) value. Fee is also excluded from AUW Definitions

4 Undistributed Budget (UB) – budget which is being held for specific known scope, but which has not yet been distributed to WBS elements at or below the reporting level Management Reserve (MR) – budget which is being held without specific known scope for management control purposes, such as risk mitigation activity Performance Measurement Baseline (PMB) = UB + Distributed budget (time-phased in control accts) Contract Budget Base (CBB) = Performance Management Baseline (PMB) + Management Reserve (MR) Contract Estimated/Target Cost = Negotiated Cost + AUW Definitions (Cont.)

Estimated Cost of Authorized, Unpriced Work (AUW) AUW value shall represent the Procuring Contracting Officer’s (PCO) best estimate of the authorized scope for inclusion in the baseline. Authorized, Unpriced Work is approved work scope that has not been definitized. The total dollar value (excluding fee or profit) of AUW shall be entered in Block 5.c AUW can never be a negative value. For effort de-scoped and not yet reflected in the Contract Budget Base (CBB), report the estimated value in Format 5 (see ). UB is used to accommodate temporary situations where time constraints prevent adequate budget planning or where contract effort can only be defined in very general terms. UB shall not be used as a substitute for adequate contract planning. Budgets shall be allocated within the PMB to responsible organizations at the earliest possible time, preferably within the next reporting period. UB can never be negative. If a contractual de-scope change occurs and the effort has not been removed from time-phased PMB, the amount shall be discussed in Format 5. Discuss when the de-scope will be removed from the PMB and placed into UB. IPMR Requirements

6 Government Contracts Officer authorizes ECP 105 scope AUW must reflect current scope change authorized in the current period. It is increased $100K based on ECP. UB is immediately increased by $100K until the amount can be distributed. Upon definitization of the change ($95K at cost): –The AUW pre-negotiated amount of $100K is eliminated –Negotiated Cost is increased $95K per the contract mod –UB is adjusted for the delta between the final negotiated value and the AUW/ECP value ($95K - $100K = $5K↓). In a situation where all UB has already been distributed and the negotiated value is less than estimated, the PMB must be reduced instead. –If not already distributed, the remaining UB balance for this scope is expected to be distributed within days. Contractual Change with Scope Added

7 Stop work order on ECP 105 is issued All ECP 105 effort stops, and the contractor begins identification and transfer of the budget/scope from the PMB to UB pending a contract modification Once the descope is definitized and all associated budget has been transferred from the PMB to UB, IPMR negotiated contract cost and UB are reduced –Negative AUW/UB entries should never be used to offset the PMB for a pending descope Until the budget/scope are completely removed from the IPMR, the contractor shall address in Format 5: –the total anticipated value of each pending descope –total PMB distributed portion of stop work/descope effort –the anticipated removal date Contractual Change with Scope Removed

8 Properly recorded, an AUW value provides a best estimate of the total cost of a specific piece of scope –The only way to limit AUW is to limit the scope statement Not to Exceed (NTE) amounts are funding constraints that temporarily limit spending only. An NTE does not limit scope or associated cost estimates Consider the following examples: –Authorization for ECP 1234 subject to a Not-To-Exceed $22M; where ECP is $100M at cost. AUW is increased $100M consistent with the ECP total scope. –Authorization for ECP 1234 long lead parts WBS XYZ only, subject to a Not – To – Exceed of $2M; where the long lead was proposed at $2M. AUW is increased $2M, consistent with the long lead authorization. Clarification of AUW

9 The IPMR DID requirements help standardize the way scope additions/deletions are reflected in IPMR reporting UB should be cleared as quickly as possible following contract modification –Into the PMB/MR for a scope addition –Removed from IPMR UB/negotiated contract cost for a descope AUW should be used for scope additions only, and neither UB nor AUW are allowed to be negative numbers Following a stop work or descope modification, the value and status of any pending descope actions must be conveyed in Format 5 If work is authorized prior to definitization, any AUW recognized must be driven by scope, not by an NTE limitation Summary

10 Point of Contact Navy Center for Earned Value Management (703)